Professional Documents
Culture Documents
Beam Rebar Placement PDF
Beam Rebar Placement PDF
Center support(S.T.)
1st stirrup
arrangement beside
of pillars main bar
big beam
The splice for upper part rebar of beam's end and lower part rebar of beam's center
apply tension splice length.
<Main bar arrangement>
0.3L1 OR 0.3L2
0.3L1 OR 0.3L2
middle/
big value
middle/
big value
12db
Ldh
min 15
0.125L1
0.125L1
min 15 or continuance
min 15 or continuance
0.125L1
0.125L2
L1
L2
<Distance of stirrup>
S2
S1
50
50
50
end
0.25L1
center
0.5L1
L1
S4
S3
end
0.25L1
end
0.25L2
center
0.5L2
L2
Apply the above except the case of marking separately on beam chart.
S1-S4 : stirrup distance
2) Types of stirrup
<a> Open type
slab on one-side
over 45cm
over 30cm
However, it is formal to divide it into 4 parts from the end of beam reinforcement
to the other end.
wall girder
pillar
spacer
cover
thickness 40
Y beam
height 40
Y beam
X beam
Tension fixation
bent bar
(Top floor)
penetration
of bent bar
top bar
bent bar
(General floor)
Using the bent bars in beams is Japanese style, while cutoff bar is now in common.
0.3L or 0.3L1
big value
0.3L or 0.3L1
big value
In case of girder
0.3L or 0.3L1
standard hook
fixed length
big value
0.3L or 0.3L1
big value
Note
1) * : apply general bars splice length(A class splice) as standard splice length &
fixed length of rebar(22page 6)) for above size
2) ** : fixed as standard hook form about center part bottom bar's 25%
3) splice length according to splice position of rebar arrangement
- tying on upper part rebar(beam)
tying except upper part rebar(beam)
- tying on lower part rebar(beam)
tying except lower part rebar(beam)
tension fixed
length
Wrong method
Correct method
7) Hunch beam
Bend the bars at the bottom in a hunch former and anchor them onto the pillar.
Bend a half of the bars at the bottom to let the anchorage length penetrate the pillar
and anchor near the hunch point.
One size bigger stirrup should be used at the hunch point.
S.T. one size bigger stirrup
stirrup
processing
(current)
(revised)
9) Symbol of beam
Continuous end of beam
Center of beam
Exterior of beam
Interior of beam
Outside of beam
EXT(exterior) CENT(center)
END(end)
400500(stirrup process size : 320420)
tension splice
(B class splice)
stirrup : arrange 200mm distance-D10
END(end)
CENT(center)
300500(stirrup process size : 220420)
END(end)
CENT(center)
400500(stirrup process size : 320420)
tension splice
tension splice
(B class splice)
Each floor bottom structure plane figure symbol & beam chart symbol
You should check pillar size & rebar Qty per each floor, and also arrange after
checking rebar Qty & drawing of outer pillars front and side.