Professional Documents
Culture Documents
Item description
A.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
2
3
C
1
2
3
Salvage charges
Burnt copper
burnt oil retrived
Unit
Qty.
Nos.
Nos.
Nos.
Nos.
Nos.
Set
3
4
3
4
1
1
Nos.
Kg
L.S.
Nos.
Kg
Pair
LS
4
5
0
20
3
1
LS
24 coils in
kg
84
Limb
3coils in
kg
Limb
Ltr
3
320
L.S.
Ltr
Nos.
L.S
320
1
27coils in
kg
Ltr
66
150
150
Total Amount
1,800.00
1,200.00
1,950.00
3,000.00
600.00
950.00
-
100.00
300.00
300.00
140.00
80.00
1,500.00
400.00
1,500.00
2,800.00
240.00
1,500.00
2,000.00
2,000.00
700.00
58,800.00
2,000.00
6,000.00
700.00
46,200.00
2,500.00
90.00
7,500.00
28,800.00
10,000.00
7.50
150.00
G. Total
or Say
10,000.00
2,400.00
150.00
177,790.00
177,790.00
300.00
45,000.00
10.00
1,500.00
46,500.00
131,290.00
Name of the work : Repair and rewinding of 100KVA,11/0.433KV copper wound transformer at TP Dam of O
Date 30.10.2015
Sl.No.
Item description
Unit
Qty.
Nos.
Nos.
Nos.
Nos.
Nos.
Set
3
4
3
4
1
1
Nos.
Kg
L.S.
Nos.
Kg
Pair
4
5
0
20
3
LS
24 coils in kg
84
Limb
3coils in kg
66
A.
1
2
3
4
5
6
Material:
H.V. Bushing.
L.V. Bushing for 100KVA Trf.
Brass Stud with cap for H.V.Bushing.
Brass Stud with cap for L.V.Bushing.
Breather for 100KVA Transformer.
Gasket for 100KVA Transformer.
7
8
9
10
11
12
13
2
3
Limb
Ltr
3
320
Nos.
B
1
2
Labour charges.
For 100KVA Transformer.
Filteration charges of transformer oil
L.S.
Ltr
L.S
320
Salvage charges
27coils in kg
150
Ltr
150
Burnt copper
Burnt oil retrived
VAT@ 5% On material cost
ST @14% on labour cost
Misclenious
Total
(Rupees One Lakh thirty nine thousand five hundred only)
Total
Total Amount
1,800.00
1,200.00
1,950.00
3,000.00
600.00
950.00
-
100.00
300.00
300.00
140.00
80.00
400.00
1,500.00
2,800.00
240.00
1,500.00
1,500.00
700.00
58,800.00
2,000.00
6,000.00
700.00
46,200.00
2,500.00
90.00
7,500.00
28,800.00
150.00
150.00
10,000.00
7.50
G. Total
10,000.00
2,400.00
175,790.00
300.00
45,000.00
10.00
1,500.00
46,500.00
8,169.50
1,736.00
304.50
139,500.00