Basic Construction Plan

PROJECT NAME
ID

Project Name

Sub-contractor

Days

Start

End

1.0

Substation - Zone 3

70

9-Jul

17-Sep

1.1
1.1.1

Establishment
Collect Building permit
Perfect Builders
Apply for permanent water &
electrical connections
Perfect Builders
Erect stores & welfare facilites on
site
Perfect Builders

8
1

9-Jul
9-Jul

17-Jul
10-Jul

10-Jul

17-Jul

15-Jul

17-Jul

18-Jul
18-Jul
21-Jul
22-Jul
27-Jul
29-Jul
4-Aug
7-Aug
9-Aug
10-Aug
13-Aug

14-Aug
20-Jul
23-Jul
26-Jul
28-Jul
3-Aug
6-Aug
8-Aug
12-Aug
12-Aug
14-Aug

9-Aug
9-Aug
11-Aug
13-Aug
16-Aug
18-Aug
19-Aug
20-Aug
23-Aug
24-Aug
25-Aug
26-Aug
28-Aug
7-Sep
12-Sep
15-Sep

17-Sep
11-Aug
13-Aug
14-Aug
20-Aug
20-Aug
20-Aug
21-Aug
24-Aug
26-Aug
26-Aug
28-Aug
7-Sep
12-Sep
15-Sep
17-Sep

1.1.2
1.1.3

1.2
Earthworks + Substructure
1.2.1
Clear site
1.2.2
Setting out of foundations
1.2.3
Excavate Trenches
1.2.4
Cast Concrete
1.2.5
Build foundation walls
1.2.6
Backfill under floors
1.2.7
Lay Damp proof membrane
1.2.8
Install electrical 1st fix services
1.2.9
Install plumbing 1st fix services
1.2.10
Cast surface bed slab

ABC Earthworks
AN Bricklayers
ABC Earthworks
FH Concrete
AN Bricklayers
ABC Earthworks
FH Concrete
Spark Electrical
Pro Plumbing
FH Concrete

27
2
2
4
1
5
2
1
3
2
1

1.3
Super Structure
1.3.1
Activity
1.3.2
Activity
1.3.3
Activity
1.3.4
Activity
1.3.5
Activity
1.3.6
Activity
1.3.7
Activity
1.3.8
Activity
1.3.9
Activity
1.3.10
Activity
1.3.11
Activity
1.3.12
Activity
1.3.13
Activity
1.3.14
Activity
1.3.15
Activity

AN Other
AN Other
AN Other
AN Other
AN Other
AN Other
AN Other
AN Other
AN Other
AN Other
AN Other
AN Other
AN Other
AN Other
AN Other

39
2
2
1
4
2
1
1
1
2
1
2
10
5
3
2

9-Jul

12-Jul

15-Jul

18-Jul

21-Jul

24-Jul

27-Jul

30-Jul

2-Aug

5-Aug

8-Aug

11-Aug

14-Aug

17-Aug

20-Aug

23-Aug

26-Aug

29-Aug

1-Sep

4-Sep

7-Sep

10-Sep

13-Sep

16-Sep

run date

Page 1 of 1

19-Sep

22-Sep

10/6/2016