You are on page 1of 5

ELECTRICAL

MANHOUR ESTIMATE

PROJECT NO:

PROJECT NAME
DESCRIPTION

QTY

UNIT

SOFTWARE USAGE
Hrs
Name

LEMH

SEMH

General

loadlist

1
2
3
1
2
3
4
5
6

VARIATION
Deviations from scope of work / specifications, with reasons thereof:
For Cathodic protection only Scope of work and specification for cathodic protection is considered

Exclusions
cathodic protection design excluded

Notes
1
2
3
4
1
0
REV.

9/28/2016
9/27/2016
DATE

Original Estimate
Original Estimate
DESCRIPTION

PRPD.

PAGE

OF

CLIENT
EMH

PRPD.

DMH

REMARKS

CHKD.

APRD.

SCOPE OF WORK

E OF WORK
Electrical items
1
2
3
4
5
6

DEG
LV and HV Switchgear
Transformer
DB
NER
VFD
MOV DB

DS
1
2
3
4
5
6
7
8
9

DEG
LV
HV
Transformer
NER
DB
VFD
HV cable
LV cable

Spec

9 Bulk materila
MR
Above plus bulk materials
10