TYPICAL VOLUME TYPICAL VOLUME

TYPE PROFILE AND DIMENSIONS TYPE PROFILE AND DIMENSIONS


USE m³ / m USE m³ / m

BARRIER KERB 0.154 BARRIER 0.102 520


SA SL
AND KERB AT 30 150 30 300 10
30 150 30 500
CHANNEL TRAFFIC

ADJACENT TO ISLANDS

150
110
40
FOOTWAY WITH

300
DRAINAGE

320

150
170

N
MI
*

SM BARRIER 0.043

KERB AT 30 150 30
SB DISHED VARIABLE
1 000
TRAFFIC
CROSSING MINIMUM
500 500 ISLANDS

40
0.170

150
15

230
80
150

N
MI
*

SO DISHED VARIABLE 1 000


RAISED 0.098 CROSSING, MINIMUM
SE 540 500 500
MEDIANS AND INCREASED 0.200
20 70 160 300 10 WATERWAY
TRAFFIC

100
ISLANDS

100
WITH

250

150

N
MI
DRAINAGE
*

150
RT URBAN, 0.138 760

ALLOWS
SF RAISED 0.043 50 340 360 10
VERGE /

00
MEDIANS AND

R 3
20 70 160 10

30
/ FOOTWAY
TRAFFIC

300
PARKING
ISLANDS
100

255

N
MI

180

N
MI
210

150

N
MI
30
80

HPRK REDIRECTIVE 0.25


SFM RAISED 0.092
KERB
MEDIANS AND (BOWE)
20 300 160 10 250
TRAFFIC
REFER TO
ISLANDS WITH
100

R0300-12
MOWING STRIP
210

100
N
MI

FOR DETAILS
30
80

50

100
ED
FCOPI

550

150
NCOMPLETE I

SK CHANNEL VARIABLE 1 200


ADJACENT TO MINIMUM
NAL

600 600
NOTES
GI

SHOULDERS IN 0.276
ZE ORI

CUTTINGS 1. ALL EXPOSED EDGES, EXCEPT FOR HPRK, TO BE ROUNDED TO


N COLOUR AND MAY BE I
50mm ON A3SI

5 mm RADIUS MAXIMUM, UNLESS STATED OTHERWISE.


200

120

NOT 2. EDGES OF HPRK TO BE ROUNDED TO 25mm RADIUS MAXIMUM, UNLESS


550
TRAVERSABLE STATED OTHERWISE

790 3. FOR KERB CONSTRUCTED ON CONCRETE PAVEMENT, REFER TO ROADS


150

N
MI
45

AND MARITIME SERVICES RIGID PAVEMENT STANDARD DRAWINGS.


*
* RECESS AT BASE OF KERB MAY BE REQUIRED FOR SUBBASE LAYER.
40
NG MAY BE PREPARED I
35
30

A3
25

ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE SHOWN


STANDARD DRAWING
SCAN TO CHECK
QR CODE REV DATE AMENDMENT / REVISION DESCRIPTION WVR No. APPROVAL SCALES ON A3 SIZE DRAWING CONTACT DETAILS ISSUED ROAD DESIGN ENGINEERING
20

DOCUMENT VER.

1 2.2.2017 Dimension errors corrected SFR


SEND FEEDBACK ON THIS STANDARD
SFR
........................................................................................................ R0300 KERB AND CHANNEL SERIES
15

2 24.11.17 Dimension lines of SF and SFM kerbs amended SFR


3 01.11.22 Type F barrier replaced by HPRK kerb. SK channel typical use modified AR DRAWING TO :
MANAGER ROAD POLICY, SPECIFICATIONS & TECHNOLOGY
STANDARD KERB AND CHANNEL SHAPES
........................................................................................................
S DRAWI
10

technologystandards@transport.nsw.gov.au SHEET 1 OF 1
PREPARED BY STANDARD DRAWING No. REV.
DATE 20.01.17
.........................................
ADVANCED TECHNICAL SERVICES R0300-01 3
5

ROADS & TRAFFIC ENGINEERING


THI

STATUS EDMS No. ORIGINAL ISSUE DATE


ROAD STANDARDS & TECHNOLOGY ISSUED DS2014 / 005889 JANUARY 2017
0

© Transport for NSW

You might also like