Professional Documents
Culture Documents
Equipment
1
Equipment
failure
Scheduled Operating Time
Operating
time
Valuable
operating
time
2
Setup, adjustments,
planned downtime,
breaks
Downtime
losses
3
Idling and
minor stoppages
4
Reduced
speed
Net
operating
time
Performance
losses
Quality
losses
5
Defects in
process
6
Reduced
yield
(e.g)
480 min - 60 min
Availability = --------------------------------------- x 100 = 87.5%
480 min
Overall equipment
effectiveness (OEE)
Performance
.
= Availability x efficiency x Rate of quality products
ProgressivEdge.com
Required for
OEE
Calculated
Required for
TPR
Scheduled
Operating
Time
Minutes
Qty of
Defects
Quantity
Down Time
Minutes
Theoretical
Cycle Time
Minutes
Total Units
Produced
Quantity
Operating
Time
Minutes
Availability
%
Calculated
Calculated
Performance Quality
%
%
#DIV/0!
#DIV/0!
#DIV/0!
Calculated
OEE
%
TPR
%
#DIV/0!
Date
Calculated
#DIV/0!
Scheduled
Operating
Time
Down Time
Theoretical
Cycle Time
Total Units
Produced
Operating
Time
Qty of
Defects
0
OEE
#DIV/0!
TPR
#DIV/0!
ProgressivEdge.com