You are on page 1of 4

CHECKLIST FOR STARTER OF COLUMN

SR NO

FOR STARTER OF COLUMNS

SR NO
1
2
3
4

CHECKLIST FOR STARTER OF COLUMNS


DESCRIPTION
YES
SHUTTERING
SIZE OF COLUMNS OK
PLUMB OF STARTER OK
RIGHT ANGLE OK
ALINGMENT OK

6
7

STARTER POSITION AS PER CENTERLINE WITH


REFERNCE TO FACE COLUMNS
SUPPORTING OK
PVC PIPE INSERTED FOR TIE ROD

1
2
3
4

REINFORCEMENT
STIRRUPS AS PER SCHEDULE
LINKS AS PER SCHEDULE
VERTICALS AS PER SCHEDULE
LAP FOR VERTICALS OK

1
2
3
4
5

GENERAL
CLEANING AND ROUGH OF SLAB SURFACE
LATINCE REMOVED FROM STEEL
COVER TO STEEL AVAILABLE
SHUTTERING OIL APPLIED
JOGGLE IF ANY SHOULD BE IN 1:6 ONLY

LINE DORI CHECKED CAREFULLY FOR ANY


DISTURBANCE

LINE DORI TIED BY TAKING PLUMB FROM


BELOW FLOOR
RIGTH ANGLE OF DORI CHECKED
OUT TO OUT DIMENSION CHECKED

8
9

F COLUMNS
NO

NA

REMARK