ESTIMATION TOWARDS INTERIOR

DATE: 17-03-2020
Approved
Sl.No Description units Qty Rate in Rs.
Amount in Rs.

LIVING AREA & DINING AREA

Providing and fixing of Shoe Rack as per the


design given to client. ( Base construction with
1 19mm thick comm gurjan ply, with outside sft 15 1200 18000.00
laminate finish & 0.8 inside laminate finish )
(2'6"x4')+(2'6"x2')

Providing and fixing of T.V unit backpanel as


per the design given to client. ( Base
2 sft 21 500 10500.00
construction with 19mm thick comm gurjan
ply, finishing with Laminate ) (3'x7')

Providing and fixing of T.V base unit as per


the design given to client. ( Base construction
3 with 19mm thick comm gurjan ply, with sft 13 1200 15600.00
outside Laminate finish & 0.8 inside laminate
finish ) (6'6"x2')

Providing and fixing of T.V unit ledges as per


the design given to client. ( Base construction
4 sft 11.5 500 5750.00
with 19mm thick comm gurjan ply, finishing
with Laminate ) (6'+(1'4"x4no's))

TOTAL 49850.00
KITCHEN
Providing and fixing of Base unit construction
with 19mm thick waterproof ply with inside
1 matching 1mm laminate & outside Laminate sft 39 1450 56550.00
finish with softclose hinges / slides.
(13'7"x2'8" )

Providing and fixing of Overhead unit


construction with 19mm thick waterproof ply
2 sft 26 1200 31200.00
with inside matching 1mm laminate & outside
Laminate finish with softclose hinges. (13'x2')

Providing and fixing of Loft as per the design


given by client. ( Base construction with 19mm
3 thick comm ply, Laminte finish with handles / sft 44 850 37400.00
Doors with softclose Ebco & other hardware
Ebco ) (22'x2')

Providing and fixing of Tandum pullouts


4 no's 5 3900 19500.00
with ebco hardware
Providing and fixing of Wicker basket with
5 no's 2 2800 5600.00
ebco clamp channels
6 Providing and fixing of Cutlery tray no's 1 3600 3600.00
7 Providing and fixing of Thali tray no's 1 1900 1900.00
8 Providing and fixing of Cup&Swaser tray no's 1 2600 2600.00
Providing and fixing of Bottle pullout with
9 no's 1 4200 4200.00
ebco soft close channels
TOTAL 162550.00
GUEST BED ROOM
Providing and fixing of Pivot swing wardrobe as
per the design given to client. ( Base construction
1 sft 42 1200 50400.00
with 19mm thick comm ply, laminate finish with
profile handles ) ( 6'x7')

Providing and fixing of Loft as per the design


given by client. ( Base construction with 19mm
2 thick comm ply, Laminte finish with handles / sft 12 850 10200.00
Doors with softclose Ebco & other hardware
Ebco ) (6'x2')

Providing and fixing of Dressing unit as per the


design given by client. ( Base construction with
3 19mm thick comm ply with1mm laminate finish )
sft 14 1200 16800.00
( 2'x 7' )
TOTAL 77400.00
MASTER BEDROOM
Providing and fixing of Sliding wardrobe as per
the design given to client. ( Base construction with
1 sft 49 1200 58800.00
19mm thick comm ply, Laminate finish with
profile handles ) ( 7'x7')

Providing and fixing of Loft as per the design


given by client. ( Base construction with 19mm
2 thick comm ply,Laminate finish with handles / sft 16 850 13600.00
Doors with softclose Ebco & other hardware
Ebco ) (7'x2')

Providing and fixing of Dressing unit as per the


design given by client. ( Base construction with
3 19mm thick comm ply with1mm laminate finish )
sft 14 1200 16800.00
( 2'x 7' )

Providing and fixing of Workstation unit as per


the design given by client. ( Base construction
4 with 19mm thick comm ply with1mm laminate
sft 14 1200 16800.00
finish ) (3'6"x4')

Providing and fixing of Queen size bed as per the


design given by client, includes side tables. ( Base
4 construction with 19mm thick comm ply with1mm
sft 42 800 33600.00
laminate finish & Hydraulic storage ) ( 5'x 7' )

TOTAL 139600.00
KIDS BEDROOM
Providing and fixing of Pivot swing wardrobe
as per the design given to client. ( Base
1 sft 42 1200 50400.00
construction with 19mm thick comm ply,
Laminate finish with profile handles ) ( 6'x7')

Providing and fixing of Loft as per the design


given by client. ( Base construction with 19mm
2 thick comm ply, Laminate finish with handles / sft 16 850 13600.00
Doors with softclose Ebco & other hardware
Ebco ) (8'x2')

Providing and fixing of Dressing unit as per the


design given by client. ( Base construction with
3 19mm thick comm ply with1mm laminate finish )
sft 14 1200 16800.00
( 2'x 7' )
TOTAL 80800.00
OTHERS
Fixing of Electrical Fittings as per the
1 positions of rooms which the client had Ls 5000.00
provided (Labour work)
Providing and fixing of Toilet Accessories as
said that 2 Vanity boxes and utility storage
2 attached with mirror, Towel rod, Twin Ls 18000.00
Hookups, Acrylic Corner Shelf, Soap dish &
Napkin holder.
Providing and fixing of A.O smith Geysers 15
3 no's 2 6800 13600.00
liter capacity 2000- watt
Providing and fixing of Curtain rods with side
4 6500.00
flanges
TOTAL 43100.00

GRAND TOTAL 553300.00