L34 S 75
FOUR YEAR B.TECH. DRGREE EXAMINATION
- APRIL,
2015.
POWERSYSTEMS-I(PSl)
(scHEME
2013)
Max. Marks: 70
Time : 3 Hours
1.
(10x1=10)
(a)
(b)
(c)
(d)
(e)
(0
(S)
(h)
(i)
6)
2. (a)
(b)
3. (a)
(b)
4. (a)
station.
(5)
Explain water tube boiler and condensers in thermal power stations. (10)
Draw and explain layout of gas turbine power
Explain nuclear reactor with neat
sketch.
plant.
(9)
(6)
A power station is to supply four areas whose peak loads are 10000 kw,
6Ob0 kw, 8000 kw and 7000 kw. The diversity factor of the loads at the
station is 1.5 and annual load factor is 65%. Find the maximum demand
(10)
on station and annual energy supplied.
Turn Over
(b)
(i)
(ir)
(iii)
(iv)
(v)
5.
(a)
&)
Demand factor
Load factor
Load curve
(5)
(a)
0.9lag.
(8)
Explain the concept of self GMD and mutual GMD for evaluating
inductance of transmission
7.
(7)
6.
improvement.
lines
(7)
&)
(a)
(b)
line.
(8)
line.
(7)
T-method.
(8)