You are on page 1of 1

Model Matematik Sistem Transmisi MA Umbulan

Hazen William C :

V (m/s): P-max
1900 1,55
6,7
1900 1,51
6,0
1900 1,48
6,0
1900 1,44
6,1
1800 1,51
8,5
1800 1,46
8,2
1800 1,43
7,6
1800 1,39
7,8
1700 1,54
7,4
1700 1,47
7,2
1600 1,56
6,8
1600 1,41
6,5
1600 1,36
6,3
1400 1,65
6,1
1400 1,43
6,2
1200 1,77
5,6
1000 1,40
6,2

Profil Hidrolis Pipa Transmisi MA Umbulan


120
100
Elevasi (m)

Spesifikasi Pipa :
ND-Pipa1 (mm) :
ND-Pipa2 (mm) :
ND-Pipa3 (mm) :
ND-Pipa4 (mm) :
ND-Pipa5 (mm) :
ND-Pipa6 (mm) :
ND-Pipa7 (mm) :
ND-Pipa8 (mm) :
ND-Pipa9 (mm) :
ND-Pipa10 (mm) :
ND-Pipa11 (mm) :
ND-Pipa12 (mm) :
ND-Pipa13 (mm) :
ND-Pipa14 (mm) :
ND-Pipa15 (mm) :
ND-Pipa16 (mm) :
ND-Pipa17 (mm) :

3597714

80
60
40
20
0
0

10

20

130
Sur (+)
Note
Main Pump:
1
Kebutuhan Air (L/s) = 3.920
ok
Debit pompa (L/s) = 4.400
ok
Head Pompa (bar) =
6
ok
Kebutuhan Daya (kW) = 3.269
not ok
Elevasi pompa (m) = 22,0
not ok
Elevasi pipa hisap (m) = 27,0
ok
Statics suction (m) = (5,0)
ok
Discharge Head (bar) = 6,50
ok
Specific Energy (kWh/m3) = 0,232
ok
Biaya Energi (Rp/m3) = 278
ok
Jumlah Pompa (unit) =
9
ok
Pompa beroperasi (unit) =
8
ok
Pompa cadangan (unit) =
1
ok
Kapasitas Pompa (L/s) = 550
ok
Daya Pompa (kW) = 409
ok
Tegangan (Volt) = 3300
not ok
Arus Listrik (Amper) = 124
Efisiensi Pompa = 85%
Efisiensi Motor Listrik = 95%
Tarif Energi (Rp/kWh) = 1200
Biaya Energi Pemompaan (Milyar Rp/Th) = 34,4
Max Day Factor (Supply vs Demand) = 1,12

Cal- Min
Kebutuhan Air (L/s) : P (m) P (m)
Total Kebutuhan: 3.920
Winongan-(1): 125
55,8 46,81
Pohjentrek-(2): 75
56,5 42,06
Pleret-(3): 110
60,0 40,17
PIER-(4): 100
28,5 64,46
Bangil-(5): 140
59,9 74,24
Gempol-(6): 70
74,6 69,5
Porong II-(7): 100
76,3 70,46
Porong I-(7): 50
74,0 66,51
Tanggulangin-(8): 150
73,5 65,08
Candi-(9): 200
71,8 58,78
Sidoarjo-(10): 300
67,2 54,37
Buduran-(11): 100
63,7 51,37
Gedangan-(12): 200
60,7 45,13
Waru-(13): 200
61,5 40,18
Alas Malang-(15): 1000 49,8 41,71
Giri-(17): 1000
7,4
7,43
Elevasi Outlet (m) =
Kedalaman Pipa (m) =
Ketinggian suction (m) =
Max positive suction (m) =

-5
1,5
5,0
???

30

40

50

60

70

80

90

100

Jarak (km)

Sur (+)
BP 1:
3.510
3.850
6
2.861
40,0
40,0
0,0
6,00
0,203
243
8
7
1
550
409
3300
124
85%
95%
1200
30,1
1,10

Blnc Sur (+)


Material Pipa (Karat) = Steel
Main and Booster Pumps
BP 2: BP 3:
730
Rp/m3
Biaya Energi Pemompaan
2.200 1.000
90,2 M Rp/Th
Biaya Energi Pemompaan
2.200 1.100
6
6
Thrust Block:
Water Hammer:
BP 1: BP 2: BP 3:
1.635
817
Diameter pipa (mm) = 1900
MP
V (m/s) = 1,55
10,0
40,0
Internal pressure (bar) = 9,5
1,51
1,43
1,40
10,0
40,0 Soil Bear Cap (kg/cm2) = 25
L pipe (m) = 21.000 51.000 20.400 1.352
0,0
0,0
Change in Direct, (deg) = 90
Material = Steel Steel Steel Steel
6,00
6,00
Thrust block area (m2) = 1,52
WH (bar) = 16,7
16,3
15,4
15,1
0,116 0,058
0,608
T-c (min) = 1,3
3,2
1,3
0,1
139
70
Cathodic Protections:
5
3
Life Time (Tahun) = 2,0
4
2
Mag Consp (Lbs/A-Th) = 18,0
1
1
Anode Weight (Lbs) = 32,0
Manual Calculation ! Check-Recheck !
550
550
Total Biaya (Milyar Rp) = 24,1
BP 1: BP 2: BP 3:
409
409
Unit Cost (Rp/m3) = 19,5
Surge Tank: MP
3300 3300
Volume Surge Tank (m3) = 307
503
165
18
124
124
Tekanan Udara Aktif, Pe (atm) = 6,50
6,00
6,00
6,00
85%
85%
Tekanan Udara Pasif, Pd (atm) = 1,65
0,20
1,95
5,05
95%
95%
Tebal Plat Tangki Baja (mm) => 12,1
14,0
9,7
5,6
1200 1200
Panjang Silinder/Tinggi Silinder (m) = 10,0
10,0
8,0
4,0
17,2
8,6
Diameter Silinder (m) = 6,3
8,0
5,1
2,4
1,00
1,10

You might also like