You are on page 1of 2

Overall Equipment Effectiveness

Equipment

1
Equipment
failure
Scheduled Operating Time

Operating
time

Valuable
operating
time

scheduled operating time - down time


Availability = ---------------------------------------------------------- x 100
scheduled operating time

2
Setup, adjustments,
planned downtime,
breaks

Downtime
losses

3
Idling and
minor stoppages

4
Reduced
speed
Net
operating
time

Calculation of Overall Equipment Effectivess

Six big losses

Performance
losses

Quality
losses

5
Defects in
process

6
Reduced
yield

(e.g)
480 min - 60 min
Availability = --------------------------------------- x 100 = 87.5%
480 min

theoretical cycle time x total units produced


Performance = ------------------------------------------------------------------- x 100
efficiency
operating time
.
Performance
0.5 min / unit x 400 units
.
efficiency = ---------------------------------------------- x 100 = 47.6%
420 mins.

total units produced - qty of defects


Rate of Quality = --------------------------------------------------------------- x 100
products
total units produced
.
Rate of quality
400 units - 8 units
products = ------------------------------------------ x 100 = 98%
400 units

Overall equipment
effectiveness (OEE)

Performance
.
= Availability x efficiency x Rate of quality products

(e.g.) 0.875 x 0.476 x 0.98 x 100 = 41%

Total Production Ratio


Total Quality Parts x cycle time per part
TPR = --------------------------------------------------------------- x 100
Scheduled Operating Time
.
392 parts x .5 min/unit
.
TPR = ----------------------------------------------------- x 100 = 41%
480 mins

ProgressivEdge.com

Die Cast OEE and TPR


Required for Required for Required for Required for
OEE
OEE
OEE
OEE
Calculated
Required for Required for Required for Required for
TPR
TPR
TPR
TPR
Calculated

Required for
OEE
Calculated
Required for
TPR

Scheduled
Operating
Time
Minutes

Qty of
Defects
Quantity

Down Time
Minutes

Theoretical
Cycle Time
Minutes

Total Units
Produced
Quantity

Operating
Time
Minutes

OEE calculations Sample as seen on


tab "OEE and TPR
formulas

Availability
%

Calculated

Calculated

Performance Quality
%
%

#DIV/0!

#DIV/0!

#DIV/0!

Calculated

OEE
%

TPR
%

#DIV/0!

TPR calculations Sample as seen on


tab "OEE and TPR
formulas

Date

Calculated

#DIV/0!
Scheduled
Operating
Time

Down Time

Theoretical
Cycle Time

Total Units
Produced

Operating
Time

Qty of
Defects
0

Availability Performance Quality


#DIV/0!
#DIV/0!
#DIV/0!

OEE
#DIV/0!

TPR
#DIV/0!

Do not modify blue columns - these have formulas

ProgressivEdge.com