Price List

Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

Item

O079

Allow for mobilisation of labour, plants and


hydraulic hammer piling equipment to site,
moving around and demobilisation from site
Handle, sling and pitch initial and extension
vertical piles not exceeding 12m long
Handle, sling and pitch initial and extension
raked 1:4 piles not exceeding 12m long
Drive vertical pile to the required depth

O080

18,000.00

16/12/2008

no

64.00

16/12/2008

no

80.00

16/12/2008

45.00

16/12/2008

Drive raked 1:4 piles to the required depth

60.00

16/12/2008

O081

Fillet weld vertical extension pile joints

no

97.50

16/12/2008

O082

Cut off piles to the required level and roughen


inner surface of pile
Provide labours, plants, temporary staging,
kentledge, testing equipment and load 500mm
diameter test pile to 1200KN
Subsequent load test

no

120.00

16/12/2008

no

15,000.00

10/12/2008

no

10,000.00

10/12/2008

Item

14,666.67

23/12/2008

no

33.20

23/12/2008

13.93

23/12/2008

no

36.00

23/12/2008

Cut off pile head, strip concrete and exposed


reinforcement to a length of 600mm including
bending and binding exposed reinforced rods to
the reinforcement in the pile cap
Supply and fix 'concrete plug'

no

39.00

23/12/2008

no

70.00

23/12/2008

Provide all equipments, hydraulic jack,


deflection gauge, kentledge and other related
items for initial load testing to a vertical load of
130 ton or 1300KN
Subsequent load test

no

13,333.33

23/12/2008

no

6,933.33

23/12/2008

40,000.00

23/12/2008

40.00

23/12/2008

no

27.67

23/12/2008

no

37.50

23/12/2008

no

14,500.00

23/12/2008

O076

O077

O078

O083

O084
OO05

O085

O086

O087

O088
O089

O090
O091

O092
OO06

O093

O094

O095
O096

O097

CHEW FU KEONG

350mm diameter prestressed spun concrete


pile
Allow for mobilisation of labour, plants and
hydraulic hammer piling equipment to site,
moving around and demobilisation from site
Handle, transport and pitch initial and extension
pile not exceeding 12m long
Drive initial and extension pile to the required
depth
Fillet weld pile joint

300mm diameter prestressed spun concrete


pile
Allow for mobilisation of labour, plants and
jacked -in piling equipment to site, moving
around and demobilisation from site
Handle, transport, pitch and drive initial and
extension pile to the required depth
Fillet weld pile joint

Item

Cut off and remove surplus length and strip off


pile head, bend back reinforcement for
connection
Initial pile test to 1100KN

Page :

of

15

Date of Printing: 21/Jul/11