SAIC-J - 6501 - Rev 0 PDF
SAIC-J - 6501 - Rev 0 PDF
SAIC NUMBER
SAIC-J-6501
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
DATE APPROVED
1-Oct-05
QR NUMBER
INST
CONTRACTOR / SUBCONTRACTOR
EQPT CODE
SYSTEM ID.
PLANT NO.
MH's SPENT
TRAVEL TIME
ITEM
No.
A.
ACCEPTANCE CRITERIA
REFERENCE
Documentation Review
A1
SAEP-16 Sec.
4.1.11 and SAEP1636 Sec 5 &6
A2
SAEP-16 Sec.
4.1.11 and SAEP1636 Sec 5 &6
A3
A4
A5
A6
A7
A8
A9
B.
B1
B2
SAEP-16 Sec.
4.1.11 and SAEP1636 Sec 5 &6
SAEP-16 Sec.
4.1.11 and SAEP1636 Sec 5 &6
SAEP-16 Sec.
4.1.11 and SAEP1636 Sec 5 &6
SAEP-16 Sec.
4.1.11 and SAEP1636 Sec 5 &6
SAEP-16 Sec.
4.1.11 and SAEP1636 Sec 5 &6
SAEP-16 Sec.
4.1.11 and SAEP1636 Sec 5 &6
SAEP-16 Sec.
4.1.11 and SAEP1636 Sec 5 &6
B3
B4
Page 1 of 7
SAEP-16
Sec. 4.1.13
SAEP-16
Sec. 4.1.13
SAEP-16
Sec. 4.1.13
SAEP-16
Sec. 4.1.13
PASS
FAIL
N/A
RE-INSP DATE
ITEM
No.
SAIC NUMBER
SAIC-J-6501
WBS / BI / JO NUMBER
ACCEPTANCE CRITERIA
REFERENCE
B5
SAEP-16
Sec. 4.1.13
B6
The loop testing shall be performed from the field instrument through to
the DCS maintenance consoles and associated systems located either
at the CCR or PIB control rooms.
SAEP-16
Sec. 4.1.13
B7
B8
C.
DCS loop checks may include verification of all PCS functions such as
database parameters, alarm initiations, trending, report generation,
graphics etc.
After successful completion of each loop check the individual loop
components shall be marked with a colored label bearing the date of the
loop check and the initials of the witnessing party.
The color code shall be : RED- Loop Check Complete.
SAEP-16
Sec. 4.1.13
SAEP-16
Sec. 4.1.13
Testing Method
C1
Ensure that all loop diagrams, cause and effects charts and logic
diagrams are available prior to testing.
SAEP-1636
Sec 5 & 6
C2
SAEP-1636
Sec 5 & 6
C3
SAEP-1636
Sec 5 & 6
C4
In The Field:
1. Action control valves with positioners, stroke may be checked with
stroke indicator and output signal from positioner shall be checked.
2. Control Valve stroke time shall be less than maximum time or larger
than the minimum time specified in the specification sheet.
3. Range of Transmitters and local controllers.
4. Indication of remote mounted output indicators.
SAEP-1636
Sec 5 & 6
SAEP-1636
Sec 5 & 6
C5
Page 2 of 7
DATE APPROVED
1-Oct-05
QR NUMBER
INST
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
ITEM
No.
C6
C7
C8
SAIC NUMBER
SAIC-J-6501
WBS / BI / JO NUMBER
ACCEPTANCE CRITERIA
REFERENCE
SAEP-1636
Sec 5 & 6
SAEP-1636
Sec 5 & 6
SAEP-1636
Sec 5 & 6
SAEP-1636
Sec 5 & 6
d) Apply the Command from DCS / field for open and close.
e) Verify the corresponding valve position in DCS / Field as applicable.
f) Verify the partial stroke function test of ZV.
g) Verify the valve action on air supply failure.
h) Verify the valve action on control signal failure.
i) Check the hand wheel / hand jack manual operation / function as
applicable.
j) On off valve loop test should be performed after completion of the air
piping works.
SAEP-1636
Sec 5 & 6
MOVs Loops:
a) Check and verify the DCS configuration for applicable points.
b) If any ESD logic / inter locking are involved in applicable loop, then
first normal condition should be prepared by forcing the applicable ESD
points on ladder logic and same procedure to be carried out for DCS
logic.
c) Check and verify the local / remote switch function.
d) Stroke the MOV from DCS / field on applicable commands such as
Open / Close and stop.
e) Verify the status of the MOV at DCS / Field.
f) Check the hand wheel manual operation / function if applicable.
SAEP-1636
Sec 5 & 6
Page 3 of 7
DATE APPROVED
1-Oct-05
QR NUMBER
INST
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
SAIC NUMBER
SAIC-J-6501
WBS / BI / JO NUMBER
ITEM
No.
ACCEPTANCE CRITERIA
REFERENCE
C9
Switches Loops:
a) Check and verify the DCS configuration for applicable points.
b) Simulate the contact operation (Make/Break) at the switch terminal
block and verify the status in the DCS/ESD. However, ESD switch case
actual pressure simulation to be provided.
c) ESD hand switches, Start / Stop, Open / Close hand switches shall be
checked by operating the switch mechanism.
SAEP-1636
Sec 5 & 6
C10
SAEP-1636
Sec 5 & 6
C11
SAEP-1636
Sec 5 & 6
C12
SAEP-1636
Sec 5 & 6
Page 4 of 7
DATE APPROVED
1-Oct-05
QR NUMBER
INST
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
ITEM
No.
SAIC NUMBER
SAIC-J-6501
WBS / BI / JO NUMBER
ACCEPTANCE CRITERIA
REFERENCE
C13
SAEP-1636
Sec 5 & 6
C14
SAEP-1636
Sec 5 & 6
C15
SAEP-1636
Sec 5 & 6
MCC Loops
a) MCC loops shall be executed after motor solo run test.
C16 b) Check and verify the DCS configuration for applicable points.
c) If any ESD logic / inter locking are involved in applicable loop, then
first
normal the
condition
be prepared
forcing
the applicable
d) Remove
controlshould
transformer
primarybyand
secondary
fuses forESD
the
applicable cubicle.
C17 e) Apply 120 VAC power (external power from building outlet) on the
secondary fuses load side to energize the control circuit.
f) Apply the Command from DCS / ESD / Field for start stop or trip as
REMARKS:
SAEP-1636
Sec 5 & 6
SAEP-1636
Sec 5 & 6
REFERENCE DOCUMENTS:
1. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), July 1993
2. Schedule Q -- Quality Requirements (Pro Forma Contract), November 2003
3. SAES-J-901, Instrument Air Supply Systems, 30 June 2003
4. SAEP-16- Project Execution Guide for Process Automation Systems,31 May 2003
5. SAEP-1636 Installation and Checkout Plan , 28 February, 2005
6. SAEP-1638 Site Acceptance Test Plan, 30 April, 2002
Page 5 of 7
DATE APPROVED
1-Oct-05
QR NUMBER
INST
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
ITEM
No.
DATE APPROVED
SAIC-J-6501
WBS / BI / JO NUMBER
ACCEPTANCE CRITERIA
REFERENCE
1-Oct-05
QR NUMBER
INST
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
ATTACHMENTS:
1. Attachment 1 -Instrument Loop Check Sheet And Pre Loop Check Sheet
NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products
or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
indicates compliance with appropriate standards or performance in a specified manner.
Contractor / Third-Party
Saudi Aramco
Construction Representative*
PMT Representative
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
PID Representative
QC Inspector
Performed Inspection
QC Supervisor
Name, Organization,
Initials and Date:
Y = YES
Page 6 of 7
N = NO F = FAILED
SAIC-J-6501
Unit No.:
System No.:
Loop No.
YES
NO
N/A
POINT DESCRIPTION
YES
NO
N/A
POINT CONFIGURATION
YES
NO
N/A
POINT RANGE (
YES
NO
N/A
YES
NO
N/A
CONTROLLER ACTION (
YES
NO
N/A
NO
N/A
ALARM (LL)
YES
NO
N/A
ALARM (L)
YES
NO
N/A
ALARM (HH)
YES
NO
N/A
ALARM (H)
YES
NO
N/A
INDICATION
YES NO N/A
RESET
YES NO N/A
ON
BY PASS
OFF
ON / START
RUNNING
OFF / STOP
STOPPED
OPEN
OPEN
CLOSE
CLOSE
STOP
CMDIS
INPUT
OUTPUT
(PPM/LEL)
SIMULATION RESULTS
TAG NO. :
25
25
50
50
75
75
100
100
75
75
50
50
25
25
RESULT
SWITCH ACTIVATES AT
SWITCH ACTION AT SET POINT
SWITCH RESET AT
Page 7 of 7