Ahmed Al Balawi-Sea Water Cooling System For Jubail 2 PDF
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2 PDF
Content
Achievements ( In Jubail )
1 : 15
1:4
240
193
RC Capital Invest.
47
JUBAIL 1
RC Capital Invest.
16
JUBAIL 2
Project Life
(Gate Process)
PHASES
STAGES
AVG-DURATION
RANGE
STG-NAME
PLANNING PHASE
STAGE 1
STAGE 2
STAGE 3
STAGE 4
STAGE 5
STAGE 6
2 W
1-3W
2 W
1-3W
24 W
16 - 48 W
16 W
12 - 24 W
4 W
2 - 12 W
104 W
52 - 208 W
CONCEPT
PLAN COMTT
DESIGN
CONTRACTING
APPROVALS
EXCUTION
BREIF SCOPE
BREIF SCOPE
GATE
GATE
KEEPER
WHY DO WE NEED
THE PROJECT
DISCUSS A/E
2W
GATE
KEEPER
DDG
4W
PLAN
COST +- 25 %
COMMT
BUDGET VERIFICATION
RFP
2W
GATE
KEEPER
30% DESIGN
SCHEMATIC DEWG
ROUGH COST
DESCRIPTION
IMPL - PHASE
PROCESS PHASE
2W
90% DESIGN
12 W
P&B
CHAIRMAN
2W
KEEPER
EVALUATION+RECOMMO
3W
NDATION
2W
PARALELL
BOARD
2W
COM
4W
100 % DESIGN
PROJECT NEED
2W
SCHEDULE
MOF
MILESTONS
TURN OVER
TURN-OVER
&
ACCEPTANCE
DEPTS REVIEW + 2 W
PROCESS CICLE
(STGs (3-6))
DG APPROVAL
2D
NEGT BIDDER
3W
TRANSLATION
PROJECT TITLE
CUSTUDY
IMPL- TOOL
GO
HOLD
CANCEL
GATE
KEEPER
PROJECT SPONSOR
TO BE PREPARED BY
REQUESTER THRU
AFORMAT
FORM - A
PROJECT SPONSOR
TO BE PREPARED BY
REQUESTER THRU
POWER POINT
PRESENTATION
FORM -B
GATE
KEEPER
KEEPER
MOF
PROC
GATE
PROJECT SPONSOR
PROCURMT- DEPT
PROCURMT DEPT
REVISED
REVISED
REVISED
CFR
CFR
CFR
CONST/ENG
CONST/ENG
O&M
CFR Report
STAGE 1
Contract
Initiating
Meeting
(0)
STAGE 2
Planning
Committee
Presentation
(PC)
STAGE 3
Planning
Committee
Approval
(Start of Eng)
(ABC)
Tech
Specs
Initiated
(1)
standard days
Complete
30%
Package
Review
(30)
56
Complete
90%
Package
Review
(90)
98
Tech
Specs
100%
to Proc't
(3)
14
COMMUNITY
JUBAIL 1
TECHNICAL
1-06-092-T26
1-Oct-06 P
26-Nov-06 P
10-Dec-06
7-Jan-07 P
N/A P
10-Jun-07 P
6-Aug-07 P
1-Oct-06 A
26-Nov-06 A
10-Dec-06
7-Jan-07 A
N/A F
10-Jun-07 F
6-Aug-07 F
12-Aug-06 P
12-Aug-06 A
7-Oct-06 P
7-Oct-06 A
21-Oct-06
21-Oct-06
P
A
18-Nov-06 P
18-Nov-06 A
13-Jan-07 P
13-Jan-07 A
21-Apr-07 P
21-Apr-07 F
26-May-07 P
26-May-07 F
1-91-709-C12
Construction of International Residential Area (Phase I)
8-Apr-07 P
8-Apr-07 A
3-Jun-07 P
3-Jun-07 A
17-Jun-07
17-Jun-07
P
A
15-Jul-07 P
15-Jul-07 F
28-Oct-07 P
28-Oct-07 F
27-Jan-08 P
27-Jan-08 F
6-Apr-08 P
6-Apr-08 F
1-91-709-C13
Site Development Works in Community Area (Farouk North Area)
9-May-07 P
9-May-07 A
4-Jul-07 P
4-Jul-07 A
18-Jul-07
18-Jul-07
P
A
15-Aug-07 P
15-Aug-07 F
28-Nov-07 P
28-Nov-07 F
27-Feb-08 P
27-Feb-08 F
7-May-08 P
7-May-08 F
1-91-740-C03
Rehab and Improvement of Shorelines in all existing Community area
9-Aug-07 P
9-Aug-07 A
4-Oct-07 P
4-Oct-07 A
18-Oct-07
18-Oct-07
P
A
15-Nov-07 P
15-Nov-07 F
21-Feb-08 P
21-Feb-08 F
11-May-08 P
11-May-08 F
20-Jul-08 P
20-Jul-08 F
1-59-575-C27
4-Mar-07 P
29-Apr-07 P
13-May-07
10-Jun-07 P
15-Sep-07 P
22-Dec-07 P
17-Feb-08 P
4-Mar-07 A
29-Apr-07 A
13-May-07
10-Jun-07 F
15-Sep-07 F
22-Dec-07 F
17-Feb-08 F
1-99-101-T15
Study and Design of City Center
SITE DEVELOPMENT
IRRIGATION
Canal System
Outfall Structure
Canal System
Canal 3
Pump
Station
Canal 1
Canal 2
Outfall
Off-Take Structure
SUPPLY
STRUCTURE
RETURN
STRUCTURE
ACCESS
BRIDGE
FLOW MEASUREMENT
CHAMBER
SEAWATER TO
USER INDUSTRY
LATERAL PIPELINE
S/R
Outfall
JUBAIL 2
STAGES
AREA
(KM2)
GOVERNMENT
INVESTMENT
(SR BILLION)
PRIVATE
INVESTMENT
(SR BILLION)
COMPLETION
DATE
NO. OF
INDUSTRIES
Lots
PRODUCTION
CAPACITY
(KTPY)
1ST
19
5.0
82
2009
24,000
2ND
20
6.3
80
2011
13,000
3RD
23
4.7
78
2013
12,000
4TH
19
TOTAL
81
16.0
14
49,000
Planning
Stage-
240
Feasibility of Jubail 2
For J 2 many option were studies
Canal for once through found not feasible due
to location and crossing KRT and topography
( + 7 m E-W , + 3 N-S )
Cooling Ponds required large space.
Dry cooling , High cost and not in large scale.
Advanced technology of using Gases such as
Ammonia. Limited to small scale
feasible.
Qb
Fill
Air
Sea Water
Make Up
Q rec
Heat
Exchanger
Qm
Industries fence
Q m = ( 6 10 % ) Q rec
Q m = QIndustries
b + fence
Loss
Cold Process
Fluid
Cooling Towers
Heat rejection device
20 % Convective Heat
Transfer
80 % Evaporative Cooling
, Mass Transfer ( 1.5 %
Loss of water )
Mechanical Draft
, 4 MW
Overall System
12.0 km.
KRT
EXISTING SWC
CANAL 2
Stage 3
Stage 2
Stage 1
Headwork : Cofferdam
Headwork : Demolish
Headwork : Rebuild
SEC
BUILDING
FUTURE
FUTURE
SWITCHGEAR
BUILDING
TRANSFORMER
T-601
115/13.8kV
37.5/50MVA
FUTURE
FUTURE
GUARD
HOUSE
STAFF/CONTROL
BUILDING
PW/FW TANK
FUTURE
S
S
S/R
METERING
CHAMBER
FUTURE
S/R
R
R
METERING
CHAMBER
SAMPLING
BLDG.
TRAVELING
BRIDGE CRANE
50 TON CRANE HOIST
TRAVELING
BRIDGE CRANE
SWC
PUMP
MOTOR
15 TON CRANE HOIST
TRAVELING
BRIDGE CRANE
TRASH RACK
CURTAIN WALL
MOTORIZED
BUTTERFLY VALVE
FLOW STRAIGHTENING
INCLINED BAR SCREEN
H.W.L.
EL +8.60m RCD
L.W.L. (MIN.)
EL +5.75m RCD
Piping
4 m for East West Piping 55 km
connection
Valves 4 m ( 31) /
3m (21 ) / 2m ( 66)
Piping Configuration
PS
M
End of Canal 2
Stage 3
Stage 2
Stage 1
KRT Area
Manifold 3 D
N
M
M
Below
Ground
Manifold
Trenching Detail
3000
4000
3000
4000
3000
4000
3000
4000 900
WARNING
TAPE (TYP)
900
4000
CLASS 1
BACKFILL MATERIAL
2900
7000
7000
7000
7000
2900
CLASS 1
BEDDING MATERIAL
Industry Connection
TYPICAL INDUSTRY
SEA WATER RETURN TANK
RC LIMIT
INDUSTRY
LIMIT
SEA WATER RETURN
FROM INDUSTRY
ANALYZERS
INDUSTRY
SWC SUPPLY/
RETURN PIPELINE
M
FT
2004
Start
Finish
2005
2006
2007
2008
2009
2010
2011
2012
2013
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Engineering
10-Nov-03
30-Jan-08
24-May-03 12-Dec-07
04-Aug-05 A 11-Apr-09
28-Mar-04 A 25-Jul-09
Procurement
Construction
Initial Acceptance
Complete
Demobilization
09-Feb-06 A 21-Feb-11
24-Jan-07 A 10-Jan-12
Stage 4
065-C51 Infrastructure of Jubail 2 - Stage 4 (SWC)
29-Nov-07 A 20-Jul-13
Data Date 30Nov07
Stage 1
Target
Stage 2
Target
Stage 3
Target
Thank you