Professional Documents
Culture Documents
Skfen
Skfen
Surveyed Qatif P-12 well site successfully, current requirement for the well site is obtained
by keeping the transformer rectifier tap position in CBF1.
SURVEYED BY:
PMT
WITNESSED
BY:
CP
PRO
P.
APPROVED BY:
JOB TITLE
NAME
ID#
CP Engineer
Abhilkumar
81163
96
SIGNATURE
DATE
30.12.20
15