Professional Documents
Culture Documents
Taipei 101 (Taipei Financial Center) A New Challenge in Structural Engineering
Taipei 101 (Taipei Financial Center) A New Challenge in Structural Engineering
CONTENTS
Introduction
Structural Design
Construction Techniques
331 Earthquake
Summary
Introduction
2004 grand award for engineering by
American Popular Science Journal
A BOT project, awarded in 1997,
completed in 2004.
Impacted by natural and man made disasters
921 Chi-Chi Earthquake (9/21/1999)
911 terrorist attack in US (9/11/2001)
331 Earthquake (3/31/2002)
3
Introduction
Structural Features
Mega structural system for vertical and lateral loads,
including typhoon and strong earthquake
- 550 bored piles
- High strength and ductility structural steel with
RBS
- Columns infilled with high performance concrete
(10,000psi)
- Tunned mass damper to reduce wind vibrations
- Nonlinear time history analyses
5
Outrigger truss
Super-column
Shear wall
Pilings
Tower
Podium
Clay
Colluvium (1)
Colluvium (2)
Sandstone
FOUNDATION PLAN
A
1
1.6
2
3
10
11
12
13
14
15
16
17
18
19
H.5
MEGAFRAME ELEVATION
DESIGN CRITERIA
BUILDING TMD
16
10
8
6
Taiwanese Criteria (5 milli-g)
4
2
0
0.1
10
Without TMD
With TMD
17
1st mode
2nd mode
3rd mode
10
Seismic Analysis
X-SC1
X-12.2
X-12.9
Nonlinear TIME HISTORY ANALYSIS (
4000 TONNES
TENSION:
2200 TONNES
Silencer
Gravel
Reaction Mass
Combustion Chamber
Piston
Load Cell
Laser
Beam
Laser
Sensor
Transducer
Bearing Plate
Pile
Laser
Generator
SLURRY WALL
SUPER-COLUMN FABRICATION
WELDING OF SUPER-COLUMN
Welding Sequence
Preheat Pads
WELDING OF SUPER-COLUMN
ElectricPads
Pads
Electric
CROSS-SECTION OF SUPER-COLUMN
TMD CONSTRUCTION
CONSTRUCTION PROGRESS
1998
CONSTRUCTION PROGRESS
1998
CONSTRUCTION PROGRESS
1998
CONSTRUCTION PROGRESS
1999
CONSTRUCTION PROGRESS
1999
CONSTRUCTION PROGRESS
2000
CONSTRUCTION PROGRESS
2001
CONSTRUCTION PROGRESS
2001
CONSTRUCTION PROGRESS
2001
CONSTRUCTION PROGRESS
2001
CONSTRUCTION PROGRESS
2002
CONSTRUCTION PROGRESS
2002
CONSTRUCTION PROGRESS
2002
Acceleration(gal.)
60
20
0
-20
-40
Acceleration(gal.)
-60
0
Acceleration (gal.)
20
60
40
Time (sec.)
60
80
BP132 Station
N-S, PGA=57.85 gal
40
20
0
-20
-40
-60
0
20
200
40
Time (sec.)
60
80
300m
BT354 Station
E-W, PGA=193.09 gal
100
0
-100
-200
0
Acceleration (gal.)
BP132 Station
E-W, PGA=56.89 gal
40
200
150
100
50
0
-50
-100
-150
-200
0
20
40
Time (sec.)
60
BT354
80
BT354 Station
N-S, PGA=170.05 gal
BP132
20
40
Time (sec.)
60
80
51
DECK to 41F
Concrete floor to 34F
Curtain wall to 9F
ALIMAK
Podium
Tower
52
51F
47F
DECK41F
34F
H260M
32F
Crane fixed at
ground 2 ~ 3sec
9F
ALI MAK
Podium
Tower
53
SCA
M.2
M.9
P.1
P.7
SCB
#3Crane
M1250DX
SC1
12.2
12.9
14.1
14.7
#4Crane
M440D
SC2
#2Crane
M440D
#1Crane
M1250DX
54
M1250D
No.1 & 3
FAVCO
M1250DX
48 M
12 M
45.8 M
100 T
55
M440D
No.2 & 4
FAVCO
M440D
48 M
12 M
42.5 M
50 T
56
#2
57
#2
58
#2
59
#2
60
61
TR3
62
TR3
63
#2 64
#24~6F
#24~6F
65
66
#24~6F
67
68
#4
69
#4
70
#4
71
72
73
CONSTRUCTION PROGRESS
2003
CONSTRUCTION PROGRESS
2003
CONSTRUCTION PROGRESS
2003
CONSTRUCTION PROGRESS
2003
2004
ACKNOWLEDGEMENT
The materials presented in this seminar
are provided by Evergreen Consulting
Engineering Consultants, Inc., Taipei,
Taiwan