Project Details July 8, 2022


Client name: Iryne H. Clarianes
Project: Ground Floor Interior Renovation/2nd floor cabinet
Address: 36 Villanueva St. Imus Cavite

Dear Ms. Iryne Clarianes,

Greetings! In connection with our earlier correspondence regarding the Renovation of


your Residence (Ground floor interior/2nd floor cabinets) in Imus Cavite, I would like to present
my cost estimate with specific work details made after thorough and meticulous costing.

Note:
• Should there be any revisions and changes from the original specs specified on the work
plan, cost differences shall be shouldered by the client
• Gate pass or any expense related to materials and supply deliveries is shouldered by the
contractor
• Should subdivision or any government permit be required, it will be provided by the
client (full assistance from application to release, if needed only)
• Furnitures and appliances are not included in the price indicated. In case you want us to
provide for the said items, additional cost will occur.

TERMS OF PAYMENT Total


* Php 232,650.00 30% Down payment 232,650.00
* Php 155,100.00 upon mobilization (50%) 387,750.00
* Php 232,650.00 upon 80% completion 620,400.00
*Php 155,100.00 upon turnover

Grand total Php 775,500


WORK DESCRIPTION AND ESTIMATE

Overall Theme: Modern Scandinavian

Living Area Renovation


Initial Preparation (timeline 1-2 days)
*Demolition of all existing designs

Actual Installation
*Masonry
a. Covering of existing window
*Carpentry
a. Cove lighting installation with 4 corner pin lights
b. Wall cladding (Tv rack side) with wood cladding and marble finish panel
c. Built-in cabinet (Tv console)
d. Installation of molding frame on one side wall
e. Foyer cabinet (shoe rack)
*Paintings
a. Walls (eggshell white finish)
b. Ceiling (flat white finish)
c. Baseboard (semi-gloss white)
*Electricals
a. Ceiling lights (cove light, 4 pin lights)
b. Accessory lights for Tv console

Dining and Pantry Area Renovation


Initial Preparation (timeline 1-2 days)
*Demolition of all existing designs

Actual Installation
*Carpentry
a. Cove lighting installation with 4 corner pin lights
b. Wooden bar countertop
c. Cabinet counter top
d. Fixed side board countertop
e. Mirror panel
f. Aircon concealer with cabinet
*Paintings
a. Walls (eggshell white finish)
b. Ceiling (flat white finish)
c. Baseboard (semi-gloss white)
*Electricals
a. Ceiling lights (cove light, 4 pin lights)
b. Accessory lights for bar
c. Accessory light for mirror

Kitchen Area Renovation


Initial Preparation (timeline 1-2 days)
*Demolition of all existing designs

Actual Installation
*Carpentry
a. Suspended ceiling with 3 pin lights
b. Replacement of kitchen countertop and sink
c. Cabinet countertop extension
d. Additional working table countertop w/ overhead cabinet
e. Overhead cabinet extension
f. Hanging kitchen shelves
g. Pocket door installation
*Paintings
a. Walls (semi-gloss white finish)
b. Ceiling (flat white finish)
c. Baseboard (semi-gloss white)
*Electricals
a. Ceiling lights (3 pin lights)
b. Accessory lights for hanging shelves
*Masonry
a. Wall tiles for backsplash at kitchen countertop

2nd Floor Cabinets


Initial Preparation (timeline 1-2 days)
*Demolition of all existing designs

Actual Installation
*Carpentry
a. Storage Cabinet (left/right side)
b. Shoe storage cabinet near balcony door
*Paintings
a. Walls (semi-gloss white finish)
d. Ceiling (flat white finish)
e. Baseboard (semi-gloss white)
Project Timeline
*Whole duration of project is within 60 working days
*In case of additional days needed. Kindly give us an allowance of 5 working days

Respectfully yours,