REINFORCING BARS
MARK THICKNESS REMARKS
PARALLEL TO PARALLEL TO
LONG SPAN SHORT SPAN
S-1 100mm+FIN. UP 2 OUT OF 3 @ L/4 FROM UP 2 OUT OF 3 @ L/4 FROM TWO - WAY
FACE OF SUPPORT FACE OF SUPPORT
S-2 100mm+FIN. UP 2 OUT OF 3 @ L/4 FROM UP 2 OUT OF 3 @ L/4 FROM TWO - WAY
FACE OF SUPPORT FACE OF SUPPORT
S-4 120mm+FIN. UP 2 OUT OF 3 @ L/4 FROM UP 2 OUT OF 3 @ L/4 FROM TWO- WAY
FACE OF SUPPORT FACE OF SUPPORT
1 13
400 A
100 300
25
150mm THK. CHB. WALL
400 A
150 1200
SPACED AS SHOWN
BARS SPACE AS SHOWN
200
25 75
(ANCHORED TO COLUMNS)
100 100
100mm THK. BARS @ 250mm O.C.
100
600
500
150mm THICK R.C. WALL
400
400
CONC. PLATFORM
FINISH FLOOR LINE CORRIDOR
FINISH FLOOR LN.
BARS @ 250mm O.C.
G-2 B-2
300
200
VARIES
100mm THK. WELL
FINISH GRADE LN.
COMPACTED GRAVEL FILL
FINISH GRADE LINE
300
HORZ. BARS @ EVERY 3rd LAYER
DETAIL SECTION OF CANOPY
4 OF MAIN ENTRANCE R
C B
7000
1613 1613
@ 250mm O.C.
CONC. PLATFORM
FINISH FLOOR LINE
A
5 DETAILS OF HAND WASH
S-5 SCALE 1:20 M
BUREAU OF DESIGN TWO (2) STOREY, TEN (10) DETAILS OF LAVATORY HANDWASH
DETAIL OF CONC. SEATING
MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE BOD
S-5
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING DETAIL SECTION OF CANOPY
CHECKED:
ENGINEER II JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
11 67
TYPICAL GIRDER /BEAM DETAILS SIGNED B
KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER IN CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES, DPWH SECRETARY, DEPED
BONIFACIO DRIVE PORT AREA, MANILA
ENGINEER IV