0% found this document useful (0 votes)
264 views1 page

Construction Plan for Villa V5

1. The document contains architectural drawings showing front and rear elevations of Villa V5c, including dimensions and notes. 2. Key details include renderings of the villa's exterior, noting materials like aluminum handrails and double glazing, and indicating multiple levels from the ground floor to upper roof. 3. Floor levels, windows, doors, and other exterior elements are precisely dimensioned, along with surface finishes, plumbing details, and references to other approved plans.

Uploaded by

shonan talpade
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
264 views1 page

Construction Plan for Villa V5

1. The document contains architectural drawings showing front and rear elevations of Villa V5c, including dimensions and notes. 2. Key details include renderings of the villa's exterior, noting materials like aluminum handrails and double glazing, and indicating multiple levels from the ground floor to upper roof. 3. Floor levels, windows, doors, and other exterior elements are precisely dimensioned, along with surface finishes, plumbing details, and references to other approved plans.

Uploaded by

shonan talpade
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

6'

1.
2.
3.

16057
4106

4200

750

1700

PARAPET TOP
+10.375

PARAPET TOP
+10.375

400

UPPER ROOF
S.S.L.+9.975

1300

4000

FRONT ELEVATION VILLA V5

ALUMINUM POWDER COATED HANDRAIL - RAL8019


DOUBLE GLAZING (EXTERNAL GLASS-EMI COOL 6mmTHK
NE 370 T COLOUR BRONZE,GAP IN B/N SLIVER STRIP 16mm THK
INTERNAL GLASS-EMI COOL 6mm thk. ne 370 T COLOUR CLEAR

6.
7.
8.
9.

ALUMINUM POWDER COATED FENCE - RAL 8019


ALUMINUM LOUVER POWDER COATED BOX - RAL 8019
ALUMINUM POWDER COATED PERGOLA-RAL8019
20 mm STAINLESS STEEL GROOVES

S.S.L.+9.975

SPECIAL NOTES:
FOLLOWING DRAWING HAVE BEEN REFERRED
FOR PREPARING THIS SHOP DRAWING:(i) D.M. Approved Architectural Dwg.
(ii) D.M. Approved Structural Dwg.
(iii) Architectural Groping Dwg.
(iv) D.M. Approved MEP Dwg.

-8.000

2250

PARAPET TOP
+7.725

PARAPET TOP
+7.725

400

4.
5.

Scale: 1:50

-8.000

NOTES:

-1.650

S.S.L.+7.325

PARAPET TOP
+7.125

0.00

-2.965

400

SECOND FLOOR
S.S.L+7.325

EXTERNAL FINISHING LEGEND :


RENDERED PAINT FINISH ROUGH TEXTURE- WHITE
SINGLE GLAZING SPANDREL PANEL
GLASS RAILING (HANDRAIL-POWDER COATED
ALUMINUM LEG COLOR-RAL8019,LAMINATED CLEAR GLASS

S.S.L.+6.725

PARAPET TOP
+7.125
SECOND FLOOR
S.S.L+6.725

1.

FL 0.00 CORRESPONDS TO D.M.D LEVELS AS


SHOWN IN THE TABLE FOR EACH GROUP.

2.

FOR DOOR/WINDOWS DETAILS APPROVED


SPECIALIST SHOP DWG. TO BE FOLLOW.
G6-6

3925

XUG4

-4(1)

1)

V5
(

4(2)

G4-

XU

V5(2)

XU

4-2
G

12

V5
M

G5-

4-2

)
(3
4-4

V5M

-2

G4

4-2

3325

1M

G3

V5(3)

-3

2M

G4-

-2

G5
-1

G4

6-6
G

4-2

G3-

P1

-2

2
G4-

??
??

G4-2

G4-2

V5
(6)

G6-12

G4-2

M
V5

V5
(7)

V2

G4-1

G4-1M

G4-2

-2.965

V5
(8
)

M
V5

G4-1

V5(9)

G4-2

V5M

G4-2

EXTERNAL I.P-65
WALL LUMINAIRE
+2.00 FROM.F.F.L

EXTERNAL I.P-65
WALL LUMINAIRE
+2.00 FROM.F.F.L

G4-1M

KEY PLAN
G4-2

G4-2

-1.650

3400

3400

V5(10)

V5M

LINTEL

G4-2

G4-2

S.S.L.+3.325

V5

V5

G4-2

G4-2

S.S.L.+3.325

(5

V5

G4-2

FIRST FLOOR
F.F.L.+3.400

G4-2

G4
-2

G4-2

G4-2

4
FIRST FLOOR
F.F.L.+3.400

Project
Site Office

G3

G4-

G4-

1M

-1
G4

V5(4) V5M

V5
M

G4-2

2
G4-

VILLAS LEVEL

7
1
GROUND FLOOR
F.F.L.0.000
0.00

-0.280
EXT.F.F.L

6'

DRAWING STATUS
1300

4000

1700

4200

PARAPET TOP
+10.375

4106

S.S.L.+9.975

-1.215

B - APPROVED AS NOTED

C - REVISE & RESUBMIT

D - REJECTED

REAR ELEVATION VILLA V5

Scale: 1:50

2250

1
-7.215

-1.500

+2.365

-3.085

-3.150
PARAPET TOP
+7.125
S.S.L.+6.725

+1.340

0.00

400

400

27-10-2016

S.T

P.S.R

R01

REVISED AS PER CONSULTANTS'S COMMENT

03-09-2016

Y.K.

P.S.R

R00

FOR APPROVAL

20-08-2016

Y.K.

P.S.R

Date

Drawn

Chkd.

FRONT LINE INVESTMENT


MANAGEMENT Co. DAMAC

PARAPET TOP
+7.725

REVISED AS PER CONSULTANTS'S COMMENT

CLIENT:

S.S.L.+7.325

R02

Rev.No. Revision/Issues

2 NOS SOLAR WATER HEATER


PANELS (INDICATIVE )

PARAPET TOP
+7.725
SECOND FLOOR
S.S.L+7.325

A - APPROVED

PARAPET TOP
+10.375

400

UPPER ROOF
S.S.L.+9.975

750

PARAPET TOP
+7.125

PROJECT:

AKOYA OXYGEN
AMAZONIA PHASE 3- VP11

SECOND FLOOR
S.S.L+6.725

CONSULTANTS:

5
5

+1.020

+1.020

0.00

0.00

3325

3925

PO BOX 39999 DUBAI, UAE


TEL :+971 42830770
FAX:+971 4280771

4
+2.20

FIRST FLOOR
F.F.L.+3.400

+1.20

MAIN CONTRACTOR:

S.S.L.+3.325

S.S.L.+3.325

+2.365

SIMPLEX INFRASTRUCTURES LTD

FIRST FLOOR
F.F.L.+3.400

Room 312, Pinnacle Building, Sheikh Zayed Road


Between interchange 4&5, Opp. Wellington International School
P.O. BOX-124748, Dubai, United Arab Emirates
TEL: +971-4-3996724 FAX: +971-4-3996785

DRAWING TITLE -

0.00

0.00

3400

3400

+6.285

VILLA V5c
FRONT AND REAR ELEVATION
DRAWN Y.K.

Sheet Size - A1

DRAWING NO.

SIL/P106.16/V5c/AR/SD-200.00
-0.280
EXT.F.F.L

APPROVED -

Date - 20-08-2016
GROUND FLOOR
F.F.L.0.000

CHECKED P.S.R.

Scale - 1:50,1:10
REV.

R-02

You might also like