FENCE TYPE II
WHEEL TURNING
TRACK
CLEANING TRACK #1
C
L
STABLING TRACK #6
C
L
STABLING TRACK #5
C
L
14.00m
C
L
7.00m
STABLING TRACK #4
STABLING TRACK #3
C
L
4.00m
5.00m
STABLING TRACK #2
C
L
4.00m
C
L
5.00m
STABLING TRACK #1
ROW
C
L
Fence Wall
4.00m
C
L
U-Ditch
s = 0.0035
s = 0.0035
SUB BALAST
BALAST
EXISTING GROUND
1.00m
0.94m
0.15m
0.15m
Road
0K+360
(39.455)
RETAINING WALL
s = 0.0035
CLEANING TRACK #1
C
L
STABLING TRACK #6
C
L
STABLING TRACK #5
C
L
14.00m
7.00m
C
L
STABLING TRACK #4
STABLING TRACK #3
C
L
4.00m
5.00m
STABLING TRACK #2
C
L
4.00m
C
L
5.00m
C
L
STABLING TRACK #1
C
L
ROW
Fence Wall
4.00m
C
L
0.11m
s = 0.010
s = 0.010
EXISTING GROUND
SUB BALAST
BALAST
s = 0.010
0K+380
Road (39.418)
1.00m
0.91m
0.15m
0.15m
U-Ditch
RETAINING WALL
s = 0.0067
U-Ditch
1.30m
1.30m
1.06m
2.50m
1.30m
s = 0.010
s = 0.010
2.40m
s = 0.010
2.56m
s = 0.010
ENDORSED BY
APPROVED BY
NOTICED BY
NAME
SIGNATURE
DEPOT
CROSS SECTION OF TYPICAL DRAINAGE
PRESIDENT DIRECTOR
VERIFIED BY
DIRECTOR OF
CONSTRUCTION
1:200
DESIGNED BY
PT. AECOM INDONESIA
PROJECT MANAGER
1/DPT/CIV/6803
1DPTCIV6803.dwg