You are on page 1of 1

NOTES:

1. All dimensions are in MM, unless otherwise mentioned.


2. All Lap plates welding 50mm.
3. All skew and direct welding shall be done by preparing the connecting
plates end to suitable profile (cut to shape) and then welded.
4. Shell opening will be closed after new bottom plate installation.

1972

1972

1972

1972

16

1972

EXISTING TANK SHELL PLATE

10
100

2400

U/S BOTTOM PLATE (NEW)

2400

U/S NEW BOTTOM PLATE (EXISTING)

1800

80

3000

SUMP
ELEVATION VIEW
2500

2450

4056

50
2800

2450

15500

4050

6000

2450

NEW BOTTOM PLATE

2450

15500

2500

PLATE TO PLATE LAP WELD

2450

5950

ALL DIM ARE IN


MM
INCH
UNLESS NOTED OTHERWISE
CLIENT
LOCATION
UNIT
SERVICE
ITEM NO
FIS JOB NO

A
REV.

: SAUDI ARAMCO
: RIYADH
: Z87
: REFINERY FUEL OIL
: R920 - V8B
: -

09.27.15

ISSUED FOR APPROVAL

DATE

DESCRIPTION

RA

RA

SM

DWN. CHK. APPD.

PROC.
ENGR

MECH.
ENGR

THIS DRAWING AND THE DESIGN IT COVERS ARE THE PROPERTY OF MARCON. THEY ARE MERELY
LOANED AND ON THE BORROWER'S EXPRESS AGREEMENT THAT THEY WILL NOT BE COPIED,
LOANED, EXHIBITED NOR USED EXCEPT IN THE LIMITED WAY AND PRIVATE USE PERMITTED BY
ANY WRITTEN CONSENT GIVEN BY LENDER TO THE BORROWER.

CLIENT :

SAUDI ARAMCO
2850

10

100

2400

OPENING IN SHELL

RIYADH SAUDI ARABIA

CONTRACTOR :

SAMSUNG EPC
BOTTOM PLANE VIEW

JUBAIL SAUDI ARABIA

Majed A. Alrammah General


Contracting Est. (MARCON)
Khobar, Kingdom of Saudi Arabia

TITLE :
REPLACEMENT OF BOTTOM PLATE FOR 920-V8B TANK
GA DRAWING
SCALE :
NTS

DRG. No :
MRT-FRM-304-062-R920-V8B

SHT.1 OF 1

REV :
00

You might also like