You are on page 1of 33

Item

Description

Unit

Excavation

m3

Rubble Work

m3

Times

Length

Width

12.000

0.500

12.000
12.000

0.350
0.400

0.750

0.200

12.000

0.500

0.200

0.200

0.134

0.134

12.000

0.350

12.000

0.075

0.200

0.200

0.134

0.134

Ddt Concrete fill

Screede Concrete

m2

Mass concret
Ddt

m3

Plastaring work

m2

add

Suppoting Post

Grede 15 concrete

50 x 50mm, Gauge 8 Wire mesh

m3

m
1

Height

0.450

Qty

Total Qty

2.700
2.700

0.350
0.500

1.470
2.400

0.200

(0.030)
3.840
6.000
6.000

0.100

0.016

0.100

(0.007)
0.009
8.400
1.800
10.200

4
4

0.480

0.750

0.120

0.750

(0.054)
0.066

12.000
12.000

0.2
0.134

0.2
0.134

0.1
0.1

0.016
(0.007)
0.009

NATIONAL WATER SUPPLY AND DRAINAGE BOARD


DRY ZONE URBAN WATER AND SANITATION PROJECT

CONSTRUCTION OF WATER STORAGE STRUCTURES IN MANNAR


CONTRACT NO. : STRU/M/12

VARIATION ORDER No : 33

COMMISSIONING OF MURUNKAN & ELUTHUR PUMPING STATIONS

CONTRACTOR:

SIERRA CONTRUCTION (PVT.) LTD.

PLY AND DRAINAGE BOARD

ER AND SANITATION PROJECT

TORAGE STRUCTURES IN MANNAR

NO. : STRU/M/12

N ORDER No : 33

AN & ELUTHUR PUMPING STATIONS

TRACTOR:

RUCTION (PVT.) LTD.

NATIONAL WATER SUPPLY AND DRAINAGE BOARD

DRY ZONE URBAN WATER AND SANITATION PROJECT


CONSTRUCTION OF WATER STORAGE STRUCTURES IN MANNAR
CONTRACT No: STRU/M/12

SUMMARY
COMMISSIONING OF MURUNKAN & ELUTHUR PUMPING STATIONS

No.

Description
BOQ Page No - 01

VAR

Amount
1,495,654.00

Total

*Note

Contractor :
..
Quantity Surveyor
Date :

1,495,654.00

Rem

Y AND DRAINAGE BOARD

AND SANITATION PROJECT

ORAGE STRUCTURES IN MANNAR


o: STRU/M/12

MARY
VARIATION ORDER No : 33

Remarks

NATIONAL WATER SUPPLY AND DRAINAGE BOARD

DRY ZONE URBAN WATER AND SANITATION PROJECT


CONSTRUCTION OF WATER STORAGE STRUCTURES IN MANNAR
CONTRACT No: STRU/M/12

COMMISSIONING OF MURUNKAN & ELUTHUR PUMPING STATIONS


Item No.

Description

Unit

Pump operator arrangement for commissioning of pump stations at Murungan, Eluthur


and pallimunai sites.

sum

Supply of fuel (Diesel) for Generator at Murungan site for commissioning of pump
station Murungan site

sum

Rate

Quantity

Total Amount

Page 12 of 33

R SUPPLY AND DRAINAGE BOARD

ATER AND SANITATION PROJECT

ER STORAGE STRUCTURES IN MANNAR


RACT No: STRU/M/12

VARIATION ORDER No : 33
Amount

Remarks

1,152,525.00

Reffer annex 01

343,129.00

Reffer annex 01

1,495,654.00

Page 13 of 33

Annex 01

RATE ANALYZIS
1

Pump operator arrangement for commissioning of pump stations at Murungan, Eluth

No.

Description

Unit

Murungan site
( 10-Jun-2016

10-Jul-2016

2.00 Nos per day

day

( 11-Jul-2016

25-Jul-2016

4.00 Nos per day

day

( 26-Jul-2016

24-Aug-2016

2.00 Nos per day

day

( 25-Aug-2016

26-Aug-2016

3.00 Nos per day

day

( 26-Aug-2016

27-Aug-2016

3.00 Nos per day

day

( 27-Aug-2016

22-Oct-2016

2.00 Nos per day

day

( 23-Oct-2016

24-Oct-2016

1.00 Nos per day

day

( 23-Oct-2016

24-Oct-2016

1.00 Nos per day

day

( 24-Oct-2016

15-Nov-2016

2.00 Nos per day

day

( 24-Aug-2016

25-Aug-2016

1.00 Nos per day

day

( 25-Aug-2016

23-Oct-2016

2.00 Nos per day

day

( 24-Oct-2016

25-Oct-2016

1.00 Nos per day

day

( 24-Oct-2016

25-Oct-2016

1.00 Nos per day

day

( 25-Oct-2016

15-Nov-2016

2.00 Nos per day

day

( 25-Aug-2016

21-Oct-2016

2.00 Nos per day

day

( 21-Oct-2016

15-Nov-2016

2.00 Nos per day

day

Eluthur site

Pallimunai

Sum (1)
Allow 27% for overhead & profit

Page 14 of 33

Annex 01
Rate for sum of work
Say rate

Supply of fuel (Diesel) for Generator at Murungan site for commissioning of pump st

No.

Description

Unit

Murungan site
18-May-2016

1.18 ltr

30.00 Ltrs per hour

ltr

2.00 ltr

30.00 Ltrs per hour

ltr

2.25 ltr

30.00 Ltrs per hour

ltr

2.55 ltr

30.00 Ltrs per hour

ltr

2.12 ltr

30.00 Ltrs per hour

ltr

1.52 ltr

30.00 Ltrs per hour

ltr

1.00 ltr

30.00 Ltrs per hour

ltr

6.00 ltr

30.00 Ltrs per hour

ltr

1.10 ltr

30.00 Ltrs per hour

ltr

18-Jun-2016

1.00 ltr

30.00 Ltrs per hour

ltr

19-Jun-2016

3.00 ltr

30.00 Ltrs per hour

ltr

0.60 ltr

30.00 Ltrs per hour

ltr

4.00 ltr

30.00 Ltrs per hour

ltr

0.33 ltr

30.00 Ltrs per hour

ltr

2.05 ltr

30.00 Ltrs per hour

ltr

0.17 ltr

30.00 Ltrs per hour

ltr

8-Jun-2016

10-Jun-2016

17-Jun-2016

21-Jun-2016

28-Jun-2016

Page 15 of 33

Annex 01
3-Jul-2016

4.52 ltr

30.00 Ltrs per hour

ltr

4.00 ltr

30.00 Ltrs per hour

ltr

3.25 ltr

30.00 Ltrs per hour

ltr

1.02 ltr

30.00 Ltrs per hour

ltr

10-Jul-2016

1.25 ltr

30.00 Ltrs per hour

ltr

13-Jul-2016

1.42 ltr

30.00 Ltrs per hour

ltr

14-Jul-2016

5.00 ltr

30.00 Ltrs per hour

ltr

4.00 ltr

30.00 Ltrs per hour

ltr

15-Jul-2016

0.08 ltr

30.00 Ltrs per hour

ltr

24-Jul-2016

0.75 ltr

30.00 Ltrs per hour

ltr

25-Jul-2016

3.25 ltr

30.00 Ltrs per hour

ltr

19-Aug-2016

0.47 ltr

30.00 Ltrs per hour

ltr

28-Aug-2016

0.08 ltr

30.00 Ltrs per hour

ltr

22-Sep-2016

6.00 ltr

30.00 Ltrs per hour

ltr

2.50 ltr

30.00 Ltrs per hour

ltr

4.85 ltr

30.00 Ltrs per hour

ltr

4.00 ltr

30.00 Ltrs per hour

ltr

30-Sep-2016

0.17 ltr

30.00 Ltrs per hour

ltr

8-Oct-2016

8.67 ltr

30.00 Ltrs per hour

ltr

9-Oct-2016

8.67 ltr

30.00 Ltrs per hour

ltr

8-Jul-2016

27-Sep-2016

Sum (1)
Allow 27% for overhead & profit
Rate for sum of work
Say rate

Page 16 of 33

Annex 01

stations at Murungan, Eluthur and pallimunai sites.

Qty

Rate

60.00

Amount

Remarks

56.00

1,500.00

84,000.00

58.00

1,500.00

87,000.00

3.00

1,500.00

4,500.00

3.00

1,500.00

4,500.00

112.00

1,500.00

168,000.00

1.00

1,500.00

1,500.00

1.00

1,500.00

1,500.00

Proposed

44.00

1,500.00

66,000.00

Proposed

1.00

1,500.00

1,500.00

118.00

1,500.00

177,000.00

1.00

1,500.00

1,500.00

1.00

1,500.00

1,500.00

Proposed

42.00

1,500.00

63,000.00

Proposed

114.00

1,500.00

171,000.00

50.00

1,500.00

75,000.00

Reffer attached
attendence sheets

Reffer attached
attendence sheets

Reffer attached
attendence sheets
Proposed

907,500.00
245,025.00

Page 17 of 33

Annex 01
1,152,525.00
1,152,525.00

or commissioning of pump station Murungan site

Qty

Rate

Amount

35.50

95.00

3,372.50

60.00

95.00

5,700.00

67.50

95.00

6,412.50

76.50

95.00

7,267.50

63.50

95.00

6,032.50

45.50

95.00

4,322.50

30.00

95.00

2,850.00

180.00

95.00

17,100.00

33.00

95.00

3,135.00

30.00

95.00

2,850.00

90.00

95.00

8,550.00

18.00

95.00

1,710.00

120.00

95.00

11,400.00

10.00

95.00

950.00

61.50

95.00

5,842.50

5.00

95.00

475.00

Remarks

Page 18 of 33

Annex 01
135.50

95.00

12,872.50

120.00

95.00

11,400.00

97.50

95.00

9,262.50

30.50

95.00

2,897.50

37.50

95.00

3,562.50

42.50

95.00

4,037.50

150.00

95.00

14,250.00

120.00

95.00

11,400.00

2.50

95.00

237.50

22.50

95.00

2,137.50

97.50

95.00

9,262.50

14.00

95.00

1,330.00

2.50

95.00

237.50

180.00

95.00

17,100.00

75.00

95.00

7,125.00

145.50

95.00

13,822.50

120.00

95.00

11,400.00

5.00

95.00

475.00

260.00

95.00

24,700.00

260.00

95.00

24,700.00

270,180.00
72,948.60
343,128.60
343,129.00

Page 19 of 33

MEASUREMENT SHEET
Project
Contract

: DRY ZONE URBAN WATER AND SANITATION PROJECT


: CONSTRUCTION OF WATER STORAGE STRUCTURES IN MANNAR

Contract No

: STRU/M12

Contractor

: Sierra Construction Pvt Ltd

Bill No

Location/Structure

: Contruction of retaining wall and boundry fence at Murunkan site

Measurement No

Work Description

: Measurements for BOQ

Date

BOQ ITEM NO

Description

Unit

Times

Length (m)

Width (m)

Concrete works
3.8

150mm thick Grade 15 screed concrete for foundation

m3

CL length = 249.025 m

249.025

1.100

1st Step CL length = 249.067 m

249.067

1.000

2nd Step CL length = 249.488 m

249.488

0.750

3rd Step CL length = 250.163 m

250.163

0.350

62.483

18.600

69.227

39.500

10.740

200.513

64.033

20.000

Masonry wall
4.1

Random rubble masonry wall in 1:5 cement sand mortar.

m3

Previously approved Qty for CHL Retaining wall

9.1

Supply and erection of peripheral fence around sump,


tower... area with green colour PVC coated wire mesh
(Gauge-8) and RCC intermediate posts as depicted in the
drawing

Ddt of 50mm Thick screed concret of boundry fence


foundation in retaining wall area.

m2

Page 20 of 33

MEASUREMENT SHEET
Project
Contract

: DRY ZONE URBAN WATER AND SANITATION PROJECT


: CONSTRUCTION OF WATER STORAGE STRUCTURES IN MANNAR

Contract No

: STRU/M12

Contractor

: Sierra Construction Pvt Ltd

Bill No

Location/Structure

: Contruction of retaining wall and boundry fence at Murunkan site

Measurement No

Work Description

: Measurements for BOQ

Date

BOQ ITEM NO

Description

Unit

Times
1

Length (m)
250.163

Width (m)
0.350

Page 21 of 33

ASUREMENT SHEET

Measurement No

:
:

Height (m)

0.150

Quantity

Total

41.089
41.09

0.600

149.440

0.450

84.202

0.550

48.156

42.480
324.28

62.483
18.600
69.227
39.500
10.740
200.513
64.033
20.000
485.10

Page 22 of 33

ASUREMENT SHEET

Measurement No

:
:

Height (m)

Quantity

Total

87.557
87.56

Page 23 of 33

MEASUREMENT SHEET
Project
Contract

: DRY ZONE URBAN WATER AND SANITATION PROJECT


: CONSTRUCTION OF WATER STORAGE STRUCTURES IN MANNAR

Contract No

: STRU/M12

Contractor

: Sierra Construction Pvt Ltd

Bill No

: VO - 25

Location/Structure

: Murunkan site

Work Description

: Supply & installation of electrical and instrumentation


cables for five nos. bore hole pumps

BOQ ITEM
NO

Description

Unit

Times

Length (m)

Page 24 of 33

MEASUREMENT SHEET
Project
Contract

: DRY ZONE URBAN WATER AND SANITATION PROJECT


: CONSTRUCTION OF WATER STORAGE STRUCTURES IN MANNAR

Contract No

: STRU/M12

Contractor

: Sierra Construction Pvt Ltd

Bill No

: VO - 25

Location/Structure

: Murunkan site

Work Description

: Supply & installation of electrical and instrumentation


cables for five nos. bore hole pumps

BOQ ITEM
NO

Description

Unit

Times

Length (m)

Page 25 of 33

EASUREMENT SHEET

Measurement No

Date

Width (m)

Height (m)

Quantity

Total

Page 26 of 33

EASUREMENT SHEET

Measurement No

Date

Width (m)

Height (m)

Quantity

Total

Page 27 of 33

ANNEXES

NEXES

QUOTATIONS

TATIONS

MEASUREMENTS

REMENTS

You might also like