905)
Design Load Computation
Interior Dimensions of Conduit
No of Cells =
4
Width =
2.1336
m
Height =
1.905
m
Total Length of conduit=
60
m
Unit Length of conduit=
1
m
Top Slab
Unit Weight of Soil =
18
KN / m3
Unit Weight of Concrete =
2400
Kg / m3 =
23.544 KN / m3
Depth of Fill above Top Slab =
2.10
m
Weight of Overlying Soil =
37.8
KN / m
Thickness of Slab =
300
mm
Total Width of Slab (at Top) =
10.0344
m
Total Width of Slab (at bottom) =
10.0344
m
Self Weight of Slab =
7.06
KN / m
Total Dead Load =
44.86
KN / m
Factor for Dead Load =
1.40
Factor for Live Load =
1.70
Side Walls
Thickness of Side Wall =
300
mm
Weight of Top Slab =
70.87
KN
Weight of Soil Over Top Slab =
379.30
KN
Height of Side Wall =
1.91
m
weight of Side wall =
13.46
KN
Total Reaction From Top Slab =
238.54
KN (Axially Compressing the Wall)
Lateral Earth Pressure on Side Wall
Earth Pressure at top of Wall =
37.80
KN / m2
Earth Pressure at Base of Wall =
82.89
KN / m2
Base Slab
Bearing Capacity of Soil =
160
KN / m2
(1.5 Tons per sft)
Self Weight of Box Culvert =
209.03
KN / m
Weight of Overlying Soil =
379.30
KN / m
Water Load =
159.49
KN / m *Assume Culvert Flowing at Full Depth
Bearing Pressure on Base Slab =
74.53
KN / m2
OK
Total Pressure On Base Slab =
74.53
KN / m2
Factored Total Pressure on Base Slab=
109.10
KN / m2
300mm
1.905m
300mm
2.1336m
2.10
As road is to be provided at top of the Embsnkmrnt so Effect of Wheel Loads should also be
considered.
Factor for Live Load
1.70
Impact Factor for Slabs =
33%
Load Reduction Factor due to Fill =
0%
Wheel Load =
50.15
Kips =
223.16 KN
H-20 Truck Loading
Wheel Load
Class A Loading
Wheel Load (CDO - Pub - 214 (page 22))
NLC Loading
Wheel Load (CDO - Pub - 214 (page 20))
16
Kips =
71.20
KN
12.5
Kips =
55.63
KN
22.18
Kips =
98.70
KN
1054556
1181102
mm3
mm3
102.99
KN-m
MFBA = wl2/12+PL/8 =
-102.99
KN-m
23.64
KN-m
-27.46
KN-m
MFCD = wl2/12 =
88.31
KN-m
MFDC = wl2/12 =
-88.31
KN-m
27.46
KN-m
-23.64
KN-m
184.6
67.8
67.8
67.8
-24.3
-24.3
57.4
57.4
57.4
195.0
57.4
CHECK
Reinforcement Computations
General Data
fc' =
fy =
40
600
MPa
MPa
Thickness of Wall =
Thickness of Concrete Slab =
Concrete Cover =
300
300
40
20
mm
mm
mm
Top Slab
(Bottom Steel)
Mu = 184.60 KN-m
b=
1000 mm
d = 300-40-20/2
250
mm
min =
0.002
max = 0.018063
= 0.005762
>min So Use
Ast = 1440.41 mm /m
Provide 20 @ 125 mm C/C
2
(Top Steel)
Mu =
b=
d = 300-40-12/2
67.80
1000
254
KN-m
mm
mm
min =
0.002
max = 0.018063
= 0.00198
min> So Use min
Ast =
600
mm2/m
Provide 12 @ 150 mm C/C
Base Slab
(Bottom Steel)
Mu =
b=
d = 300-40-12/2
57.36
1000
254
KN-m
mm
mm
min =
0.002
max = 0.018063
= 0.001671
min> So Use min
Ast =
600
mm2/m
Provide 12 @ 150 mm C/C
(Top Steel)
Mu = 195.03 KN-m
b=
1000 mm
d = 300-40-20/2
250
mm
min =
0.002
max = 0.018063
= 0.006107
>min So Use
Ast = 1526.737 mm2/m
Provide Spacing =
200
mm
Side Walls
(Inner Steel)
Mu =
b=
d = 300-40-12/2
N/A
1000
254
KN-m
mm
mm
min =
0.002
max = 0.018063
=
0
N/A
min> So Use min
Ast =
600
mm2/m
Provide 12 @ 150 mm C/C
(Outer Steel)
Mu =
b=
d = 300-40-12/2
67.80
1000
254
KN-m
mm
mm
min =
0.002
max = 0.018063
= 0.00198
min> So Use min
Ast =
600
mm2/m
Provide 12 @ 150 mm C/C
Distribution Steel
min =
0.002
Ast =
600
mm2/m
Provide 12 @ 150 mm C/C
(12)
12 @ 150 mm C/C
12 @ 150 mm C/C
(5)