Glossary
Kev Terms Used
ANALYSES MAINTENANCE

The process of identifying required


maintenance functions through analysis
of a fixed or assumed design and determining the most effective means of accomplishing these functions.
A number of parts, subassemblies, or
ASSEMBLY
any combination thereof joined together
to perform a specific function and
which can be disassembled without destruction of designed use.
NOTE: The distinction between an assembly and a subassembly is not always exact - an assembly in one instance may
be a subassembly in another where it
forms a portion of an assembly.
AIR TRANSPORT ASSOCIATION An organization of primarily domestic
U.S. Air Transport carriers with the
OF AMERICA (ATA)
purpose of developing standard specifications and policy for the industry.
BUILD GROUP (ASSEMBLY
A group of parts as defined in the
engine build specification.
GROUP ) (BG)
BUILD GROUP COMPONENT
A Subassembly or part of a
Build Group.
(BGC)
BUILD GROUP STACK-UP
Two or more Build Groups
mechanically joined together.
(BGS
BASIC ENGINE
Those units and components which are
used to induce and convert fuel/air
mixture into thrust/power; to
transmit power to the propeller
shaft, if any, and accessory drives;
to supplement the function of other
defined systems external to the
engine; and to control and direct
the flow of internal lubrication.

PAGE
14
DATE: DEC 1/88

V 2 5 0 0 Propuls~on Sysrern
F A C I L I T I E S EQUIPMENT M A N U A L

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS

Glossary (Continued)
Key Terms Used
COMPONENT
(UNIT)

Any self-contained part, combination


of parts, subassemblies or units,
which perform a distinctive function
necessary to the operation of a system.

CYCLES, SINCE
NEW (CSN)

The operating cycles an item has


accumulated since new.

CYCLES, SINCE
OVERHAUL (CSO)

The operating cycles an item has


accumulated since last overhaul.

CYCLES, SINCE
REFURBISHMENT
(CSR)

The operating cycles an item has


accumulated since last refurbishment.

CALIBRATION

The application of specifically known


and accurately measured input to
ensure that an item will produce
specifically known output which is
accurately measured or indicated.
Calibration includes adjustment or
recording of corrections, as appropriate.

CANCELLED

Determined to be no longer usable in


a particular former application.

DELETED

See cancelled

ENGINE BUILDUP HARDWARE

Those portions of the following systems which are on the Nacelle side of
the airframe/nacelle interface such
as: fuel, hydraulic, pneumatic, fire
detection, electrical, generating and
cooling systems, engine control,
nacelle drain and vent, starting,
nacelle and engine instrumentation,
inlet anti-icing, and engine vibration monitoring.

ENGINE BUILD SPECIFICATION


(EBS)

A breakdown of an engine bill of


materials into groups of parts required to support a sequence of tasks
required to build a section of the
engine.

PAGE 15
DATE: DEC 1/88

--

INTERNATIONAL AERO ENGINES


V2500 P r o p u l s ~ o n Svsrem
FACILITIES EQUIPMENT M A N U A L

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS

Glossary (Continued)

Kev Terms Used


ENGINE FLIGHT
HOURS

The accumulated engine operating time


intervals between wheels-off and
wheels-on.

ENGINE OPERATING CYCLE

A completed engine thermal cycle


including the application of takeoff
power.

ENGINE SECTIONALIZATION

The disassembly of the engine into


major Build Groups.

Engine Pressure Ratio


(EPR)

A prime practical measure of engine


thrust.

ENGINE

The basic engine assembly plus its


essential accessories as supplied by
the engine manufacturer.

Engine Build Unit (EBU)

The EBU comprises the engine plus


those additional components necessary
to dress the engine for installation
into the nacelle to further form the
powerplant. (REF. SECTION 3)

FACILITY COMPLEX

The physical plant including support


equipment required to perform all of
the functional tasks that satisfy a
level of logistics support.

FACILITY EQUIPMENT

Those items used for engine maintenance which are commercially available from vendors other than IAE and
generally are not specific to a single engine model. Such equipment ranges in complexity from bridge crane
systems to micrometers and hand files.

FACILITY ITEMS

A major functional area of a facility


which may have a department status.

PAGE 16
DATE: DEC 1/87

INTERNATIONAL AERO ENGINES


V 2 5 0 0 Propulsion Sysrem
FACILITIES EQUIPMENT M A N U A L

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS

Glossary (Continued)
Key Terms Used
FLYING HOURS
(AIRBORNE)

FLYING HOURS
(BLOCK)

The accumulated time intervals between wheels-off and wheels-on.


The number of hours incurred by an
airplane from the moment it first
moves for a flight until it comes to
rest at its intended blocks at the
next point of landing, or returns to
its departure point prior to takeoff.
NOTE: Push-out from the gate is
considered as part of block hours.

FOREIGN OBJECT
DAMAGE (FOD)

Damage to any portion of the engine


caused by impact or ingestion or
birds, stones, hail or other debris.

HEAVY MAINTENANCE FACILITY

A facility limited to the accomplishment of all engine (powerplant)


maintenance performed short of
overhaul with the engine removed
from the aircraft.

HOT SECTION INSPECTION (HSI) Inspection of the combustion area.


INSPECTION

An examination of an item against a


specific standard.

ITEM, LIFE LIMITED

ITEM

Any level of hardware assembly


(i.e., system, subsystem, module,
accessory, component, unit, part,
etc. )

LINE MAINTENANCE FACILITY

A facility limited to the accomplishment of all engine (powerplant)


maintenance performed with the engine installed in the aircraft.

part/item which must be removed


from service and discarded before
a specified time is achieved.

PAGE 17
DATE: DEC 1/87

--

,-

,/-

-,

li/i_-d--

INTERNATIONAL AERO ENGINES


V2500 P r n ~ ~ ~ l s S
i cy n
srem
FACILITIES EQUIPMENT M A N U A L

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS

Glossary (Continued)
Key Terms Used
MAINTENANCE

Those actions required for restoring


or maintaining an item in serviceable condition, including servicing, repair modification, overhaul,
inspection and determination of
condition.

MANDATORY
MODIFICATION

A modification classified as compulsory by the local civil aviation


authorities.

MEAN TIME BETWEEN


REMOVALS (MTBR)

A performance figure calculated by


dividing the total unit flying hours
accrued in a period by the number of
unit removals (scheduled plus unscheduled) that occured during the
same period.

MEAN TIME BETWEEN


FAILURE (MTBF)

A performance figure calculated by


dividing the total unit flying hours
(airborne) accrued in a period by
the number of unit failures that
occured during the same period.
NOTE: Where total unit operating
hours are available, this may be
used in lieu of total unit flying
hours.

MODIFICATION

A change instructed by a Service


Bulletin.

MODIFICATION NO./
SERVICE BULLETIN
NO.

The manufacturer's identifying number for a certified engineering


change.

MODIFICATION,
OPTIONAL

A modification which may be incorporated at the discretion of the


operator.

PAGE 18
DATE: DEC 1/87

- /-;1

INTERNATIONAL AERO ENGINES


V2500 Propuls~onSystem
F A C I L I T I E S EQUIPMENT M A N U A L

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS

Glossary (Continued)
Key Terms Used
MODULE

A work package determined by the


engine customer to implement the
Modular Overhaul Concept

Note that a module may be a stackup of several Build Groups, a Build


Group and components of another
Build Group or only a component of a
Build Group.
NACELLE

The hardware enveloping the engine


up to the airframe structure/engine
mount interface. The Nacelle consists of at least the following
major components: inlet (nose) cowl,
wing engine fan cowl doors, tail
engine fan cowl doors (if required),
fan duct/f an thrust reverser,
primary nozzle and plug, Engine
Buildup Hardware, and engine mounts.

OVERHAUL FACILITY

A facility that can accomplish


overhaul (zero time) of the engine
(powerplant) and its parts and accessory components.

OVERHAUL
(RECONDITION)

The work necessary to return an item


to the highest standard specified in
the relevant manual.

PART

One piece, or two or more pieces


joined together which are not normally subject to disassembly without
destruction of designed use.

QUICK ENGINE CHANGE


UNIT (QECU)

A maximum neutral engine plus those


parts making it peculiar to a particular position on an aircraft.
(REF SECTION 3)

RECONDITION
( OVERHAUL)

The work necessary to return an item


to the highest standard specified in
the relevant manual.

PAGE 19
DATE: DEC 1/87

-7

= ,

,,,'=BE,

INTERNATIONAL AEEO ENGINES


J 2 5 0 0 P:opuls~cn Svsrern
F A C I L I T I E S EQUIPMENT M A N U A L

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS

Glossary (Continued)
Key Terms Used

REFURBISH
(ENGINE, MODULE)

To restore an engine or engine


module to ensure that cost-effective
operation is achieved.

REPAIR

To make an item serviceable by replacing or processing failed or


damaged parts.

RESTORATION

That work (on/off the aircraft),


necessary to restore the item to a
specific standard.

REWORK

To carry out work on an uninstalled


item.

REPLACE

The action whereby an item is removed and another item is installed


in its place for any reason.

SECTION

A major functional area of a department of a facility.

SERVICING

Any act of replenishment for the


purpose of maintaining the inherent
design operating capabilities of an
item.

SERVICE BULLETIN (SB)

The only document issued by the


manufacturer to notify the airline
of recommended modifications, substitution of parts, special inspections/checks, reduction of existing
life limits or establishment of
first time life limits and conversion from one engine model to another.
NOTE: ATA Specification No. 100
describes the recommended content of
the document.

PAGE 20
DATE: DEC 1/87

,=
,-

-1

INTERNATIONAL AERO ENGINES


b'2500 Propuls~onSystem
F A C I L I T I E S EQUIPMENT M A N U A L

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS

Glossary (Continued)
Kev Terms Used
SHOP VISIT
(ENGINE SHOP VISIT)

An engine removal is classified as a


"shop visitwwwhenever the subsequent
engine maintenance performed prior
to reinstallation entails one of the
following:
a) separation of pairs of major
mating engine flanges.
NOTE: Separation of flanges
solely for purpose of shipment, without subsequent internal maintenance, is not a
nshop visitn.
or b) removal of a disk, hub, or spool.

SUPPORT EQUIPMENT

Equipment required on the ground to


support the operation and maintenance of the aircraft and all its
airborne equipment.

SPECIAL SUPPORT EQUIPMENT


(Tools)

Those engine manufacturer designed


items used for engine maintenance
support which are generally unique
to a specific engine model.

SERVICE PROCESS
OPERATION PROCEDURE
(SPOP)

Pratt & Whitney approved procedures


for processing engine parts during
maintenance and repair. SPOP procedures are available covering activities within the following sections in the shop: cleaning, inspection (fluorescent penetrant, magnetic particle), plating and stripping, surface treatment and painting, heat treatment, grinding, and
blending.
Two or more parts which form a portion of an assembly or component
replaceable as a whole, but having a
part or parts which are individually
replaceable.

SUBASSEMBLY

TIME SINCE INSTALLATION


PSI)

The time accumulated since a given


item was last installed.
PAGE 21
DATE: DEC 1/87

-- .y

,/T:

-.

INTERNATIONAL AERO ENGINES


V2500 Propulsion System
FACILITIES EQUIPMENT M A N U A L

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS

Glossary (Continued)
Key Terms Used
TIME SINCE OVERHAUL
(TSO)

The time accumulated since a given


item was overhauled.

TIME SINCE REF'URBISHMENT


(TSR)

The time accumulated since a given


item was last refurbished.

TOTAL TIME, TIME SINCE NEW


(TSN)

The operating time an item has accumulated since new.

TIME TYPE INDICATOR

Indicates the type of time information supplied (e.g., TSN, TSO, TSR,
etc.)

TIME BETWEEN OVERHAULS


(TBO

The maximum time that an item is


permitted to operate between overhauls.

TIME SET TO ZERO

An indicator showing that a rework


at least to the level of refurbishment defined in the maintenance
management plan has been carried out
on the item. This indicator is used
to reset the time base against which
soft time will be measured at the
time of next removal.

WORK STATION

A minor functional area in a department of a facility. Any machine


or functional system within an area
may be classified as a work station
when it is desired to analyze its
facility requirements.

PAGE 22
DATE: DEC 1/87

INTERNATIONAL AERO ENGINES


V2500 Propuls~onSystem
F A C I L I T I E S EQUIPMENT M A N U A L

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS

Glossary (Continued)
Abbreviations

&

Acronvms

AC
ACAC
ACC
ACCY
ACOC
AD
ADAPS
AIDS
ALT
amp
AN

approx
A/O
AR
ARB
ASI
ASSY
ASU
ATA
AWG

ALTERNATING CURRENT
AIR COOLED AIR COOLER
ACTIVE CLEARANCE CONTROL
ACCESSORY
AIR COOLED OIL COOLER
ADMINISTRATION
AUTOMATIC DATA AQUISITION AND PROCESSING
SYSTEM
AIRCRAFT INTEGRATED DATA SYSTEM
ALTITUDE
AMPERE ( S )
ANCILLARY DEPARTMENTS
APPROXIMATELY
ASSEMBLY OF
AS REQUIRED
AIR REGISTRATION BOARD
AIR SPEED INDICATOR
ASSEMBLY
ALTITUDE SENSING UNIT
AIR TRANSPORT ASSOCIATION OF AMERICA
AMERICAN WIRE GAGE

bar
BDC
BRG .
BTU
BVCU

BARS
BOTTOM DEAD CENTER
BEARING
BRITISH THERMAL UNITS
BLEED VALVE CONTROL UNIT

C
CAA

CENTIGRADE
CIVIL AIRWORTHINESS AUTHORITY
CUBIC CENTIMETER (S)
COUNTER CLOCK WISE
CENTRALIZED FAULT DISPLAY INTERFACE
UNIT (A 320)
CHAPTER
CHAPTER/SECTION/SUBJECT
COMMON NACELLE SYSTEM
CENTIMETER

CC

CCW
CFDIU
Chap
Chap/Sect/Sub
CNS
cm

PAGE 23
DATE: DEC 1/87

,-

,--

.'

INTERNATIONAL AERO ENGINES


V 2 5 0 0 P r c ~ a l s ~ oSny s t e m
FACILITIES EQUIPMENT M A N U A L

LJ

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS


Glossary (Continued)
Abbreviations

&

Acronvms

co2
C of G
CRT
CRTD
CSD
CSG
CSN
CSN
CSO
CSR
CW
cu cm
cu ft/min
cu in
cu m
cu m/min
CoMat

CARBON DIOXIDE
CENTER OF GRAVITY
CATHODE RAY TUBE
CATHODE RAY TUBE DISPLAY
CONSTANT SPEED DRIVE
CASING
CATALOG SEQUENCE NUMBER (FIG./ITEM NO.)
CYCLES SINCE NEW
CYCLES SINCE OVERHAUL
CYCLES SINCE REFURBISHMENT
CLOCK WISE
CUBIC CENTIMETER ( s)
CUBIC FEET PER MINUTE
CUBIC INCH (ES)
CUBIC METER(S)
CUBIC METER PER MINUTE
CONSUMABLE MATERIAL (S)

DADC
DB
DC
deg
DEPT
dia
DISASSY.
DITS
DNA
DWG

DIGITAL AIR DATA COMPUTER


DECIBEL
DIRECT CURRENT
DEGREE (TEMP.)
DEPARTMENT
DIAMETER
DISASSEMBLY
DIGITAL INFORMATION TRANSFER SYSTEM
DOES NOT APPLY
DRAWING

EB
EBU
ECM
ED
EEC
EEROM
EEPROM

ELECTRON BEAM
ENGINE BUILD UNIT
ENGINE CONDITION MONITORING
EXECUTIVE DIRECTOR
ELECTRONIC ENGINE CONTROL
ELECTRICALLY ERASABLE READ ONLY MEMORY
ELECTRICALLY ERASABLE PROGRAMABLE READ
ONLY MEMORY
EXHAUST GAS TEMPERATURE
EXIT GUIDE VANE
SPECIAL ENGINE CALIBRATION TEST
ENGINE INTERFACE UNIT (A320)

EGT
EGV
EI-94
EIU

PAGE 24
DATE: DEC 1/88

INTERNATIONAL AERO ENGINES


V2500 Propulsion System
FACILITIES EQUIPMENT MANUAL

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS


Glossary (Continued)
A b b r e v i a t i o n s & AcronVms
R

EM
ENG
EPR
EST.
ESV/YR
EVC
EXIST.

ENGINE MANUAL
ENGINE
ENGINE PRESSURE RATIO
ESTIMATED
ENGINE SHOP V I S I T S PER YEAR
ENGINE VANE CONTROL
EXISTING

F
FAA
FBC
FCOC
FCU
FFR
FFG
Fig
FIR.
FLEX.
FLT

FAHRENHEIT
FEDERAL AVIATION AUTHORITY
FORWARD BEARING CHAMBER
FUEL COOLED O I L COOLER
FUEL CONTROL U N I T
FUEL FLOW REGULATOR
FUEL FLOW GOVERNOR
FIGURE
FULL INDICATOR READING
FLEXIBLE
FLIGHT
FOREMAN
FUEL METERING U N I T
THRUST, POUNDS
FOREIGN O B J E C T DAMAGE
FLUORESCENT PENETRANT I N S P E C T I O N
F I B E R REINFORCED P L A S T I C
FULL SCALE
FEET/FOOT
FEET P E R SECOND
FORWARD

FM
FMU
FN
FOD

FPI
FRP
FS
ft

ft/sec
FWD

gal

GBX
GF

gm
gm i n
gm

GPH
GPM
GSE
GHP
GMAW
GTAW

I M P E R I A L GALLON (S)
GEARBOX
GENERAL FOREMAN
GRAM(S)
GRAM(S) I N C H ( E S )
GRAMMILLIMETER ( S )
I M P E R I A L GALLONS P E R HOUR
I M P E R I A L GALLONS P E R MINUTE
GROUND SUPPORT EQUIPMENT
I M P E R I A L GALLONS P E R HOUR
GAS METALLIC ARC WELDING
GAS TUNGSTEN ARC WELDING
PAGE
DATE:

25
JUN 1 / 9 1

INTERNATIONAL AERO ENGINES


V2500 Propulsion System
FACILITIES EQUIPMENT M A N U A L

GLOSBARY OF' TERM8 / ABBREVIATIONS / ACRONYMS / SYMBOLS

Glossary (Continued)
Abbreviations
H
HE
Hg
HORI Z
hp
HP
HPC
HPT
HRC
HS
HSD
HSG
HSI
HT
HYD.
HZ
H20

ICAO
ID
IDG
IEPR
IGV
in.
inHg
INSP.
Interf
IP
IPC
IPL
ISA
ITEM

kg
kgm

kHz
k"/h

&

Acronvms
HOUR (S)
HIGH ENERGY
MERCURY
HORIZONTAL
HORSE POWER
HIGH PRESSURE
HIGH PRESSURE COMPRESSOR
HIGH PRESSURE TURBINE
ROCKWELL HARDNESS SCALE C
HIGH SPEED (GEARBOX)
HAMILTON STANDARD DIVISION
HOUSING
HOT SECTION INSPECTION
HIGH TENSION
HYDRAULIC
HERTZ, CYCLES PER SECOND
WATER

STANDARD DAY, 59 deg F AT 29.92 inHg MERCURY


INNER DIAMETER
INTEGRATED DRIVE GENERATOR
INTEGRATED ENGINE PRESSURE RATIO
INLET GUIDE VANE(S)
INCH(ES)
INCH (ES) OF MERCURY
INSPECTION
INTERFERENCE
INTERMEDIATE PRESSURE
ILLUSTRATED PARTS CATALOG
ILLUSTRATED PARTS LIST
INTERNATIONAL STANDARD ATMOSPHERE
ILLUSTRATED TOOLS & EQUIPMENT MANUAL

KILOGRAM (S)
KILOGRAMMETER (S)
KILOHERTZ
KILOMETERS PER HOUR

PAGE 26
DATE: DEC 1/87

,-

7/ INTERNATIONAL AERO ENGINES


V2500 P r o p u l s ~ o n System
FACILITIES E Q U I P M E N T M A N U A L

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS


Glossary (Continued)
Abbreviations

61

Acronvms

kOhm
kPa
KVA
kW

KILONEWTON
KILOOHM
KILOPASCAL
KILOVOLT-AMPERE
KILOWATT

1
l/min
lb
lbf
lbfin
lbfft
LD
L/ D
LE
LH
LM
LO
LP
LPH
LPT
LRU
LT
LUBE
LVDT

LITER (S)
LITER(S) PER MINUTE
POUND (S)
POUNDS FORCE
POUNDS FORCE INCH (ES)
POUNDS FORCE FEET
LIGHT DUTY (ELECTRICAL HARNESS)
LENGTH/DIAMETER RATIO
LEADING EDGE
LEFT HAND
LEADMEN
LOGISTICS
LOW PRESSURE
LITERS PER HOUR
LOW PRESSURE TURBINE
LINE REPLACEMENT UNIT
LOW TENSION
LUBRICANT
LINEAR VARIABLE DISPLACEMENT/DIFFERENTIAL
TRANSFORMER

m
MAINT
Max
MB
MB/sec
MCD
METAL.
mg
MH

METER ( S )
MAINTENANCE
MAXIMUM
MEGABYTE
MEGABYTE PER SECOND
MAGNETIC CHIP DETECTOR
METALLURGICAL
MILLIGRAM ( S )
MAN HOUR

kN

PAGE 27
DATE: DEC 1/87

--

.-

7 -/,
f i ,

,/hiig;,

GLOSSARY

r'

INTERNATIONAL AERO ENGINES

V 2 5 0 0 P r ~ p u l s ~ o Sny s t e m
MANUAL

1 - "FACILITIES EQUIPMENT

OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS

Glossary (Continued)

MHz
MIN
pinch
min.
MISC.
MK
pm
m
MN
MO
MOD.
MOhm
MPa
MPA
MPH
MPI
MTBF
MTBR
PV
mV
MV
MVP

MEGAHERTZ
MINIMUM
MICROINCH (ES)
MINUTE (S)
MISCELLANEOUS
MARK (S) OF ENGINE ETC.
MICROMETER(S)
MILLIMETER
MILLIMETER OF MERCURY
MACH NUMBER
MONTH
MODEL
MEGAOHM
MEGAPASCAL(S)
MODULE PERFORMANCE ANALYSIS
MILES PER HOUR
MAGNETIC PARTICLE INSPECTION
MEAN TIME BETWEEN FAILURE
MEAN TIME BETWEEN REMOVALS
MICROVOLT
MILLIVOLT
MEGAVOLT
MOISTURE VAPOR PROOF

N
N/ A
NGV
Nm
NO./No.
N1 RPM
N2 RPM

NEWTON
NOT APPLICABLE
NOZZLE GUIDE VANE(S)
NEWTON METER (S)
NuMBER(S)
LP SYSTEM ROTOR SPEED
HP SYSTEM ROTOR SPEED

OAT
OD
OGV
OH
OP
OPER.

OUTSIDE AIR TEMPERATURE


OUTER DIAMETER
OUTLET GUIDE VANE (S)
OVERHAUL
OVERHAUL PROCESS
OPERATION
OUNCE ( S)
OUNCE FORCE
OUNCE INCH

m g

02

ozf
0 2 in

PAGE 28
DATE: DEC 1/88

INTERNATIONAL AERO ENGINES


V2500 Propulsion System
FACILITIES EQUIPMENT MANUAL

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS

Glossary (Continued)
Abbreviations & Acronvms
PAMB
PART IDENT
PART NO./Part No.
Pa
PB
PBDOT
PCD
PC1
PLA

PMA
pt. /hr
PPH
PPM
P.P.S.
PRESS.
PSF
psi
psia
psid
psig
PS2
PS3
PS3C
PS4
PS4.5
PS5I OR PCP
Pt
PTO
PT2
PT2.5
PT3

PT3C
PT4
PT6
PT7
PVC
PWL
P&W

BAROMETER
PART IDENTIFICATION
PART NUMBER ( S )
PASCAL (S)
BURNER PRESSURE
RATE OF PB-CHANGE
P-CELL FORWARD/REAR
OVERHAUL PROCESSES & CONSUMABLES INDEX
POWER LEVER ANGLE
PERMANENT MAGNETIC ALTERNATOR
IMPERIAL PINTS PER HOUR
POUNDS PER HOUR
POUNDS PER MINUTE
POWER PLANT STATION
PRESSURE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH ABSOLUTE
POUNDS PER SQUARE INCH DIFFERENTIAL
POUNDS PER SQUARE INCH GAGE
LP COMPRESSOR FAN INLET STATIC PRESSURE
LP COMPRESSOR STATIC PRESSURE
VANE CONTROL STATIC PRESSURE
HP COMPRESSOR DISCHARGE STATIC PRESSURE
HP TURBINE COOLING ENTRY PRESSURE
TURBINE COOLING STATIC PRESSURE
IMPERIAL PINT(S)
POWER TAKE OFF
LP COMPRESSOR FAN INLET TOTAL PRESSURE
FAN DISCHARGE TOTAL PRESSURE
LP COMPRESSOR TOTAL PRESSURE
VANE CONTROL TOTAL PRESSURE
HP COMPRESSOR DISCHARGE TOTAL PRESSURE
HP TURBINE DISCHARGE TOTAL PRESSURE
LP TURBINE DISCHARGE TOTAL PRESSURE
POLY VINYL CHLORIDE
SOUND POWER LEVEL
PRATT & WHITNEY

PAGE 29
DATE: DEC 1/87

INTERNATIONAL AERO ENGINES


V2500 Propulsion System
FACILITIES EQUIPMENT M A N U A L

GLOSSARY O F TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS

Glossary (Continued)
Abbreviations

&

Acronvms
QUALITY ASSURANCE
QUICK ATTACH/DETACH (NACELLE)
QUICK ENGINE CHANGE (POWER PLANT
CONFIGURATION)
QUICK ENGINE CHANGE UNIT
IMPERIAL QUART (S)
QUANTITY
IMPERIAL QUART(S) PER HOUR

Ref
REQMT
RH
rpm

SB
SCFM
SCU
SE
Sect
sec
SEN1
SG
SLPM
SLS
SMV
S/N

sov

SP
SPEC.
SPL
SPM
SPOP
sq ft

REFERENCE
REQUIREMENT
RIGHT HAND
REVOLUTIONS PER MINUTE

SERVICE BULLETIN
STANDARD CUBIC FEET PER MINUTE
STARTER CONTROL UNIT
SUPPORT EQUIPMENT
SECTION
SECOND
SUPPORT EQUIPMENT NUMERICAL INDEX
SPECIFIC GRAVITY
STANDARD LITERS PER MINUTE ( S )
SEA LEVEL, STATIC
SCHEDULED MAINTENANCE VISIT
SERIAL NUMBER
SHUT OFF VALVE
STANDARD PRACTICES
SPECIFICATION
SOUND PRESSURE LEVEL
ENGINE STANDARD PRACTICES MANUAL
STANDARD PROCESS OPERATION PROCEDURE
SQUARE FOOT(FEET)

PAGE 30
DATE: J U N 1/91

-/

INTERNATIONAL AERO ENGINES


V2500 Propulsion System
FACILITIES EQUIPMENT MANUAL

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS

Glossary (Continued)
Abbreviations

&

Acronvms

SWG

SQUARE INCH(ES)
SQUARE METER (S)
STANDARD
STAGE
SUBASSEMBLY
SUPPORT
SUBJECT
STATOR VANE
STANDARD WIRE GAGE

T
TAT
TBD
TBO
TC
TCA
TDC
TE
TEC
TEMP.
TGT
TIR
TLA
TLRA
T/M
T.O.
TOBI
T/R
TRA
TS
TSFC
TSI
TSN
TSO
TSR
TT2
TT2.5
TT3.0
TT4.0
TT6.0
TT7.0

TURBINE
TOTAL AIR TEMPERATURE
TO BE DETERMINED
TIME BETWEEN OVERHAUL
THERMOCOUPLE
TURBINE COOLING AIR
TOP DEAD CENTER
TRAILING EDGE
TURBINE EXHAUST CASE
TEMPERATURE
TURBINE GAS TEMPERATURE
TOTAL INDICATOR READING
THROTTLE LEVER ANGLE
THROTTLE LEVER RESOLVER ANGLE
TORQUE MOTOR
TAKE OFF
TANGENTIAL ON BOARD INJECTION
THRUST REVERSER
THROTTLE RESOLVER ANGLE
TECHNICAL SERVICE
THRUST SPECIFIC FUEL CONSUMPTION
TIME SINCE INSTALLATION
TIME SINCE NEW
TIME SINCE OVERHAUL
TIME SINCE REFURBISHMENT
LP COMPRESSOR FAN INLET TOTAL TEMPERATURE
FAN DISCHARGE TOTAL TEMPERATURE
LP COMPRESSOR DISCHARGE TOTAL TEMPERATURE
HP COMPRESSOR DISCHARGE TOTAL TEMPERATURE
HIGH TURBINE DISCHARGE TOTAL TEMPERATURE
LP TURBINE DISCHARGE TOTAL TEMPERATURE

sq in
sq m
STD
STG
SUBASSY
SUPT
Sub

sv

PAGE 31
DATE: DEC 1/87

INTERNATIONAL AERO ENGINES


V2500 Propulsion System
FACILITIES EQUIPMENT MANUAL

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS / SYMBOLS

Glossary (Continued)
Abbreviations

UER
USgal
USGPH
USPPH
USpt

usst

USQPH

VAC
VDC
VERT
VIGV
VOL
VS
VSV
VSVA

&

Acronvms
UNSCHEDULED ENGINE REMOVAL
US GALLON(S)
US GALLON (S) PER HOUR
US PINT(S) PER HOUR
US PINT(S)
US QUART
US QUART PER HOUR

VOLT (S)
VOLTS, ALTERNATING CURRENT
VOLTS, DIRECT CURRENT
VERTICAL
VARIABLE INLET GUIDE VANE(S)
VOLUME
VERSUS
VARIABLE STATOR VANES
VARIABLE STATOR VANE ACTUATOR

WATT
VOLUMETRIC AIR FLOW
VOLUMETRIC FUEL FLOW
WEEK
WATER LINE
WORK REQUIREMENT

YARD
YEAR