Ocampo
33 Sunny Square Drive, Malanday, Marikina 1805
T: +63 921 6000 178 E: oeneriocampo@gmail.com
Note:
• Should there be any revisions and changes from the original specs specified on the work
plan, cost differences shall be shouldered by the client
• Gate pass or any expense related to materials and supply deliveries is shouldered by the
contractor
• Should subdivision or any government permit be required, it will be provided by the
client (full assistance from application to release, if needed only)
• Furnitures and appliances are not included in the price indicated. In case you want us to
provide for the said items, additional cost will occur.
Actual Installation
*Masonry
a. Covering of existing window
*Carpentry
a. Cove lighting installation with 4 corner pin lights
b. Wall cladding (Tv rack side) with wood cladding and marble finish panel
c. Built-in cabinet (Tv console)
d. Installation of molding frame on one side wall
e. Foyer cabinet (shoe rack)
*Paintings
a. Walls (eggshell white finish)
b. Ceiling (flat white finish)
c. Baseboard (semi-gloss white)
*Electricals
a. Ceiling lights (cove light, 4 pin lights)
b. Accessory lights for Tv console
Actual Installation
*Carpentry
a. Cove lighting installation with 4 corner pin lights
b. Wooden bar countertop
c. Cabinet counter top
d. Fixed side board countertop
e. Mirror panel
f. Aircon concealer with cabinet
*Paintings
a. Walls (eggshell white finish)
b. Ceiling (flat white finish)
c. Baseboard (semi-gloss white)
*Electricals
a. Ceiling lights (cove light, 4 pin lights)
b. Accessory lights for bar
c. Accessory light for mirror
Actual Installation
*Carpentry
a. Suspended ceiling with 3 pin lights
b. Replacement of kitchen countertop and sink
c. Cabinet countertop extension
d. Additional working table countertop w/ overhead cabinet
e. Overhead cabinet extension
f. Hanging kitchen shelves
g. Pocket door installation
*Paintings
a. Walls (semi-gloss white finish)
b. Ceiling (flat white finish)
c. Baseboard (semi-gloss white)
*Electricals
a. Ceiling lights (3 pin lights)
b. Accessory lights for hanging shelves
*Masonry
a. Wall tiles for backsplash at kitchen countertop
Actual Installation
*Carpentry
a. Storage Cabinet (left/right side)
b. Shoe storage cabinet near balcony door
*Paintings
a. Walls (semi-gloss white finish)
d. Ceiling (flat white finish)
e. Baseboard (semi-gloss white)
Project Timeline
*Whole duration of project is within 60 working days
*In case of additional days needed. Kindly give us an allowance of 5 working days
Respectfully yours,