D
549.1 mm
B
213.9 mm
T
23.6 mm
t
14.7 mm
A
17,600 mm
Iy
86,170 cm4
Iz
3,868 cm4
Zy =
3,139 cm3
L=
11,300 mm
beff =
1,412.50 mm
fck
35.0 MPa
fcd
23.33 MPa
fy
345 MPa
hc
90 mm
hp
60 mm
z=
Mpl.Rd =
248.5766045549 mm
1726.5495092391 kNm
Med =
1285 kNm
Composite stage
Additional DL =
IL =
W=
l =
e =
P=
=(5^4)/3
84
mm
2 kPa
5 kPa
43.55 kN/m'
P=
24.98
6
18
0.72
14.59
1,707,086,956.40 mm4
=(5^4)/384+
(^3)/(48 )
=
Total deflection
Prechamber 25 mm
26.42 mm +
45.51
2.15 mm
L/360= 31.388889
Supporting masonry
Longitudinal shear
Rq =
_=_/
(2_ )
83.4 kN
2521.3125 kN
31 Nos
2585.4
2.5421829 N/mm
26.5
1.1494
262.23841
4.8077858 N/mm
2.54 N/mm
<
UB 457x191x74.3 kg/m'
D
B
T
t
A
Iy
Iz
Zy =
L=
beff =
fck
fcd
fy
hc
hp
ok
UB 457x191x74.3 kg/m'
Construction stage
Concrete&decking
Self weight of steel
Total Loading =
Tributary
LL=
=(5^4)/3
84
3.75 kPa
0.24 kPa
5.49 kPa
2.55 m
1.5 kPa
16.81 mm
kN
g masonry
prechambering required
UB 457x191x74.3 kg/m'