You are on page 1of 32

Table of contents

Contents
Student Information
Preface
Course Synopsis
Action Plan
Weekly Activities JJ514
Supervisors Review of Project Proposal (Project 1: JJ514)
Weekly Activities JJ614

MECHANICAL ENGINEERING DEPARTMENT


PROJECT 1 & 2 (JJ514 & JJ614) LOG BOOK
i

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

SESSION

LIST OF STUDENTS:
BIL

NAME

REGISTRATION
NUMBER

CONTACT
NUMBER

S1
S2
S3
S4
S5
S6
S7
S8
S9
S10

PROJECT TITLE
:

..
SUPERVISOR
:

...

Preface

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Students are required to use this log book throughout the duration of the Project 1
(JJ514) & Project 2 (JJ614). This book must be filled in as the project is going on. All
relevant findings and activities must be recorded and then verified by group
supervisors weekly. This book is an important mechanism for supervisor to evaluate
a student's attitude and ability and also to monitor the status of the student's
project throughout the semester. Among the relevant information to be recorded
include:
i.

project title, objectives, scope and work plan

ii.

project progress

iii.

project preparation, problems and suggested solutions

iv.

relevant references from journals, websites, books etc.

v.

equipment used including circuit or schematic diagrams

vi.

suggestions, assignment and discussions results from supervisors

vii.

summary of any relevant work that has been done

A reminder to students
i.

This log book must be presented to your supervisors to be evaluated EVERY


WEEK.

ii.

All activities conducted must be recorded at the activities section in the log
book.

iii.

This log book must be submitted to your supervisors along with your Project
Report/Thesis Draft to be graded by your supervisor at the required date
(Refer to Project Action Plan).

iv.

A student can be given the failure grade if he/she was found not able to
achieve the minimum requirement of this subject (subject to approval or
suggestion by the supervisor).

v.

Students are also required to present their logbook to the examiners during
the final presentation.

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Course Synopsis
JJ514 Project 1
PROJECT 1 prepares students with basic skill knowledge in preparing research
proposal and a well written paperwork. This module emphasize on personal
development in preparing a good presentation.

CLO

Types Of Assessment

Continuous Assessment (CA)


CLO1
CLO1, CLO2
CLO3

Percentage (%)

100%

i. Observation (1)

30

ii.Report (1)

40

iii.

Presentation (1)
Total

30
100

JJ614 Project 2
PROJECT 2 introduces the students to the concept in conducting a design or case
study. The students select a project, list the project needs, the project process
involve, cost estimation, project schedule and applied appropriate methodology in
the project planning. It also involves project implementation, project report and
presentation.

CLO

Types Of Assessment

Continuous Assessment (CA)


CLO1, CLO3 & CLO4

i.

CLO4

ii.

CLO4

iii.

Percentage (%)

100%

Observation (1)

40

Report (1)

40

Presentation (1)

20
4

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Total

100

Action Plan
TAKWIM AKTIVITI MINGGUAN PELAJAR (JJ514 PROJECT 1)

Bil

Minggu

Aktiviti

Catatan

Pendaftaran Kursus Pelajar Senior melalui Sistem Pengurusan Maklumat Politeknik


(SPMP)
M1

Taklimat Projek:
1.
2.
3.
4.
5.
6.
7.
8.

M2

Pembahagian kumpulan
Objektif projek
Skop projek
Prosedur Perlaksanaan & Penilaian
Format Laporan
Serah Takwim kepada pelajar
Menyerahkan borang cadangan projek
Memberi panduan membuat perancangan &
Proposal termasuk Carta Gantt

Perbincangan Cadangan Tajuk Projek (Proposal):

Penyelaras
Projek

Penyelia Projek

1. Menerima borang cadangan projek dari


pelajar
Kemajuan Kerja Projek:

M3

1. Percambahan idea dan konsep (draf awal)


Penetapan Cadangan Tajuk Projek (Proposal):

Penyelia Projek

Bimbingan & Perbincangan:


1. Mengenalpasti masalah projek
2. Kajian kebolehlaksanaan/ kemungkinan
(feasibility study)
Kemajuan Kerja Projek:

M4

1. Lukisan (draf akhir)


Bimbingan & Perbincangan:

Penyelia Projek

1. Mengenalpasti masalah projek (pertemuan


mingguan penyelai pelajar)
Draf pertama laporan:
1. Menerima, menilai dan menambahbaik
Kemajuan Kerja Projek:
5

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Bil

Minggu

Aktiviti

Catatan

1. Pemilihan idea dan konsep akhir.


M5

Penyelia Projek

1. Mengenalpasti masalah dan penyelesaian


projek.
2. Kajian literatur (pengumpulan maklumat)
Kemajuan Kerja Projek:

M6

1. Pengumpulan bahan rujukan.


Bimbingan & Perbincangan:

Penyelia Projek

1. Mengenalpasti masalah dan penyelesaian


projek.
2. Pemilihan / tapisan kajian literatur yang
khusus kepada tajuk projek.
Kemajuan Kerja Projek:

M7

1. Pengumpulan bahan rujukan.


Bimbingan & Perbincangan:

Penyelia Projek

1. Mengenalpasti masalah projek.


2. Metodologi kajian (penyenaraian)
Kemajuan Kerja Projek:

M8

1. Mengenalpasti kaedah yang sesuai.


Bimbingan & Perbincangan:

Penyelia Projek

1. Mengenalpasti masalah projek.


2. Metodologi kajian (tapisan/ pemilihan)
Kemajuan Kerja Projek:

M9

1. Penetapan kaedah yang sesuai.


2. Lakaran rekabentuk projek
Bimbingan & Perbincangan:

Penyelia Projek

1. Mengenalpasti masalah projek.


2. Metodologi kajian (penetapan kaedah yang
sesuai)
Kemajuan Kerja Projek:

10

11

Bimbingan & Perbincangan:

M10

1. Lukisan komponen projek (guna software


yang sesuai)
Bimbingan & Perbincangan:

Penyelia Projek

1. Mengenalpasti penyelesaian masalah projek.


2. Metodologi kajian (penetapan)
Kemajuan Kerja Projek:
1. Lukisan terperinci projek (guna software yang
6

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Bil

Minggu

Aktiviti

Catatan

sesuai)
M11

Bimbingan & Perbincangan:

Penyelia Projek

1. Menerima, menilai dan menambahbaik.


12
Draf pertama laporan akhir (Tahap 75%):
M12

M13

1. Serahan bahagian 1, 2 & 3 Laporan Proje


Bimbingan & Perbincangan:

Penyelia Projek

1. Menerima, menilai dan menambahbaik.


Laporan akhir (Tahap 100%):

14

M14

1. Serahan bahagian 1, 2 & 3 Laporan Projek


Bimbingan & Perbincangan:

Penyelia Projek

1. Kaedah pembentangan
Kemajuan Kerja Projek:

15

M15

1. Serahan slide pembentangan


PEMBENTANGAN PENILAIAN PROJEK

Penyelia Projek

(rujuk jadual pembentangan projek)


M16

17

Penyelia Projek

1. Menerima, menilai dan menambahbaik.


Draf pertama laporan akhir (Tahap 90%):

13

16

1. Serahan bahagian 1, 2 & 3 Laporan Projek


Bimbingan & Perbincangan:

SERAHAN LAPORAN PROJEK


dan
SLIDE PEMBENTANGAN

Penyelia Projek
* Penyelaras
Projek

(hardcopy & softcopy)


18

PEPERIKSAAN AKHIR

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

PROJECT 2 JJ614 CALENDAR


Bil

WEEK

W1

Registration week

W2

Project 2 Briefing

W3

ACTIVITIES

9. Project implementation
10. Project 50% progress presentation
11. Project Test Run
12. Project observation & assessment
13. Report format
14. JJ614 calendar, Gantt Chart and flowchart
15. Presentation
Guidance & Discussion
1. Project implementation
2. Project Report

REMARK

Project
Coordinator

* Project
implementatio
n start
Project
supervisor

W4

Guidance & Discussion


1. Project implementation
2. Project Report

Project
supervisor

W5

Project
supervisor

W6

Guidance & Discussion


3. Project implementation
4. Project Report
Guidance & Discussion
1. Project implementation
2. Project Report

W7

Guidance & Discussion


1. Project implementation
2. Project Report

Project
supervisor

Project 50% progress presentation

Project
supervisor

Project
Coordinator

W8

Guidance & Discussion


1. Project implementation
2. Project Report

Project
supervisor

W9

Project
supervisor

10

W10

Guidance & Discussion


1. Project implementation
2. Project Report
Guidance & Discussion
1. Project implementation
2. Project Report

W11

Project Test run & Data Analysis


Guidance & Discussion
1. Project implementation

Project
supervisor

Project

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)


2. Project Report

supervisor

Project Test run & Data Analysis


Prepare the report draft & presentation
12

W12

Prepare the report draft & presentation

Project
supervisor

13

W13

Final Report & Project Submission

Project
Coordinator
Project
supervisor

14

W14

Carry out the presentation.

Project
Coordinator

15

W15

Carry out the presentation.

Project
Coordinator

16

W16

Carry out the presentation.

Project
Coordinator

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Weekly Activities: PROJECT 1 JJ514


WEEK 1:
Summary of activities (including description, progress, date, location , etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 2:
Summary of activities (including description, progress, date, location , etc.

Problems, Questions, Uncertainties

10

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 3:
Summary of activities (including description, progress, date, location , etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

11

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Supervisors Signature & Official Stamp:

WEEK 4:
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 5:
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties

12

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 6:
Summary of activities (including description, progress, date, location , etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

13

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Supervisors Signature & Official Stamp:

WEEK 7:
Summary of activities (including description, progress, date, location , etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 8:
Summary of activities (including description, progress, date, location , etc.

14

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 9:
Summary of activities (including description, progress, date, location , etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

15

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 10:
Summary of activities (including description, progress, date, location , etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 11:
Summary of activities (including description, progress, date, location , etc.

16

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 12:
Summary of activities (including description, progress, date, location , etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

17

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 13:
Summary of activities (including description, progress, date, location , etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

18

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

WEEK 14:
Summary of activities (including description, progress, date, location , etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 15:
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

19

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

Supervisors Review Of Project Proposal (Project 1: JJ514)

SECTION
Abstract

REVIEW OF PROJECT PROPOSAL BY SUPERVISOR


VERDICT
COMMENTS/SUGGESTIONS

Introduction

Research
Question
Literature
review
Methodology
Objectives

Budget

Clarity of
writing
I have read the project proposal and I am *satisfied / not satisfied with the research work

20

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

and writing. The proposal can be submitted *without / after making amendments.
Additional / alternative verdict (if any):

Supervisors Signature & Official Stamp:

Date:

*This form should be completed by week 13 16. Refer to JJ514 Gantt chart

Weekly Activities: PROJECT 2 JJ614


WEEK 1:
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 2:
Summary of activities (including description, progress, date, location, etc.
21

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 3
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:


22

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 4:
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

23

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

WEEK 5:
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 6:
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

24

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 7:
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

25

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

WEEK 8:
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

Review of Project 50% COMPLETION


REVIEW OF PROJECT
VERDICT

COMMENTS/SUGGESTIONS

Additional / alternative verdict (if any):

26

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Panels Signature & Official Stamp:

Date:

WEEK 9:
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

27

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Supervisors Signature & Official Stamp:

WEEK 10:
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 11:
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties


28

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 12:
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor
29

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Supervisors Signature & Official Stamp:

WEEK 13:
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 14:
Summary of activities (including description, progress, date, location, etc.

30

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

Verification by Supervisor

Supervisors Signature & Official Stamp:

WEEK 15:
Summary of activities (including description, progress, date, location, etc.

Problems, Questions, Uncertainties

Outcomes of Discussion with supervisor

Date(s) of meeting with supervisor:

Task for Next Week:

31

PROJECT 1 & 2 LOGBOOK (JJ514 & JJ614)

Verification by Supervisor

Supervisors Signature & Official Stamp:

32

You might also like