FAKULTI KEJURUTERAAN PEMBUATAN

UNIVERSITI TEKNIKAL MALAYSIA MELAKA


PRODUCTION TOOL DESIGN PROJECT 1
BMFR 3143

SEMESTER 1

SESSION 2016/2017

DESIGN OF JIG/FIXTURE
DUE DATE FOR SUBMISSION: FRIDAY, 21 OCTOBER 2016 - 5.00 PM.

Design a JIG or FIXTURE for machining or inspection processes. You are free to define the
part and the operation required to produce the part. The complexity of the part and
manufacturing/ machining operation implies to the project mark. A part with high complexity
of design and manufacturing operation deserves higher mark rather than a part with less
complexity of design.
The report should consists of the followings:
1.

Part Model/ workpiece (All drawings should follow the standard drawing format:
views, section view if any, GDT, notation, material, processes e.g. heat treatment
etc.).

2.

Explanation about the manufacturing processes/ operation or inspection process.

3.

Jig or fixture assembly drawing and details drawing for each parts (All drawings
should follow the standard drawing format: views, section view if any, BOM, GDT,
notation, material, processes e.g. heat treatment etc.).

4.

All designs (workpiece and jig or fixture) are free to use any CAD software
(Solidworks/ CATIA/ Mechanical Desktop), or manual drawing.

5.

The design of jig or fixture should apply the principles of locating, supporting,
work-holding and clamping

6.

Explanation about the jig or fixture function, operation and mechanism.

The project mark is 30% of the total mark.


Late submission of the report will incur a penalty on the mark of 5% (of 100%) per day.
Students with copy and paste of design will be penalized 0% for both.