You are on page 1of 2

Disclosures: Alterations

Nature of Work

Approxima
te
completio
n date

Seller has
permit
documentatio
n (yes or no)

Seller has
other
documentati
on (yes or
no)

New Metal Roof


Kitchen remodel
Guest bathroom remodel
Partial upgrade of master
bathroom
New interior doors and
closet doors
Complete re-pipe to copper
pipes
Replaced all drain and sewer
lines under house and to
edge of property except for
~6 ft. under front patio and
added 2 clean outs
Replaced all electrical wiring
that was not replaced during
kitchen / guest bathroom
remodel and replaced panel
Replaced furnace and added
whole house AC and whole
house HEPA filter
Replaced side door in
garage
Replaced fence around
property
Replaced all windows and
sliding glass door with
double pane.
Walls insulated
Insulation added to attic
Spray foam insulation
installed under floor (in
crawl space)
Some stucco and wood at
foundation level replaced
Replaced and added to
sprinkler system
Installed drip system for

9/1997
8/2012
8/2012
8/2015

Yes
Yes
Yes
No

No

8/2015

No

No

12/2010

Yes

10/2010
and 9/2011

Yes

7/2014

Yes

2/2001

Yes

8/2014

No

10/1997

Yes

7/1996

Yes

8/1992
12/2010
12/2010

No
No
No

Yes
Yes
Yes

8/2014

Not sure

Yes

1990 - 2005

No

No

5/2015

No

No

Yes

bushes on side yard


New hot water heater
Gazebo
New carpet
New family room carpet

1/2013
8/1998
~2002
9/2015

Yes
No
No
No

Yes
Not sure
Yes

You might also like