You are on page 1of 1

C

C
L

FENCE TYPE II
WHEEL TURNING
TRACK

CLEANING TRACK #1

C
L

STABLING TRACK #6

C
L

STABLING TRACK #5

C
L

14.00m

C
L

7.00m

STABLING TRACK #4

STABLING TRACK #3

C
L

4.00m

5.00m

STABLING TRACK #2

C
L
4.00m

C
L
5.00m

STABLING TRACK #1

ROW

C
L

Fence Wall

4.00m

C
L

U-Ditch

s = 0.0035

s = 0.0035
SUB BALAST
BALAST

EXISTING GROUND

1.00m

0.94m

0.15m

0.15m

Road

0K+360
(39.455)

RETAINING WALL

s = 0.0035

A-A CROSS SECTION


C
L
WHEEL TURNING
TRACK

CLEANING TRACK #1

C
L

STABLING TRACK #6

C
L

STABLING TRACK #5

C
L

14.00m

7.00m

C
L

STABLING TRACK #4

STABLING TRACK #3

C
L

4.00m

5.00m

STABLING TRACK #2

C
L
4.00m

C
L
5.00m

C
L

STABLING TRACK #1

C
L

ROW

Fence Wall

4.00m

C
L

0.11m

s = 0.010

s = 0.010

EXISTING GROUND

SUB BALAST
BALAST

s = 0.010

0K+380
Road (39.418)

1.00m

0.91m

0.15m

0.15m

U-Ditch

RETAINING WALL
s = 0.0067

B-B CROSS SECTION

U-Ditch
1.30m

1.30m
1.06m

2.50m

1.30m

s = 0.010

s = 0.010

2.40m

s = 0.010

2.56m

C-C CROSS SECTION


1.30m

s = 0.010

D-D CROSS SECTION


NOTES:

ENDORSED BY

APPROVED BY

NOTICED BY

NAME

SIGNATURE

DEPOT
CROSS SECTION OF TYPICAL DRAINAGE

PRESIDENT DIRECTOR
VERIFIED BY
DIRECTOR OF
CONSTRUCTION

1:200

DESIGNED BY
PT. AECOM INDONESIA

PROJECT MANAGER

1/DPT/CIV/6803
1DPTCIV6803.dwg

You might also like