CHECK LIST FOR FINAL INSPECTION

REPORT No:----------------------------------- DATE :----------------------------

Floor NO : -------------------- DRAWING NO: -------------------- LOCATION:----------------


Zone N ….......................

RESULT
SL. NO. ITEM TO BE CHECK
ACCEPT REJECT
1 Column alignment

2 Tie Beam Fixing

3 Column Bolt with washers and Tourqe Tightening

4 Column base pad plates welding

5 Tie Beam Bolt with washers and Torque tightning

6 Tie Beam stifners and Guset Plats installed


PERMANENT ATTACHMENTS ARE CORRECTLY
3 INSTALLED
4 TEMPORARY ATTACHMENTS ARE REMOVED

ALL WELDS AND Cleaning WORKS ARE


5 COMPLETELY PERFORMED

7 Bracing installation and Bolt tightning

8 Is Ducking sheet level as per wrawings


Is screwed all
deck steets
9 properly
9 TOUCH-UP PAINT/ COATING ARE COMPLETED
10 Hilty screw fixing on decking sheet properly

11 is structurals IS COMPLETED CLEANED

12 welding spader any Tack weld if any


SIGNIFY COMPLETED AND READY FOR FINAL
13 CLOSURE
14 OTHERS
Vertical coliares TPI
NAME
SIGNATURE
DATE
DOCUMENTNO: Vertical /2023- 03/01
N

CATION:------------------

REMARK