You are on page 1of 186

CLIENT

Om ra n i av...i IJ..O..C

;;.all:.,lJ'

c.::...~

~~
LJI.o.J,.....u o..:..U.oJI J5,W

J.J

KIng Saltnan Center For DisabilIty


$<:Janco e.n.Orrtin9 Poopl. u.ul..L-...J1~

Research
~

PROJECT

New Submittal

o Resubrnittal

Ref. No. :

Architectural

11400

Electrical
Mechanical

->

~CTROLUX

Model: W4400H
Location:

81.03.00 - ~scope

laundry

Code: 81.03.01 ~

* Description: (Manufacture, Model, Type, Size, Colour, etc.)

Catalogue

0 Drawing

0 Sample

Having checked this submittal, we certify that it confirms to the requirements of the Contract
except as otherwise indicated herein (
Material Engineer/Name & Signature : _~C'--...;~~~ __
Received by:
Date
Remarks / Comments:

Status

=-_

Project Manaqer/Narne & Siqnature ,

41-

MEP COMMENTS:
1. Contractor shall comply with the following:

a) Power supply 3 Phase system: 380/400 V, 60 HZ.


b) Power supply 1 Phase system: 220/230 V, 60 HZ.
2. If the electric load of the alternative proposed equipments exceeds the load as
specified

in the contract,

Ridco

shall bear the

responsibility

to fulfill

the

requirements at no extra cost or time implication.


3. The contractor should coordinate the connection of mechanical services with
the approved equipment

models and reflect the changes if required on the

associated shop drawings before execution.


4. We expect proper installation

details of all approved

equipments

before

execution of associated services.


S. The contractor
implication.

is responsible to rectify any deviation at no extra cost or time

Material Sheet Submittal

Project: RADISON BLUE HOTEL


Consultant: OMRANIA & ASSOCIATES
Main Contractor: RIDCO
KIT. Contractor: PRO-KITCHEN

Material:

-:

INDUSTRIAL

WASHING
/_MASCHINE (45kg)
MSS # 144

Brand:

E!4fCTROLUX
Model:
,/

/
W4400H

1. Equipment Location
,

./

LAUNDRY Equipment

2/ Catalogues

8) Electrolux

PROFESSIONAL LAUNDRY

Washer extractor
WL.L.OOH,
Features and benefits
Clarus Control' - programmable microprocessor with 9 fixed
and up to 192 programs to allow tree programming
High extraction for efficient dewatering
Frequency-controlled motor for optimal washing
Supplied with 8 5 signals for liquid detergents
Eight connections for liquid detergents
Large door opening for easy loading and unloading
All critical parts made from stainless steel to provide a high
level of corrosion resistance
Powder painted gatvanised steel side panels
Bearing seals lubricated with oil to ensure a long service Ufe.
Empty container alarm
Electric or direct steam healing
Low noise level tor pleasant working environment
Designed for easy servicing and maintenance

Main options
Front mounted loading hopper
Forward or forward/backward tilting with full reversing
function
Noise/heat insulation
Test tap with level tube
Two drain valves tor recovering water/wash solution
Five-compartment injector for powder detergent
/'
(located at the front or on the right hand side of the
,/
machine)
Y
Third water valve
/
Large water valves
is - Integrated Saving
Connection for intelligent detergent system (OMIS)
Connection to CMIS

Image> $hown ate a 'epresentation

of

!he p<oduct O<lIy and

variahon. may ocCtJr.

w4iooH

Main specifications

W4600H
-

Max. capacity
Drum,

kg/lb
litre
o mm
rpm

volume
diameter

Extraction
G-factor
Heating alternatives

electricity
steam
hot water
60C" (7G01)

Consumption data "Normal


Total time (cold+hot/cold)
Water consumption (cold/hot)
Energy consumption (motor/heating)
Steam consumption (cold/hot)
Steam consumption (cold)

kW

min
litre
kWh
kg
kg

" War", t.mp .... hJte IS"C cold water and OS"C1>01war",
". SI.am at 3()(}.4(X) I<I'a

Certified in accordance with ISO 9001 and ISO 14001 and approved IP 240.

65/135
600
980
800
350
36/54

45/100
400
920
825
350
36
x
x

El

Steam

Steam"

El 36 kW

43/501/80
1.1/4.1

38/41
497/72

48/555/92
1.2/4.7

6.1
12

44/49
555/92
1.2/7
14

1.1/-

I El 54 kW
46/555/92
1.2/4.7

B) Eledrolux

V!.ge~
Electrical conne~

230V 3AG 50 Hz
230V 3AC 50 Hz
240V 3AC 60 Hz
240V 3AC 60 Hz
400-415V3N AC 50 Hz
400-415V3N AC 50 Hz

Steam or
230V 3AC 50 Hz
non-heated 230V 3AC 60 Hz

Water; steam and air connection

kW(A)
kW(A)
kW(A)
kW(A)
kW(A)
kW(A)
kW(A)
kW(A}~

'OO."5V3~
~~lves
Rec.Wae~_
FunctionlngUmitsfor water valve
Capacity at 300 kPa
Drain valve
Draining capacity
Steam valve
Rec.steam pressure
Functioninglimits for steam valve
Compressedair
Air pressure
Air consumption
Five-compartmentdetergent injector

DN
kPa
kPa
IImin
e mrn
Ilmin
DN
kPa
kPa
DN
kPa
I/h
DN

\"

W4600H
38 (100)
56 (160)
38 (100)
56 (160)
38 (63)
56 (100)

-I

-J
I

~6 (63)
-

5.5 (10)

4 (16)
4 (16)
4 (16)

25
200-600
50-1000
110
110
400
20
300-600
50-800
6
500-700
20
20

25
200-600
50-1000
110
110
400
20
300-600
SO-800
6
500-700
20
20

13.8
15.8 1.2

13.3
16.9! 1.4

Floor requirements
Frequencyof the dynamic force
Floor load at max extraction

Hz
kN

Sound levels
Sound level
Sound levet with insulation

dB(A)
dB(A)

75

76

< 70

< 70
-

1-

Heat emission

1-

% of installed power, max

Shipping data

6
.~

net. kg
crated. kg
m.l

Shippingvolume
Olhet 1I<lItage> av.4.ble. ..,. rut.lliabon ..",.,.1

,/

1200
l300
5.33

1--

1380
1500
5.7

B) Eledrolux
Dime'lsionli
A
B
C
C

In mm

Width
Depth
Height std/tilt<IWS
Height, low foot
std/tilHWS

Ea
Eb
F std/tilt"WS
G
H std/tiltIWS
I
std/tilt'IWS
K
L
M

W4ltOOH

WI,600H

1325
1450
1975/2015
1890
870/910
300

1390
1585
1975/2015

210

210
1815/1865

270

780/820

780/820
380/420
435
425
525
660
2225
935
815
325
2200
1120
300

380/420
435
425
525
660
2235
950
830
370

2205

T
U

1140
345

Control panel
Door opening 0 535
Five-compartment detergent injector for powder
detergent front (optional)
3b Five-compartment detergent injector for powder
detergent, right hand side (optional)
I,
Cold water connection
5
Hot water connection
6
Third water connection (optional)
7
Steam connection
8
Drain
9
Electrical connection
10 Compressed air connection
n External Uquid detergent connections, 6 pes 0
10 mm, I pc 0 16 mm and 1 pc 0 20 mm
12 Water connection, liquid detergent injector
(optional) 3/4"

870/910
300

1815/1865
270

N
0
P

I
2
3a

Ea

l,~
X.
,

3.

.
'"

--

3a

'"'"'

67128

67116
K

Right side

Front

Rear side

Tilt forward

Tilt backward

6714

8) Eledrolux
options

Front mounted loading hopper - easy loading from Dsling-bag"system.Manually operated.


Backwardsand forwards tilting - backwards tilting can be used in conjunction with input wheel or other loading
system.
Forward tilting with drum reversal- makesunloading into a trolley easy.
NOise/heatinsulation- reduces airborne noise to less than 70 dB(A).
Testtap with level tube - allows you to take samples from the wash solution.
Water/wash solution recovery system- two drain valves allow you to recover rinse water and re-use it in the wash
Five-compartmentdetergent injector - for powder detergent (5 x 1litre) on right hand side or front
Water inlet via pump - additionalwater inlet for water via pump from recovery system.
Third water valve - electrically-controlled water valve for hard water.
Steamconnection components.
Connection components for 2 water connections.
Connection components for 3 water connections.
Pump inlet connection components. Recovery
IS - Integrated Saving.
Combined steam and electrical heating - allows you to swilch between electricity and steam.
Connection to intelligent detergent system (DMIS)
Large water valves (DN 32 / 1lit." SSP)
Kit for connection to CMIS (Certus Management Information Systems)network. CMIS provides vital statistics,error
codes, maintenanceintervals.process receipt, etc.
Accessory

WPM PC program. Allows the creation of wash programs on a PC and their transferenceto the machine via a
memory card.

./'
<i

I
I:!

CMIS can be fIIted to washer extractors wth Qarus Control. tvml>!e dryers
with Setecta Control and ironers with etectronic controt system.
All yoo need to access and view the statisticat feedback is a normal PC.

]
;;;
(5

'"

(5

1
~
'.if

.2

s'" "'!!'
www.etectrolux.com/professionat
Share more of our thinking at www.etectrotux.com

~ ~
'"
':J
~
z &
~ f
0

3.

Specifications

ITEM N.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BORROW

Type:

METROMAX_Q

Price:
5

Bl.02.13

STORAGE RACK (4 TIERS)

Implementation in accordance with preliminary observations.


See pos. nr. B1.02.09
planned
Width x Depth x Height:
1825 x 530
x 1900

offered
W
D

.......

Manufacture:
Metro
(or equivalent)
Type:
METROMAX_Q
Price:
Bl.03.00

FULL SCOPE LAUNDRY

INDUSTRIAL WASHING MASCHlNE (4Skg)

I~lementation

in accordance witn ErelLmina~

observations.

/
Max. capac~ty 45Kg/ 100 lb Drum, volume: 400 litre;
diameter: 0920 rom; Extraction: 825 rpm;
G-factor: 350; Consumption data "Normal 60C:;.,."_,-,::..:>.;':l..!.;/I
Electric heated Total time: 43/- min;
Water consum tion 501/80litre; Energy

.. .. ~

to..,.............

Price:
2

Bl. 03.02

WASHER EXTRACTOR (65kg)

Implementation in accordance with preliminary observations.


Main specifications: Max. capacity: 65 kg/135 Ib;
Drum, volume: 600 litre; diameter: 0980 mmi
Extraction: 800 rpmi G-factor: 350i Consumption data
"Normal 60C" Total time (cold+hot/cold) 46/- mini
Water consumption (cold/hot): 555/92 litre; Energy
(motor/ heating): 1.2/4.7 kWh

W:\Projekte\20 11\1<12085Radi~on Stu Residence Ri)'adh\08lP61\leistungswrzeichnisIDOC\Kl

VALUE [
2085_1 ender_laundl)' _equipment.dec

PAGE5 from 15

4.

Compliance Statement

/
(

'"
~z
e>=>-

>-

>->-

>- >- >-

>-

>-

o
o
...,.

...,.

s
X
:::J

eu
Q)

ill

:::::>

-II

00
0::0
I-~

~S
-I .'W-l

.. ~r--.

~O

~:i!
CD

.,
d
.,

It:

CCI)

s:o
{!

CONSULTANT

CLIENT

CONTRACTOR

Ornraruaui IJ.O.C

~~..u

iUil.c.,J.I1

iJ

._j1..o.LLl L.!.J.1.DJ1 jE>J.D

Rl)~H DVUOP~IE.~COMPA.W

KIng Salman Center For Disability Research

I-::P:-::R:-::O:-:J=E-=C=T
__ Sd_.n_.,._e.._n_._fItI_n-,:;-e:_:._:~_~:_,._~_.~_'._'C_"'_;'_",..__L.c

~D;;

~ ';

I M I S I - I A I - }2 I 3 I 5 I

o
o

--::tr1

o
o

Mechanical

New Submittal

o Resubmittal

Date:

Electrical

coxn l< TROG.'l.TD.

'f!l8

)KATERIAL SUBMITTAL
Ref. No.:

Civil
Interior Design

Manufacturer

Furniture/Equipment

Specs. No.

Others

Drwg. No.

Supplier

11400

No. of Catalogue/Sample

/'

.>

w.L

ER EXTRACTOR (~

EL~TROLUX

~CHEN

~:'I;'W4600H
Location:

81.03.00 - Full Scope Laundry

Code: 81.03.02

Description: (Manufacture, Model, Type. Size, Colour, etc.)

Catalogue

0 Drawing

0 Sample

Certificate

?i

Having checked this submittal. we certify that it confirms to the requirements of the Contract Documents in all respects,
except as otherwise indicated herein (
Material Engineer/Name & Signature:

~
~

Project Manager/Name & Signature:

_
--7T7~~----

Received by:
Date

Status

Name & Si nature of Consultant

Approved

Revise & Resubmit. Work shall not proceed

Approved as noted

Rejected - Resubmit

Consultant Site Office

Consultant Head Office

MEP

COMMENTS:

1. Contractor shall comply with the following:


a) Power supply 3 Phase system: 380/400 V, 60 HZ.
b) Power supply 1 Phase system: 220/230 V, 60 HZ.
2. If the electric load of the alternative proposed equipments exceeds the load as
. specified

in the contract,

Ridco

shall bear the responsibility

to fulfill

the

requirements at no extra cost or time implication.


3. The contractor should coordinate the connection of mechanical services with
the approved equipment

models and reflect the changes if required on the

associated shop drawings before execution.


4. We expect proper

installation

details of all approved

equipments

before

execution of associated services.


5. The contractor is responsible to rectify any deviation at no extra cost or time
implication.

Material Sheet Submittal

Project: RADISON BLUE HOTEL


Consultant: OMRANIA & ASSOCIATES
Main Contractor: RIDCO
KIT. Contractor: PRO-KITCHEN

Material:

WASHER EXTRACTOR
(65kg)
MSS # 145

Brand:

~ELECTROLUX
Model:

.:

W4600H

~uipment

Location

LAUNDRY Equipment

2. Catalogues

./

8) Eledrolux

PROFESSIONAL LAUNDRY

Washer extractor
WLtLtOOH, WLt600H
Features and benefits
Clarus Control' - programmable microprocessor with 9 fixed
and up to 192 programs to allow free programming
High extraction for efficient dewatering
Frequency-controlled motor for optimal washing
SuppUed with 8 + 5 signals for liquid detergents
Eight connections for liquid detergents
large door opening for easy loading and unloading
All critical parts made from stainless steel to provide a high
level of corrosion resistance
Powder painted galvanised steel side panels
Bearing seals lubricated with oil to ensure a long service life.
Empty container alarm
Electric or direct steam heating
Low noise level for pleasant working environment
Designed for easy servicing and maintenance

Main options
Front mounted loading hopper
Forward or forward/backward tilting with full reversing
function
NOise/heat insulation
Test tap with level tube
Two drain valves for recovering water/wash solution
Five-compartment injector for powder detergent
(located at the front or on the right hand side of the
machine)
Third water valve
Large water valves
IS - Integrated Saving
Connection for intelligent detergent system (DMIS)
Connection to CMIS

Ima9"S shown ite 0 rt!p(e.senl.1iotIof the p<000ct only and


varia~ may occur.

Main specffications
Max. capacity
Drum,

volume
diameter

Extraction
G-factor
Heating alternatives

electricity
steam
hot water
Consumption data "Normal 60C" .. (7G01)
Total time (cotd-hot/cokf)
Water consumption (cold/hot)
Energy consumption (motor/heating)
Steam consumption (cold/hot)
Steam consumption (cold)

kg/lb
litre
o mm
rpm
kW

min
litre
kWh
kg
kg

W4400H

W4600H

45/100
[,00
920
825
350
36
x
x
Steam
El
['3/38/41
[,97/72
501/80
1.1/[,.1
l.l/6.1
12

65/135
600
980
800
350
36/5[,
x

. Water tempetahxe: lSC cold water and 6SC hot water


. Sleam ol3OO-400 kPa.

Certffied in accordance with ISO 9001 and ISO 14001 and approved IP 24D.

Stearn"

El36 kW

t,['/"9

"8/555/92
1.2/".7

El5[' kW
[,6/555/92
1.2/".7

555/92
12/7
14

8) Eledrolux
connecti ns" /'
Healing ~ltage
/'
El.

/'

230V3AC 50 Hz
230V3AC 50 Hz
2.OV
3AC 60 Hz
240V3AC 60 Hz
400-'15V3N AC 5Q Hz
400-415V3N AC 50 Hz
Steamor
230V3AC 50 Hz
on-heated 230V3AC 60 Hz
400-41SV3N A~50 Hz
Wa r, steam an_d air connection
wate~~s
Rec.waterPr
re
Functioninglimitsfor water valve
Capacityat 300 kPa
Drainvalve
Drainingcapacity
Steamvalve
Rec.steampressure
Functioninglimitsfor steamvalve
Compressedair
Air pressure
Air consumpUon
Five-compartmentdetergent injector

W4600H

-""""'I\W4400H

Electrical

kW(A)
kW(A)
kW(A)
kW(A)
kW(A)
kW(A) /
kW(A)
kW(A)/kW
DN
kPa
kPa
lImin
(2) rnrn
\lmin
DN
kPa
kPa
DN
kPa
l/h
DN

38 (100)
56 (160)
38 (100)
56 (160)
38 (63)
56 (100)

1,

/ 36 (63)
-

.(16)
.(16)
4 (16)

5.5 (10)
25
200-600
50-1000

25
200-600
50-1000
110

no

no

110
400
20
300-600
50-800
6
500-700
20
20

.00
20

300-600
50-800

6
500-700
20

20

Floor requirements

Frequencyof the dynamicforce


Floor load at max extraction

Hz
kN

13.8
15.8! 1.2

13.3
16.9! 1.4

Sound tevels

Soundlevel
Sound level with insulation

dB(A)
dB(A)

<

75
70

._-

<

76
70

_-

Heat emission
% of installedpower, max
ShjRping

-_,

gata

--

net, kg
crated, kg

m~

Shippingvolume
Other voltage> available. see Instal!.;tion manu.1.

1200
1300
5.33

--

1380
1500
5.7

B) Eledrolux
Dimensions ln mm

W4.400H

W.4600H

Width
B Depth
C Height std/tilt'IWS
C Height, low foot
0 std/tilt+lWS
Ea
Eb
F std/tilt+lWS

1325
1450
1975/2015
1890
870/910
300
210
1815/1865
270
780/820
380/420
435
425
525
660
2235
950
830
370
2205
1140
345

1390
1585
1975/2015

G
H

I
K

stdjtill"WS
std/tilt+lWS

M
N
0
P
R
S
T
U
V

870/910
300
210
1815/1865
270
780/820
380/420
435
425
525
660
2225
935
815
325
2200
1120
300

1
2
3a

Control panel
Door opening 0 535
Five-compartment detergent injector for powder
detergent, front (optional)
3b Five-compartment detergent injector for powder
detergent, right hand side (optional)
.4 Cold water connection
5
Hot water connection
6
Third water connection (optional)
7
Steam connection
8
Drain
9
Electrical connection
10 Compressed air connection
11 External Uquid detergent connections, 6 pcs 0
10 rnm 1 pc 0 16 rnm and 1 pc 0 20 mm
12 Water connection, Uquid detergent injector
(optional) 3/4"

~_l::.b.._'___ 67118

_--'P1i-.&..._
67128

Front

Right side

Rear side

Tilt backward

6714

8) Electrolux
Options

Front mounted loading hopper - easy loading from "sling-bag"system.Manually operated.


Backwardsand forwards tilting - backwardstilting can be used in conjunction with input wheel or other loading
system.
Forwardtilting with drum reversal- makesunloading into a trolley easy.
Noise/heat insulation- reduces airborne noise to less than 70 dB.(A).
Test tap with level tube - allows you to take samplesfrom the wash solution.
Water/washsolution recovery system- two drain valves allow you to recover rinse water and re-use it in the wash
Five-compartmentdetergent injector - for powder detergent (5 x 1litre) on right hand side or front
Water inlet via pump - additional water inlet for water via pump from recovery system.
Third water valve - electrically-controlled water valve for hard water.
Steam connection components.
Connection components for 2 water connections.
Connection components for 3 water connections.
Pump inlet connection components. Recovery
IS - Integrated Saving.
Combined steam and electrical heating - allows you to switch between electricity and steam.
Connection to Intelligent detergent system (DMIS)
Large water valves (DN 32/ 11/"" BSP)
Kit for connection to CMIS (Certus Management Information Systems)network. CMIS provides vital statistics,error
codes, maintenanceIntervals,process receipt, etc.
Accessory

WPM PC program. Allows the creation of wash programs on a PC and their transferenceto the machine via a
memory card.

~
t:
"5
0

j
g~

CMIS can be fitted to washer extractors with Clarus Control, tumble dryers
w~h Selecta Control and troners w~h electronic control system.
All you need to access and view the statistical feedback is a normal PC.

_g

l
i;

<> '1ij
'" s
<>
L
S
:;: '
8 ~

..
z ~
~
ll;
...,

www.eledrolux.com/professional
Share more of our thinking at www.electrolux.com

...

I:
51

3.

Specifications

ITEM N.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BORROW

Type:

METROMAX_Q

Price:
Bl.02.13

STORAGE RACK (4 TIERS)

Implementation in accordance with preliminary observations,


See pos. nr. B1.02.09
planned
Width x Depth x Height:
1825 x 530
x 1900

offered
W
D
.......
x

H
x

Manufacture:
Metro
(or equivalent)
Type:
METROMAX_Q
Price:
Bl.03.00

FULL SCOPE LAUNDRY

Bl.03.01

INDUSTRIAL WASHING MASCHINE (45kg)

Implementation in accordance with preliminary observations.


Max. capacity 45Kg/ 100 Ib Drum, volume: 400 litre;
diameter: 0920 mm; Extraction: 825 rpm;
G-factor: 350; Consumption data "Normal 60C" (7G01)
Electric heated Total time: 43/- min;
Water consumption 501/801itre; Energy consumption 1.1/4.1 kWh
planned
Width x Depth x Height:
1325 x 1450 x 2015

offered
W
D
.......

H
, .x

Manufacture:
Electrolux
(or equivalent)
Type:
W4400H
Price:
2
Implementationin

WASHER EXTRACTOR (6Sxg)


prelinUnary observations. ~~

tll~~

Main specifications: Max. capacity: 65 Kg/135 In;


Drum, volume: 600 litre; diameter: 0980 mm;
._["::::::::.:::.-:.
Extraction: 800 rpm; G-factor: 350; Consumption data
-__
"Normal 60C" Total time (cold+hot/cold) 46/- min;
__
Water consumption (cold/hot); 555/92 litre' Energy consumptio
(moto'rheating): 1.2/4.7 kWH

I [

VALUE [

W;\ProjekteIZOl Zlk120B5Radisson Slu Residence Riyadh\OBlPb 7Ileistungsve~ichnis\UOC\Xl ZOB5_ Tender_laundl)' _equipment.doc

PAGE 5 from 15

ITEM N.

UNIT PRICE

QUANTITY DESCRIPTION

LUMP SUM PRICE

BORROW

offered
x Depth x Height:
x 1585 x: 2015

.......

. . . . . .. .. . . . . .

Price:
B1.03.03

HANDWASH BASIN KNEE-OPERATED

Implementation in accordance with preliminary observations.


time setting of 15 sec, with basin valance on 3 sides,~~
incl. 1/2" upright tap with mechanical knee
operation, turned down 30 mm on all sides,
incl. drain and overflow valve
planned
Width x Depth x Height:
400
x 385
x 190

offered
W
D
.......
x

I~

Manufacture:
Rieber
(or equivalent)
Type:
HW-40415-K
Price:
B1.03.04

WASH TROUGH

Implementation in accordance with preliminary observations.


General purpose utility sink for wall mounting,
,~
stainless steel, surface satin finished, material
~~
thickness 0.8 mm, front panel with riffle, 80 mm,
tap ledge and 40 mm rear upstand, 1 1/2" plug waste
~
with plastic overflow pipe and removable corner protection
sheet, drainage left, incl. stainless steel screws and dowels.
planned
Width x Depth x Height:
700
x 460
x 280

offered
W
.......

D
x

H
x

Manufacture:
Franke Aquarotter
(or equivalent)
Type:
BS_312
Price:

I I

W;\Projekte\ZOlZ\klZ085 Radisson Blu Residence Riyadh\08lP67Ileistungsvmeichnis\OOC\J(IZ085_lendel_laundlY_equipmeoldoc

VALUE

I
PAGE 6 from 15

4.

Compliance Statement
/

en

of

'"
'"

0::

>-

>-

>-

I
o
o

..,.
<0

~
X
::J

:::>

...JI

(3

00

Q)

0:::0

Ol

W~

f-<O
0""

;::..

...J ..
W...J

.:.:.

IW
W
::I:
(JJ

o
(JJ

<{

c.
~

o
o
(JJ

...J
<{

w
~
~

.. ~

g5\

\~0

aJ\

t; \
a:::
~
w
0:::
W
I
C/)

~~

CONSUL TANT

CLIENT

CONTRACTOR

Ornranraui rjJ).C

;;_gLc..}J I C:..J 1..:l..!.iJ

LJ l.oJ,.....o.J

~I

j.!:i J.O

KIng Salman Center For DlsabDlty n."..,.....",


SQoncoBonofitfn-gP.oplo
___

PROJECT

uul.L-.Jl ~

~d~.q~.~

,~-.;,.
)l~""-;;\.
j

:.::.1"':v;",-:,-,:,~

--;

Radisson Blu Hotet&FurnishedA artments DQ,Ri adh

/'

ATERIAL SUBMITTAL
Ref. No.:

I M I S I - I A I -1 2 I 3 I 6 I

o Architectural
o Structural

o Electrical
o Mechanical

Civil

Furniture/Equipment

Specs. No.

InteriorDesign

Others

Drwg. No.

Manufacturer
LAUN9"

EQUIPMENTS

New Submittal

D Resubmittal

Date:

Supplier

No. of Catalogue/Sample

11400

Code

/'

WASHER EXTRA4G)

3+CD

Model: W555H
Location: 81.03.00 - Full Scope Laundry
Code: 81.03.06

Description:(Manufacture,Model,Type, Size, Colour, etc.)

Catalogue

0 Drawing

0 Sample

Havingchecked this submittal,we certify that it confirmsto the requirementsof


except as otherwise indicated herein (
Material Engineer/Name& Signature: ~c;"____"~..L..;"___....J-_
~

Project Manager/Name& Signature :

Document

---JtIt~~----

Receivedby:
Date
Remarks/ Comments:

Status

Approved

Revise & Resubmit.Work shall not proceed

Approvedas noted

Rejected - Resubmit

.1

ConsultantSite Office
Engineer:

Date

MEP COMMENTS:
1. Contractor shall comply with the following:
a) Power supply 3 Phase system: 380/400 V, 60 HZ.
b) Power supply 1 Phase system: 220/230 V, 60 HZ.
2. If the electric load of the alternative proposed equipments exceeds the load as
specified

in the contract,

Ridco

shall bear the

responsibility

to fulfill

the

requirements at no extra cost or time implication.


3. The contractor should coordinate the connection of mechanical services with
the approved equipment

models and reflect the changes if required on the

associated shop drawings before execution.


4. We expect proper installation

details of all approved

equipments

before

execution of associated services.


5. The contractor
implication.

is responsible to rectify any deviation at no extra cost or time

--------

Material Sheet Submittal

Project: RADISON BLUE HOTEL


Consultant: OMRANIA & ASSOCIATES
Main Contractor: RIDCO
KIT. Contractor: PRO-KITCHEN

Material:

/
WASHER EXTRACTOR
/
(6kg)
MSS # 146

Brand:

ELECTROLUX
./

Model:
/

~555H

l/quipment

Location

LAUNDRY Equipment

2. Catalogues
/

B) Eledrolux

PROFESSIONAL LAUNDRY

Washer extractor
/

W555H

Features and benefits


Compass Pro' microprocessor offers:
- Large display and one control knob for easy program selection
- Language selection
- Quick selection and option buttons for the most frequently used wash
programs and options
- Wash program packages optimized on Economy, Perfomance and Time.
(Available on general programs)
AS - Automatic Savings:
- The machine weighs the linen and adjusts the amount of water and energy
according to the load. This leads to considerable savings in case the machine
is not fully loaded. (Available on general programs)
Extremely low water and energy consumption - see table below
Four compartment detergent box for manual dosing of powder or liquid
detergent
High extraction force for efficient dewatering
Door with gasket and strong hinges built for heavy duty operation
Stainlessand galvanized steel in all vital parts for high degree of rust protection
Power Balance:
- Maximises the extraction force, leading to highest dewatering and savings in
drying
- Minimizes the stress on the machine, leading to trouble-free operation and
increased machine lifetime
- Reduces vibrations, making it possible to install the machine in all locations

I"",ges ShOwn ate re~tion


varlati005 may

of the product

OCCUf.

Main options
Automatic liquid detergent supply (optional I/O board)
Connection to booking- /payment- system or coin meter
Drain pump
Stacking kit to install tumble dryer T5130 on top to save space

Main spe.ciftcations
Max. capacity
Drum,

fitting factor 1:9


volume
diameter

Extraction
G-factor
Heating alternatives, 230/400V
Consumption data "Normal 60C"
Economy"
Total time
Water consumption (cold-hot)
Energy consumption (motor/heating/hot
Residual moisture

W555H

kg/lb
litre

6/13
53
452
1450
530
22/2.8/4.4
x

e mrn
rpm
electricity
non-heated

water)

kW

min
litre
kWh
%

Water tCf'1'l>C"oltl..tOIS'C cold water and 65C hot water.


f'rog<ams With AS.

Certified in accordance with ISO 9001 and ISO 14001and approved IP 24D.

Full load, 6 kg

Half load, 3 kg"

49
38+10
0.2/0.2/0.6
46

46
18+5
0.2/0.1/0.3
[,8

only and

8) Eledrolux

Electrical connections
Heating
alternative

/MaJ~ge
/

Electric heated

22O-230V
220-230Y
240V I240V 1220-230V
240V 3 380-400V
415V3440V 34SOV3 380-400V
415V 3N -

Total
power
kW

Recommended
(use
A

25
4..7

16
25
16
20
20
20

b
1-

2.6
4.8
4.7
4.8
3.6
4.0
4.5
4.8
4.7

33 -

3N -

220-240V 1-

A2

10

4.8

10
16
16
10
10

0.9

10

A1
2

W555H

DN

Water valves
Water pressvre
Capacity al 300 kPa
Drain valve
Draining capacity
Liquid detergent supplies

kPa

Vmin
e mm
lImin

20
200-500
17
50
160

Floor requirements
Frequency of the dynamic force
Floor load at max extraction

Hz

242

kN

1.02 ! 0.3

Sound levels
Front

Sound power level (lEC 6070it-2-L,)


wash
extraction

dB(A)
dB(A)

59
72

Heat emission
% of installed power, max

Shipping dataU
net. kg
crated, m!

Shipping volume

100
0.46

Accessories
Stainless steel fluff collector
Stacking kit with tumble dryer
Steel base

x
X
X

Dimensions in mm

Al Width
A2 Width

595
735
681
832
306
MI
8it
194
48
65

B Depth
C Height
D

E
F
G
H

I
J

120

119

501
974
764

I Operating panel
2 Detergent box
3 Door opening 0 255 mm

Front

B
Side view

78

K
L
tv1
N

Cold water

5
6
7
8

Hot water
Drain valve
Drain pump
Electrical connection
9 Payment system

and side panets in light grey and blue (RAt 260 70 05. 250 60 30)

Other yoUagcs.av~

'"

<ee installationmanual

.. Avetar;1' data Crated w.,;gnV5hipping volume depends on conflgoraUon.

Please ccotect tOgistic:s for exact rneaseres,

gE

..
..
~

,g
'0

Rear

wi
0.

'"
C5
N

!la;
7.i
.9
:;:
.g>

~
N
~ ~
l?:i
www.eleciroLux.com/professionaL

!:i
zo

Sharemore of our thinkingat www.eLectroLux.com

~ ~

Specifications

3.

ITEM N.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BORROW

B1 .03.05

MIXING TAP SINGLE HOLE 3/4"

bf ~

Imp"ementation in accordance with pre"iminary observations.

metal handle,
removable
swi ve I spout,
with adjustable
glan~,
\
jet regulator,
stainless
steel
valve seat,
flat
valves
.~I
M20 x 1.25.
Flow rate
105 1/min (3 bar) Acoustic
group U.\
r

I~
~,

planned
Width x Depth x Height:

offered
W
D

203

.......

x ......

x 400

x 310

Manufacture:

KWC

(or equivalent)
Type:

K.24.42.21.000C86

x ......

~~)

----f

Price:
!

~lementation

WASHER EXTRACTOR (6kg)

in accordance with Erelimina

observations.

Main specifications:
Max. capacity:
6kg1131b; -;:;D-r-u-m"""
rE:......";::.:::::::-rr::::/
volume:
53 litre;
diameter:
0452 mm; Extraction:
1450 rpm; G-factor:
530; Consumption
data
"Normal 60C" (3GOl) Total time:
46 min; Water

.~:::::~L?f(j)
f'[..-::::...._
'~l';:----"

~/~IJ

consumption
(cold/hot)
36/9 litre;
Energy'
.--~~~
~
consumption
(motor/heating):
0,2/0,35kWh;
_ ~
Automatic
Weighing System with Compass Control;
----microprocessor
offers;
Extremely
low water and energY.F~
consumption;
Stainless
and galvanized
steel
in all vital
parts
for high degree of rust protectio
Mop-si e 160SV 34 Mop

I?lanned
Width x Depth x Height:
595
x 680
x 850
(or

Type:
Price:
B1.03.07

WASHEREXTRACTOR(20kg)

Implementation in accordance with preliminary observations.


LAGOONWETCLEANING
Main specifications:
Max. capacity:
20kg/ 451b; Drum,
volume:
180litre;
diameter
0725mm; Extraction
930rpmi
G-factor:
350; Consumption

Q
r:===-~
-

""=.

VALUE
W:\Projekte\201 Z\k 120B5 Radisson Blu Residence Riyadh\OB lP67\leistungMfleichnis\OOC\K

12085_Tender_laundry_equipmentdoc

PAGE 7 from

15

0'" -'}

4.

Compliance Statement
/

.,

...,

of

E
0:

u;

~z
E">: >-

>- >-

>-

>- >- >- >-

>-

>-

>-

>-

::;l
...JI

01{)

a:::

I{)

1-1{)

0::;:
~ ..

wtTI
"0
00

~~
cr:

!:ON

I{)
I{)
I{)

::;:
x
:::l

~.,

Q)

:;

e(3
W

tT

~
.:
~
a:::

.2
iV
u

:I:

I-

'u
.,

Vl

a:::
~

IW

w
en

en
ii:
oct

Il.

:!:
0

0
0

oct

ii:

W
I-

oct

:!:

a.

~
(/)

-.,
.,

en

...I

to::

]!
....

0:

.;
a.

Q)

2ro~

~(/)

Vl

s:u
~

CONSULTANT

CLIENT

CONTRACTOR

Omrantaul 1J1lC

..uiLc.,JJ1 6~lJ

~
0loJ,......u ....:.l.loJ I j.S J.O

King salman C....ter For Disability


ScIence a..nefltlng P.opfe VUl..L....J1
~

R_rch
~

_._ .... e.r.o .

/
/

Ref. No.:

I M I S I - I A I - t2 I 3 I 7 I

New Submittal

o Resubmittal

Date:

D Electrical

Civil

Furniture/Equipment

Specs.No.

o Mechanical

InteriorDesign

Others

Drwg.No.

Manufacturer

Supplier

11400

No. of Catalogue/Sample

UIPMENTS
MOBILE GARMENT ~
Model: G2_KS200
Location: 81.02.00 -~e

Laundry Equipment

Code: 81.02.02 /

Description:(Manufacture,Model,Type, Size, Colour,etc.)

D Drawing

Catalogue

D Sample

Certificate

JJ1_

Havingchecked this submittal,we certify that it confirms to the requirementsof the Contract Documentsin all respects,
except as otherwiseindicated herein (
Material Engineer/Name& Signature:

- <'

Project Manager/Name& Signature:

'
-p-#7~!:.....---

Receivedby:
Date

Name & Si natureof Consultant

-----,ell-!t')-g..~~---------

-~06~~

_____

.,....---~
Status

Approved

Revise & Resubmit,Work shall not proceed

Approved as noted

Rejected- Resubmit

ConsultantSite Office
Engineer:

~g,J{_
N

No Action

ConsultantHead Office
nager:

Name & Signature

Material Sheet Submittal

Project: RADISON BLUE HOTEL


Consultant: OMRANIA & ASSOCIATES
Main Contractor: RIDCO
KIT. Contractor: PRO-KITCHEN

Material:

MOBtLE GARMENT RACK


7

MSS # 147

Brand:

-:

LECTROLUX
Model:

G2 KS200

1. Equip/

Location

LAUNDRY Equipment
MSS

2. Catalogues
,

BJ

~~

./ "1If 1""-

Electrolux

PROFESSIONAL LAUNDRY

Auxiliary Laundry Equipment

TRP 4 "Super"
Transport trolley

TRP2
Transport trolley

W 580 x 0 470 x H 760 mm


Volume 80 I

W 670 x 0 440 x H 700 mm


Volume 80 I

Rolling table RB10P


x 0 720 x H 905 mm

W 2000

Working table, working chair


W 1000 x 0 700 x H 830
W 1500 x 0 700 x H 830
W 2000 x 0 700 x H 830

_"

Ironing table, wall mounted

Hand wash basin TB10/60 & TB12/60

W 1270 x 0 370 mm, adjustable


W 900 x 0 370 mm, adjustable

W 1000 x 0 600 x H 900 mm &


W 1200 x 0 600 x H 900 mm
Volume 351

Ironing table, free standing


W 1500 x 0 400 mm, adjustable

Hand wash basin HTB60


x H 900 mm

W 660 x 0 510
Volume 351

./ '1 1- r--

--rJ.,,'.J;,i

Electrolux

cO

.l!
0

"
~
~~
.,
~

..

..,
cO
0

...
s ~

~
..,'" ~
~ ~
.;
0

-e-

(')

www.electTolux.comllaundrysystems

z
Share more of OUf thinking at www.electrolux.com

,:

..;

..

3.

Specifications
/'

ITEM N.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BORROW

---------------

start K902 basement floor - laundry -----------------

Bl.02.00

MOBILE LAUNDRY EQUIPMENT

Bl.02.01

FOLDI.NG TABLE

(MOBIL)

Implementation in accordance with preliminary observations.


- Constructed out of tubular
steel, grey-lacquered
Mount~d on 4 swivel castors - with bottom drawer
planned
Width x Depth x Height:
2000 x 720
x 800

offered
W
D
.......
x

H
x

Manufacture:
Electrolux
(or equivalent)
Type:
CUSTOM_MADE
Price:
Bl.02.02

~lementation

MOBILE GARMENT RAC~

in accordance with preliminary observations.

Price:
Bl.02.03

LINEN

TROLLEY

Implementation in accordance with preliminary observations.


Design: solid, galvanised and yellow chromated
construction made of tubular steel frame with wire
infill and oval tube chassis. simple handling and
maximum functionality for storage and transport of
all kinds of goods. two intermediate shelves can be
folded to create a closed container.
Chassis: 2 castors, 2 fixed rollers, 0125 ffiffi, rubber, grey,
trackless.
Incl: blackboard, information clipboard, fold-away suspension

VALUE
W:\J'rojekteI2011\k12085 Radisson Btu Residence Riyadhl08 LP67\leislungsyerzeichnis\DOC\K12085_1

ender_laundry _ equipment.doc

I
- PAGEllrom 15

4.

Compliance Statement

rtI

~
tI)

.,
E

a:

Vi

~Z
Q._>-,... ...... >E>o
o

0
0

\y

(J)
:::.:::
N

rtI

C
.,

:::I

e
's

(5

....

.,

tl
Q)

c-

S2

o
~

w
W

J:

en

en
i:t

4:
0..
:E
0
0

en
..J

4:

i:t

~
:E

;;:::

u.,

Z
W
..:2

~
o
W

I/)

_J

III

0
:2

.,

"-

a:

-E
Cii

C Q.)
(])~

Cil
.~
:2(J)

::0
0

Q. E

I-

*
(I)
(I)
Q)

a: iii
e
1i)
0
~u ~

m
I-

Q)

.;

.,Q.

I/)

..:
U

.,

f-

X
=>0
_JO

ON

o::(J)
1-:::':::
UN

':j<.?
W.:_j
oW

Zo
1\ 00
g:2

1lli'J

CONSULTANT

CONTRACTOR

CLIENT

a-w 1J.!l.C

~ ~~
AiiLc.,u I ~bf lJ .,jto,L........t clJ.DJ1 j.5JD

Om ran i

KIngSal.... n ee.rter For D.....bllIty R_earctt


Sdonce

O.nefiling

P'oopl.

\...UoIt..L...-li

ro-J,...c:

PROJECT

Ref. No.:

IMIS I - IA I - I 2 I 3 I 8 I

o Electrical
o Mechanical

D
D

Civil
Interior Design

Manufacturer

Furniture/Equipment

Specs. No.

Others

Drwg. No.

Supplier

F~QUAROTTER

WASH TROUGH

New Submittal

D Resubmittal

Date:

11400

No. of Catalogue/Sample

~.KITCHEN

Model: 8S_3/
Location:

81.03.00 - Full Scope Laundry

Code: 81.03.04

Description: (Manufacture, Model, Type, Size, Colour, etc.)

Catalogue

0 Drawing

0 Sample

Certificate

Having checked this submittal, we certify that it confirms to the requirements of the Contract Docun'Te1~1ftoIIlI1f'm
except as otherwise indicated herein (
Material Engineer/Name & Signature :

!~,.

l ,
Project
--=~i2~-==~.!.~.:._~

M
FJ!lL

Manager/Name & Signature: --f,H

4'-- _

Received by:
Date
Remarks / Comments:

WITH
{){/!toR!J
_______________ R_E~I------------t
roved as noted

Revise & Resubmit, Work shall not proceed

Rejected - Resubmit

Consultant Head Office


nager:

Date

Material Sheet Submittal

Project: RADISON BLUE HOTEL


Consultant: OMRANIA & ASSOCIATES
Main Contractor: RIDCO
KIT. Contractor: PRO-KITCHEN
Material:

~TROUGH
MSS # 148

Brand:

~e

Ag_uarotter

Model:

/BS 312

-Equipment Location

LAUNDRY Equipment

yatalogues

Utility sink: 8S312

Technical data

.:

Type of utility sink: multi purpose sink


Material: stainless steel
Material code: 1.4301 Chrome Nickel steel
V2A
Material thickness: 1.00 mm
Surface finish: satin finished
Bowl finish: satin finished
Gross weight: 7 kg
Net weight: 6.4 kg
Type of mounting: wall mounting
Waste size: ON 40
Waste kit included: yes
Type of waste kit: standpipe strainer
Tap ledge: no
Outlet size: G 1 1/2 B
Grid: no
Overall width: 700 mm
Overall height: 325 mm
Overall depth: 460 mm
Bowl- width: 620 mm
Bowl - depth: 420 mm

1r
~-----700------~

I~
---660-----4

..

4 00

f--

Franke Washroom Systems


ws-info.de@franke.com
www.franke.de

3.

Specifications

ITEM N.

UNIT PRICE

QUANTITY DESCRIPTION

LUMP SUM PRICE

BORROW

planned
Width x Depth x Height:
1390 x 1585 x 2015

offered
W
D

.......

Manufacture:
Electrolux
(or equivalent)
Type:
W4600H
Price:
B1.03.03

HANDWASH BASIN KNEE-OPERATED

Implementation in accordance with preliminary observations.


time setting of 15 sec, with basin valance on 3
incl. 1/2" upright tap with mechanical knee
operation, turned down 30 mm on all sides,
incl. drain and overflow valve
planned
Width x Depth x Height:
400
x 385
x 190

offered
W
D

.......

Manufacture:
Rieber
(or equivalent)
Type:
HW-40415-K
Price:

General purpose utility sink for wall mounting,


stainless steel, surface satin finished, material
thickness 0.8 mm, front panel with riffle, 80
tap ledge and 40 mm rear upstand, 1 1/2" plug waste
with plastic overflow pipe and removable corner protection
sheet, drainage left, incl. stainless steel screws and dowels.
lanned
Width x

1700
Manufacture:
Franke
(or eguivalent)
T~:
BS_312
Price:

I I

VALUE

W:\Plojekte\ZOIZ\!cl Z085 Radisson Btu Residence Riyadh\OBlP6 7\leistungsveaeiclmis\OOCIKI Z085_Tendet_l.undry_ equipment.doc

I
PAGE 6 110m 15

4.

Compliance Statement

-:

>

en
"0

~0
"0
"0

c:
CO

toW
W

J:

en
z
o
en

~
~
:!:

o
en
..J

w
~
:!:

>

CONSULTANT

CLIENT

G0NTRAVT~R--~

Omrantaujljcr;

.:ui1..c..}J I ~

b..!lJ .J~

l..::..!lGJ1

P JD

.....................

~P~R~O~JE~C~T~-------,-y-,.-.I.-~;-.- ..

VU~I

.1UL\DH

f"O-.,L..c.

--II------------~

.~-t.I

r:__

D~:aoPMD'-T
COMP.\SY

I:'~~;"...
V ........

KIngSalman
Cent... ForDisability
R_
ScIenceBenofltlng People

... ..... . ---.-.


FOR

eoxr e

THDG ~TD.

t:....oO"t

tel&Furnished A artments DQ, Ri adh

I M I S I - I A I -Jif I 3 I 9 I

Ref. No.:

o Architectural
o Structural

o Electrical
o Mechanical

Description"

D
D

Civil
Interior Design

Manufacturer

LAUNDRY EQUIPMENTS

New Submittal

D Resubmittal

Date:

Furniture/Equipment

Specs. No.

Others

Drwq, No.

Supplier

11400

No. of Catalogue/Sample

STATION RY PACKING~HINE
P630KST
L

ation: 81.03.00 - Full Scope Laundry

Code: 81.03.17

* Description: (Manufacture, Model, Type, Size, Colour, etc.)

0 Drawing

Catalogue

0 Sample

Certificate

Document

Having checked this submittal, we certify that it confirms to the requirements of the Contract
except as otherwise indicated herein (
Material Engineer/Name & Signature : _~<s:=:~~===-_'~

Project Manager/Name & Signature :

_---./~$_~ -

Received by:
Date

Name & Si nature of Consultant

Remarks / Comments:

Approved
..Approved as noted

Revise & Resubmit, Work shall not proceed

Rejected - Resubmit

Consultant Site Offioe


Engineer:

Date

Consultant Head Office


nager:

MEP

COMMENTS:

1. Contractor shall comply with the following:


a) Power supply 3 Phase system: 380/400 V, 60 HZ.
b) Power supply 1 Phase system: 220/230 V, 60 HZ.
2. If the electric load of the alternative proposed equipments exceeds the load as
specified

in the contract,

Ridco

shall bear the

responsibility

to fulfill

the

requirements at no extra cost or time implication.


3. The contractor should coordinate the connection of mechanical services with
the approved equipment

models and reflect the changes if required on the

associated shop drawings before execution.


4. We expect proper installation

details of all approved

equipments

before

execution of associated services.


5. The contractor is responsible to rectify any deviation at no extra cost or time
implication.

Material Sheet Submittal

Project: RADISON BLUE HOTEL


Consultant: OMRANIA & ASSOCIATES
Main Contractor: RIDCO
KIT. Contractor: PRO-KITCHEN

Material:

Stationary Packing Machine


7

MSS # 149

Brand:

Model:

/nP630KST

1. E~ment

Location

LAUNDRY Equipment

-:

2. Catalogues

TEXTILE

PACKAGING MACHINES FOR


THE TEXTILE INDUSTRY,
DRY CLEANERS AND
LAUNDRIES.

TEXTILE

PERFORMANCE, QUALITY AND RESPONSIBILITY.


Your customers place the highest possible demands on your
products and services as a dry cleaner, laundry or manufacturer of clothing. Accordingly, transport to customers and to the
market in optimised packaging plays an increasingly important
role in the quality cycle. hawopack products ensure that your
clothing and linen are delivered clean and dust-free to the
market or to your customers, and that the quality associated
with your business is safeguarded by the packaging.
In addition to perfect protection against soiling and Visually
appealing packaging, the hawopack product range offers
a flexible, in a way modular, cost effective and quick solution
for your packaging requirements for various application.
We are taking responsibility for our environment - from product
development to application at your site. Our machines for the
textile packaging are therefore designed for environmentally
friendly PE films. Thanks to the impulse welding process the
devices only need energy durin.gthe packaging process.
This helps to minimise operatinq costs and saves th'e envirenment 100.

TEXTILE
hp 630 KW
hp 630 KWP

COMPACT. FLEXIBLE, WALL MOUNTED.


Basis for particularly space-saving packaging machines for
easy wall mounting is the hp 630. Both the manual version
(hp 630 KW) and the hp 630 KW-Pwith pneumatic control
meet the key requirements in dry cleaning and laundry.
> Film length can be precisely tailored to the
packaged garment.
> Especiaffy suitable for PE fifms.
> hp 630 KW-P: Ease of work through
pneumatic control.
> hp 700: A basic unit for extremely wide
artictes is also available on request.

THE FLEXIBLE FLOOR UNIT.


The hp 630 KST is the base model for the various requirements
in dry cleaning and laundries. The packaging machine is optionally supplied with integrated height adjustmenl Thus, the
floor unit can be adapted to local conditions.

/'

> Fifm length can be precisely tailored to the


packaged garment.
> Especiaffy suitable for PE films.
> hp 630 KST-P: Ease of work through
pneumatic controJ.
> hp 700: A basic unit for extremely wide
articles is also available on request .

hp 630 KSTBS
hp 630 KSTPBS

PERFECT PACKAGING. ALL AROUND.


The 8S manual floor welding unit enhances the basic unit with
a comprehensive transport protection mechanism which prevents soiling through articles falling to the ground or through
slippage of the film. The floor welding unit can be adjusted to
the length of the clothing item.
> Maximum flexibility: Height-adjustable floor welding
unit matches the fifm length more precisely to the
packaged qsrmen;
> Especially suitable for PE fifms.
> hp 630 KST-P-BS:Ease of work through
pneumatic control.
> Optional: Floor unit with integrated height adjustment.
> hp 700: A basic unit for extremely wide
articles is also available on request.

TEXTILE
hp 630 KW
hp 630 KWP

RANGE OF USE AND CERTIFICATIONS


Espec,ally suitable
for use in

h 630 KST
hp 630 KSTP

hp 630 KSTBS
hp 630 KSTPBS

cleaners and
laundnes

cleaners and
laundries
noor unit

hp 630 WS

hp 500 TM

hpllSZ
hpllSZ
hpllSZ
hpllSZ

200
300
450
630

lexltle industry

cleaners and
laundnes

textile ,nduslty and


laundries

t-seater

lablelop Untl

Impulse welding tong

230 V. SOI60Hz
115 V. 50160Hz

230 V. 50160 Hz
115 V. 501"'00Hz

cleaners and
laundnes

Type of deVIce

wall unit

floor umt

CESign

GScertlfied

POWERSUPPLYOATA
Mains connection
and frequency

230 V. 50160 Hz
115 V. 50160 Hz

v.

230 50160Hz
115V.501"'00Hz

'-"'_ ...._..

wtt-.:G IIT".prMe oev:c-e}

Power

(o..Mg _

12SOWan

2 x 1250 Wan

500 Wall

180Wan

procesS)

250 Wan
320 Wan (h;>! ISZ630!

MECHANICAL OATA
Dimension In mrn
(Wx DxH)

5SOx 800 x 400

810 x 570 x 2030

810 x 670)t 2230

1600 x 1000 x 1000

550 x 800 x 400

Casing

metal.
powder-coated

metal.
powder-coated

metal.
powder-coated

metal.
powder-coated

metal.
powdercoated

metal.
powder-coated

Welding type

impulse separation
seam. shoulder
shaped'

,mpulse separanon
seam. shoutder
shaped'

,mpulse separaUon
seam. shoulder
shaped' 'straight

Impulse separation
seam. L shaped

Impulse
separauon seam

welding seam

manual
pneumatic

manual
pneumalic

manual

seml-automatic

manual

manual

infinitely adjustable

infinilelyadlustable

Infinitely adjustable

Infinitely adJustable

Infinitely adjustable

infinitely adjustable

2 x 320mm

2x320mm

2x320mm
630mm

630 x 630 rnm

500mm

200mm
300mm
450mm
630mm

impetse

(1Ioc>--.u"",

Control

Welding time
Walding seam lenglh

pneumatrc

(_WOlclinounll)

Height of the
pacl<aging goods

max. 300mm

FIlm width

max. 600 mm

max.6OOmm

max.600mm

max. 600mm

max.500mm

unlimited

Film thickness

min. 2 x 0.01 mm
max. 2 x 0.02 mm

min. 2 x 0.01 mm
max. 2 x 0.02 mm

min. 2 x 0.01 mm
max. 2 x 0.02 mm

min. 2 x 0.01 mm
max. 2 x 0.02 mm

min. 2 x 0.01 mm
max. 2 x 0.02 mm

max. 2 x 0.5 mm

Pneumatic air
consumption'

max. 0.9 Vcycle

max. 0.9 IIcycle

max. 0.9 Vcycie

Pressure'

max. 6 bar

max. 6 bar

max. 6 bar

Weight

40.0 kg
48.5 kg

46.5 kg
55.0 kg

94.5 kg
95.0 kg

103.S kg

20 kg

1.6 kg/S.l
1.7 kg 16.2
1.8 kg 16.3
2.0 kg 19.6

kg
kg
kg
kg

(long onlyI total)

PACKAGINGMATERIAL
Iherrnoplastlc film
(e.g. PP.PVC. PE

PE-coaled paper

Aluminium laminate

, OplloMlly availablewith slIalght welding form


Onlywith pneumaticcontrol
, 113"'0 recommendsthe useof environmentallyfnettdlyand complelely recyclable PEfilms lor texblep:lckaging.
s

-:

hawoGmbH
ObereAu2-4
@2012hawoGmbH.Allrighls

748470brigheim/Germany

~elVll'd. hawo and GreenTek are

T +49 (0) 626'/97700


F +49 (0) 6261/977069

pending or regfstered trademarks


of hawo GmbH In Germany and

inrchawo.com

many other countries.

\wlW.hay.<O.com

3.

Specifications

ITEM N.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BORROW

Bl. 03 .16

FINISHING PRESS

Implementation in accordance witb preliminary observations.


wight netto: 300Kg; High temperature polished
head, dries the fabric and gives it a flat
finish; High pressure, achieves an excellent
finish; Air operated, reduces operator
fatigue; Padded buck, reduces impressions
planned
Width x Depth x Height:
1250 x 920
x 1250

offered
W
D
.......
x

H
x

...
..

:~

Manufacture:
Electrolux
(or equivalent)
Type:
FPAl-WC(F3LA)
Price:
I

Stationary Packing Machine


akordance

,,'
tb preliminary

Stationary PaCKing Machine wall mounted unit


with pulse-dividing packing in polyethylene
film. Incl. packing tape - roll of 500 m
The manual floor welding unit enhances the
basic unit with a comprehensive transport
protection mechanism which prevents soiling
through articles falling to the ground
slippage of the film. The floor weldin
can be adjusted to suit the length of
the clothing item.

-:

Manufacture:
Hawo
(or egl,livalent)
T~:
HP630KS~
Price:
B1.03.18

INDUSTRIAL IRONER

Implementation in accordance witb preliminary observations.


Main specifications: Capacity, max. water evaporation: 59/h;
Cylinder, diameter (electricity): 479mm; length:
3170mm; Ironing speed: 1,5-9m

I I

VALUE

W:\I'lojekte\ZOlllklZ085 Radisson Blu Residence RiyadhlOBlP67\leislungswl7eichnis\OOC\K1ZOS5_Tender_laundry_equipmentdac

I
PAGElZ from 15-

4.

Compliance Statement

.J

..

.,'"E

0::

IW
W

:::c
CIJ

z
o
CIJ

0::

e,
:i1!

o
o
CIJ

0::
w
~
:i1!

~.... Q)
E
2 .....
ro!I!J

I~ (/)1

CONSULTANT

CLIENT

Om ra n ial)._j 1j.Q.C

ii.Cilc.,u1 ~~lJ

ajlDLu ~I

---....~.~
.....

j..!5.JD

KIng Sal.... n Center For O... bllltyR_rch


Sd.nce
Ben.fltJng Pecopl.
\,JoU1...l-J1
~
~

PROJECT

,/

/
Ref. No. :

o Electrical
o Mechanical

o
o

Civil

Fumiture/Equipment

Specs. No.

Interior Design

Others

Drwg. No.

Manufacturer

EXT~

(4 TIERS)

New Submittal

o Resubmittal

Date:

Supplier

11400

No. of Catalogue/Sample

~ER

0201317 + 0601849 + 0203126

~del:

Location:

81.02.00 - Mobile Laundry Equipment

Code: 81.02.10

Description: (Manufacture, Model, Type, Size, Colour, etc.)

0 Drawing

Catalogue

0 Sample

Certificate

Document

Having checked this submittal, we certify that it confirms to the requirements of the Contract Documents in all respects,
except as otherwise indicated herein (

~<t\~A~~'.J..ts
__

Material Engineer/Name & Signature : ____!!...

L__

Project Manager/Name & Signature:

----J{fio:..r-......----

Received by:
Date

Status
Approved as noted

Name & Si nature of Consultant

Revise & Resubmit, Work shall not proceed

Rejected - Resubmit

Consultant Site Office

Consultant Head Office

Engineer:

Date

Name & Signature

Material Sheet Submittal

Project: RADISON BLUE HOTEL


Consultant: OMRANIA & ASSOCIATES
Main Contractor: RIDCO
KIT. Contractor: PRO-KITCHEN

Material:
-~

RACKEXTENSION
: (4 TIERS)
MSS # 150

Brand:

~PFER
Model:
/~

a201317+0601849+0203126

1. Ezr6ent
...

Location

LAUNDRY Equipment

2. Catalogues
/'

HUPFEI(r.1 ~
Specsheet
Upright 200/50 N20/12 600 kg Aluminium

Article-code:

0201317

Whenthe load is uniformly distributed, the individualshelf load amounts to:


Slatted shelves:
Solid shelves:

600 - 1000 mm wide: 200 kg

1200 mm wide: 160 kg 1400 -1500 mm wide: 100 kg

600 - 1000 mm wide: 150 kg 1200 - 1500 mm wide: 100 kg

Bottle shelves:
Box storageshelf:

800 - 1000 mm wide: 100 kg


1000 mm wide: 100 kg

Dependingon the uprights used, the section load amounts to 600 kg or max. 1200 kg. Extensionunits are 25
mm smaller than the basic shelving unit.
Pitch: 150 mm

All InformaUon / dimensions are aeproxtmate, technical changes reserved. <Sl HUPFER
HUPFER Metallwerke GmbH &. Co. KG
Oleselstrall<! 20 . 0'48653 CoesteJd. Postfach 1463 0-48634 Coesteld . 'rel.: +49 (0) 2541/805-0 . Fax: +49 (0) 2541/805'111

30.04.201516:25:25

h Page 1 of 1

. Inro~huprer.de www.hupfer.de

HUPFEI(~PJ
Specsheet
Shelf louvred 120/50 N12 Polymer

Image example.tecnntcal Changesreserved, Wlthout(letorauon.

Article-code:

0601849

When the load is uniformly distributed, the individual shelf load amounts to:
600 - 1200 mm wide 150 kg 1400 - 1500 mm wide 100 kg
The total section load amount to max. 600 kg. Extension shelving units are 25 mm smaller than the basic
shelving unit.

All Infonnatlon / dimensions are approximate, technical changes reserved. @ HUPFER


HUPFERMetallwerke GmbH l\. Co. KG
OleselstraBe 200-48653 Coesfeld Postfach 1463 0'48634 Coesfeld . Tel.: +49 (0) 2541/8050

30.04.201516:07:08

Fa.: +49 (0) 2541/805'111 Infolil'hupfer.de

h Page 1 or 1

www.hupfer.de

HUPFEI(r.1 PJ
Specsheet
Plastic Corner Hook For Norm 20 slatted and solid shelves and for Norm 28
galvanised solid shelves

Image example,technrcal changes reserved,

without decoration.

Article-code:

0203126

Allfnformation / dimensions are approximate, technical changes reserved. @ HUPFER


HUPFERMetaifwerke GmbH & Co. KG
OleselstraBe 200-48653 Coesfeld Postfach 1463048634

Coesfeld Tel.: +49 (0) 2541/8050 Fax: +49 (0) 2541/805-111'

30.04.2015 16:03:13 h Page 1 of 1

,nlo@lhupfer.de www.hupfer.de

3.

Specifications

ITEM N.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BORROW

Type:

METROMAX_Q

Price:
Bl. 02 .10

-:

I~lementation
~

(4 TIERS)

in

reliminary observations.

Plastic tiers with "microban" antimicrobial, product


protection, removable and height adjustable
color: gray blue with Ix 4 tiers, load capacity
150~g/tier 2 posts and 8 "S"-hooks incl. high
compensatio.ntotal load capacity per rack compartment
planned
Width x Depth x Height:
1219 x 530
x 1900

offered
W
D

.......

Manufacture:
Metro
(or equivalent)
Type:
METROMAX_Q
Price:
B1. 02.11

STORAGE RACK (4 TIERS)

Implementation in accordance with preliminary observations.


See pos. nr. Bl.02.09
planned
Width x Depth x Height:
1370 x 530
x 1900

offered

.......

Manufacture:
Metro
(or equivalent)
Type:
METROMAX_Q
Price:
Bl. 02 .12

STORAGE RACK (4 TIERS)

Implementation in accordance with preliminary observations.


See pos. nr. B1.02.09
planned
Width x Depth x Height:
1524 x 530
x 1900

offered
W
D
.......
x

H
x

Manufacture:
Metro
(or equivalent)

VALUE
W:lI'rojekte\ZmZ\k 1ZOSSRadisson Blu Residence Riyadhl08 LP61\leistungsverzeichnis\OOtIKl Z085_Teoder_laundlY_~quipmenldoc

I
- PAGE4 from 15-

4.

Compliance Statement

<0

.....
C")

o
N
o
+
Cl'>

"'....."
ex)

o
<0

o
+
I"...-

(i'j

.....

:0

.~

IY

.~

C")

UJ
u,
0.
:J

:r:
IW
W

::I:
UJ

o
UJ
~
~
0..
:!!

o
o

UJ
..J

~
~
w
~
:!!

C
<1l

CONSULTANT

CLIENT

CONTRACTOR

cn:u 1J.!l.C.

Om rani

~~

;;.aIL pi "'::"'1..:::L!.lJ ..J~

cl14JJ1 j.!5J.D

KIng SalmanCent_ For Disability Re_reh


Science 8en.f1t1ng P.oplo

VUlJ........J1
~

ro--J,...a:.

PROJECT

Ref. No.:

I M I S I - I A I - VI

o Architectural

New Submittal

D Resubmittal

o Electrical
o Mechanical

D
D

Civil
Interior Design

Manufacturer

FurniturelEquipment

Specs. No.

Others

Drwg. No.

Supplier

11400

No. of Catalogue/Sample

~ss
Location:

81.05.00 - Chemical Store

Code: 81.05.01

Description: (Manufacture, Model, Type, Size, Colour, etc.)

0 Drawing

Catalogue

0 Sample

Document

Having checked this submittal, we certify that it confirms to the requirements of the Contract Documents in all respects,
except a, otherwise indicated he,e;, (
Material Engineer/Name & Signature:

~
('

Project Manager/Name & Signature : -f-:.~~+':"'_----

Received by:
Date

Name & Si nature of Consultant

Remarks / Comments:

tFtHl11:L~/~_~~~\"'__
~tM1111~ lie111 - eY-f~H t1NTTrL<)f\'\f!;{~ ~{T8

If{~~\----------------2, ~_~Mrl: una 7tJ!E NmfY1E- Wilt IQ1IbL~MlilY'AIIb- bRAJJJ .

Approved

Revise & Resubmit, Work shall not proceed

Approved as noted

Rejected - Resubmit

Consultant Site Office

No Action

Consultant Head Office

Engineer:

Name & Signature

Material Sheet Submittal

Project: RADISON BLUE HOTEL


Consultant: OMRANIA & ASSOCIATES
Main Contractor: RlDCO
KIT. Contractor: PRO-KITCHEN
Material:

/
EYEWASH

;>

UNIT

MSS # 151

Brand:

;r&s Brass
Model:

-:

/EW-7360B

1. Equipment Location

LAUNDRY Equipment

2. sPtalogues

T&S

BRASS AND BRONZE

WORKS,

INC.

2 SADDLEBACKCOVE / P.O. BOX 1088 / TRAVELERSREST, SC 29690


PHONE 800-476-4103 - FAX 864- 834-3518
Job Name:

Architect/Engineer

IV-'
~

REG.#A2601
ISO 19001

ales No.

EW-7360B
'. REUABILITY
[ . BUILT IN

Approval:

Notes:

14"
[355mmJ

14 3/4
[374mm)

1 1/2n
[38mm]

8 1/2
[215mmJ

WALL FACE

'
41
[1041mm]

05/16
[08mmJ
(3X)

38
[965mm]
35 1/2n
(902mm]

35[889mmJ

{ r~OOR

33n
[838mmJ
1/2" NPT SUPPLY

UNE

NOTES:
1.

**

2.

ANSI STANDARD Z358.1 SPECIFIES EYEWASH NOZZLES TO BE


33" [838mm] TO 45" [1143mm]
ABOVE THE FLOOR.
THESE DIMENSIONS ARE FOR REFERENCE

rown:

EYEWASH, WALL MOUNT

DMH

GEF

1 :8

Approved

Date:

JHB

12/20/10

J.'

3.

Specifications

ITEM N.

QUANTITY DESCRIPTION

LUMP SUM PRICE

UNIT PRICE
BORROW

. Stainless steel tank for condensate recovery and energy


efficiency
boiler to serve, FFT-WC, FTT1 and FITl-WC
planned
Width x Depth x Height:
460
x 810
x 1178

offered
W
D
.......

H
x

Manufacture:
ELECTROLUX
(or equivalent)
Type:
FSB24C
Price:
Bl.05.00

CHEMICAL STORE

B1.05.01

EYEWASH UNIT

lementation in accordance with preliminary observations.

'" ./.-~
._,
.~ .{"T'.---.

Feather-Flo ABS green plastic eyewash heaas f.'.:.~....


with built-in 2.5 gpm flow control,.__.,-;:-~
'-",--:=
Integral flip to dust covers automatic~a~l~l~_~~
__T-flow of water
Round stainless steel recepto with~c~h~r~o~m~e~~~~
brass stay open ball valve,
1/2" IPS inlet and outlet, 1-1/4" IPS waste
Universal emergency eyewash sign
Includes "Test This Week" tag to record weekly testin
record
e ui ment

..".__
..

s-:
",

,2!! . ti

planned
Width x
400

__

11

x Height:
x 200

Manufacture:
T&S Brass
(or equivalent)
Type:
EW-7360B

............

Price:
B1.05.02

HANDWASH BASIN KNEE-OPERATED

Implementation in accordance with preliminary observations.


time setting of 15 sec, with basin valance on 3Sid~
incl. 1/2" upright tap with mechanical knee
operation, turned down 30 mm on all
sides, incl. drain and overflow valve

I [
W:lProjekteIZOJZ\k120B5Radisson BluResidence Riyadh\OSlP6)\leistungmfleichnis\OOC\J(12085J

c--\ x.;

I-

VALUE [
ender_laundl)'_equipmenldcc

PAGE 14 trom 15

-P}
L,/)

4.

Compliance Statement

-:

en

Q)
-0
:::l

.s

CONSULTANT

CONTRACTOR

CLIENT

Om ra n i al).i IJ..O..C.

Lc.,u I I.!JI.::L!

~~
LJ

jJ
I.o.L..a.u ...:.J.J..o.I1 j.5. J.D
KIng Salman Center For Disability
Research
ScJonce Ben."tJng
Poopl.
\..WU...._..II ~
rv--L-c
;uj

PROJECT

'.

.!.;...

~ATERIAL

III

SUBMITTAL

Ref. No. :

o Electrical
o Mechanical

o Architectural

Civil
Interior Design

Manufacturer

Lo

tion: 81.02~Mobile

New Submittal

o Resubmittal

Date:

Furniture/Equipment

Specs.No.

Others

Drwg.No.

Supplier

11400

No. of Catalogue/Sample

Laundry Equipments

ode: 81.02.0&-

Description:(Manufacture, Model,Type, Size, Colour,etc.)

Catalogue

Drawing

DSample

Certificate

J1

Document

Having checkedthis submittal,we certify that it confirmsto the requirementsof the Contract Documentsin all respects,
except as otherwiseindicated herein (
Material Engineer/Name& Signature.:-

!~~
Q~

Project Manager/Name& Signature : -~-S-7<------

Receivedby:
Date

Status

Approved
roved as noted

Name & Si nature of Consultant

Revise & Resubmit,Work shall not proceed

Rejected - Resubmit

Consultant Site Office

Date

No Action.
_",; I

MEP

COMMENTS:

1. Contractor shall comply with the following:


a) Power supply 3 Phase system: 380/400 V, 60 HZ.
b) Power supply 1 Phase system: 220/230 V, 60 HZ.
2. If the electric load of the alternative proposed equipments exceeds the load as
specified

in the contract,

Ridco shall bear the responsibility

to fulfill

the

requirements at no extra cost or time implication.


3. The contractor should coordinate the connection of mechanical services with
the approved equipment

models and reflect the changes if required

on the

associated shop drawings before execution.


4. We expect proper installation

details of all approved

equipments

before

execution of associated services.

s.

The contractor is responsible to rectify any deviation at no extra cost or time

implication.

Material Sheet Submittal

Project: RADISON BLUE HOTEL


Consultant: OMRANIA & ASSOCIATES
Main Contractor: RIDCO
KIT. Contractor: PRO-KITCHEN

Material:

MJf[i(;NG MA CHINE
,.
MSS # 152

Brand:

~RMOPATCH
Model:

~o

_SEAL _(TWO_LINES)

1. Equipment Location

//

LAUNDRY Equipment

2. Catalogues

~-

Tbermopatdt

Since 1934

/"
;'

Y-300 Seal

Two lines of text


or barcode

Temporary textile

identification system

Prints, cuts & seats in one step 2 lines of text or barcode 11 Colours of Thermo-Seal! tape
easy maintenance
No solvents required, operator and environment friendlv

User friendly,

Barcodes

Thermo-Seale tape rolls #8635

The Y-300 offers barcode printing to make the registration


of items easier and faster. If you have laundry software
that is adapted to the use of barcodes you can have the
maximum benefit of this machine.

This tape is specifically made for the Y-300

The Y-300 can be connected by a serial interface to a host


computer so that the machine will act as a printer.

1111.
In1SWI

Adheres to cottons, poly/cotton


polyester and wools .
Thennoflags~

Store ... day ... week. ..


lot ... bundle
The Thermo-Seal" tag gives positive lot control to prevent
costly, time consuming mix-ups and lost garments. Large,
clearly printed letters, numerals or barcodes make sorting
easier. Four to twelve characters are set in seconds for any
code. The tape, available 1n eleven solid colors, allows you
to combine the color code with your printed code to make
sorting even easier and faster.

Specifications:

Thermo-Seal" temporary marking machine. The eleven


colours are orange, yellow, red, grey, lavender, white,
green, pink, blue, gold and tan. Barcodes only work on
"lighter" colours (contrast).
blends, loose weave

tags

Where Thermo-Seal" tape can not be applied directly to


the garment, apply tape to a Thermoflags" tag and staple
or pin to garment. Available in white.

Ink ribbon cartridge #RC2410-15


This cartridge features black indelible ink ribbon that
prints sharply and cleanly on Thermo-Seal" tape rolls.
Print stays clear and legible through laundering, dry
cleaning and finishing operations. The ink cartridge is very
simple to snap into place.

For technical details please see our Spedfications leaflet which can be downloaded from our website at l'iww.thermopatch.com

Thermopatch

Corporate Headquarters

USA

T H 315 446-S110

Thermopatch

European Headquarters

The Netherlands

T +31 36.549 11 1l

Thermopatch

AUstralia Ply Ltd

Australia

T +61 395325722

Canada
United Kingdom

T +1519748-5027
T +44 1539722122

Thermopatch Canada Inc


Kannegiesser UK ltd

F + 1 315 HS-S046
F +31 36532 03 98
F +386 2 80 55 232f+1519748-1543
F +44 1539721000

sales@Hhermopatch.com
sales@thermopatch.nl
marktpatcha ust@blgpond.com.au
broussel@thermopatch.com
thermopatch@kannegiesser.com

3.

Specifications

ITEM N.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BORROW

planned
Width x Depth x Height:
940
x 560
x 1800

offered
W
D

.......

Manufacture:
LKE
(or equivalent)
Type:
3210000
Price:
Bl.02.04

LAUNPRY TROLLY (330 L)

Implementation in accordance with preliminary observations.


- 2 rigid and 2 swivel castors.
- bowl constructed of aluminium
planned
Width x Depth x Height:
960
x 580
x 770

- 330 L

offered
W
D

.......

Manufacture:
Electrolux
(or equivalent)
Type:
919.000.1-03
Price:
Bl .02 .06

MARKING MACHINE

L/
I~lementatdon

in accordance with preliminary oDservations.

Speeds marking, Helps prevent sorting


errors, Reduces sorting labour.
Temperature range: 50-210C
Timer:1-99sec; Weight: 1~
Sealing plate: 65x20~
Noise level: <70 Decibe~
Air pressure range: 3,5-5 Bar
Shipping weigh: 24 Kg
Shipping dimensions H 500 x W 490 x D 530
Certification: CE

DeEth x Height:
x 389

x 432

............................

LINES ....................

I I

VALUE

W:\ProjekleI201Z\klZ08S Radisson Blu Residence Riyadh\08 LP67\leislungsvemichnis\D()C\K1Z085_Tenderjaundl)'_equipmenldoc

I
PAGE Z from 15

4.

Compliance Statement

.,

'"E.,

VI

~z
c._ >E>0
o

>->-

>-

>- >- >- >- >->- >- >- >-

E
E

lei)

C")

lO

...

(J)

...

E
E
0

0 ,-0
::J ..(ij 0 N

U
::>

"0

Il.
"0

.,.,
0

c.

e,

Qi

.0

...ro

lO

{2 Ol
'<t

ro

0 .;,_

OJ Ol
W ._
Q)CO

g
0 {2 N
C") N
"'" ~X o IC")
X 0
~ 'E g Ol lO lO
..i::::
0
C X X
<D
,._
Co
~ E0
~ Ol .,....
0 .Q N
v C
E t0 C
lO
0.(')
.....
.$
Vl ~
:c 0.ro Qi> ~~ ~g ::c to::~ oQ)"<tX
-c ~ Vl
~
> '(I) ~ E ~
Vl t
X<D
::J
~ ::J
C
Vl
0
.elO
i=
Q) Vl
.~
0.
iii
~
~ lO
-~
o
~
C/)
iii
Vl
-c
-o
CO
c
0 0. :E
C/)
.3 ~ ~E
C/) Z
'E ~
I
4:
'6
~
g .!!! 2>
lO
.0

(J)

Q)

Q)
(J)

CO

Q)

Q)

Q)

Q)

:~

Q)

Q)

Q)

::c

o0
!;(
Cl..

0 I~

~
0:: ~
W C/)
::c

I- 0

00
C")

jro >-

~0

(j)

:2

~
s:

Z
::::::i

W
Z
::::::i

C/)

I-

E
E

w
C/)
0
0

C")

>I

I-

Cl..

0
:2

ei)

C")

.o

Vl

(5
.._

..E

.l!l

lO

...ro

...0
::J"(ij 0

.0
e sfc g ro ~lO
:;

0
Q)
Vl

.. :g t g
~ E t ~ .....
cr

ro 0

Ol

E
E
0
:l
c;i
lO

CO
c q> ..-

Qi

.0

0
Q)
0

lO 0
<D
Q) V

W
Z

0
X
0
Ol

ro

"<t
to :l
"<t

lO

C")

~ W
o
X

,._ ~ s:
:Q 0
0
C
lO

:c
OJ Ol
._
Q)co
IC")

c X X
0 .eN

I:J

o0
~ ~
t:
0

~_J

0::
WW
~
~
~
3
iii
IC/)
:c
I
_E\ -c
Qi
(ij
\ W
0. > ~ g Vl to::
1-0
~
>
tou ~
'E
E
~~
I~
::J
'0
~
c
.2 i=
l\fL
Vl
0 Q) .s ~}} OC")
W
t;: J 0. ::J
.~
~
Vl
o
t
~
iii
Z'
Vl
W
-c
Q)
U
-c
ro 0 :E
.,
>c
::x: ~
C/) Q)
c.
~ell 0:: ~
0:: .:_j
C/) Z ~
~
rn
en
E
E
I
W
I
~
'v
'6
z o
I0

g
o
~
en
~
C>
0::

Vl

(J)

C
Q)

Vl
Vl
Q) Q)
0

Q)

Q)

Q)

\,

Q)

liC")
0 Q)"<t

:~

Q)

ii:

Q.

:E

o
o

52
0::

..J

0::
w

~
:E

C/)

';

en

~... E
Q)

..
u

c.

rn

Q)~

r.
o

iii~

I-

~C/)

:~
s:

GI

CONSULTANT

CONTRACTO

CLIENT

Om ra n ial)_j 1J1l.C

~~
l:J1.,o.L...u ~

AiiLc.JJ I ..:::...
b..!JJ

Ij5}D

...

King Sal.....n Center For O_blllly R_rch


Science Ben.f1dng People VUl.i..........J1
E-AJ....t ro--J....c

_...._._.c.

PROJECT

..

-.;

:.; ':

~O......

.....--;'Jt~

Ref. No.:

Date:

o Architectural
o Structural

o
o

o Electrical
o Mechanical

Civil

Furniture/Equipment

Specs. No.

Interior Design

Others

DlWg. No.

Manufacturer

Supplier

New Submittal
Resubmittal
11400

No. of Catalogue/Sample

~I

Description: (Manufacture, Model, Type, Size, Colour, etc.)

0 Drawing

Catalogue

0 Sample

Calculation

Certificate

Document

$)

Having checked this submittal, we certify that it confirms to the requirements of the Contract Documents in all respects,
except as otherwise indicated herein (

)\~
Material Engineer/Name & Signature:

<

~-

Project Manager/Name & Signature:

-::,r+-V-----

Received by:
Date
Remarks I Comments:

:cc>-tc!l_.__,

_R----,E~?-Approved
... Approved as nota

Revise & Resubmit, Work shall not proceed

Rejected - Resubmit

Consultant Site Office

Date

No Action

Consultant Head Office

gnature

Material Sheet Submittal

Project: RADISON BLUE HOTEL


Consultant: OMRANIA & ASSOCIATES
Main Contractor: RIDCO
KIT. Contractor: PRO-KITCHEN

Material:

LAJ!~Y
::::;:

TROLLY (330 L)
MSS # 153

Brand:

~i
Model:

,/

.>:
BA20

1. Equipment Location

LAUNDRY Equipment

2. Catalogues

#J EO'

Anodised light alloy transport trucks

/'

Not perforated execution.

/sA

Perforated execution 0 10.

20

Smooth surfaces. Ribbed


walls. Strong bottom
frame and light alloy
bumper.

1695 CR

858 CR

Anodised light alloy truck with a cut-out on a long


side.
Not perforated.

Watertight anodised light alloy


truck. Drain tap.
Perforated double bottom.

Non perforated trucks:


Int. mm

Ext. mm

Weight

Art.

Code

Lt.

SA 20
SA 20
SA 20
SA 20
SA 20

RABAlOON002

1000 x 500 x 610 H

1030 x 530 x 770 H

100

16.70

305

RABAlOON004

1000 x 600 x 610 H

1030 x 630 x 770 H

100

17.80

366

RABA200N010

920 x 680 x 685 H

950x710x875H

125

20.40

428

RABA200N006

1300 x 700 x 610 H

1330 x 730 x 805 H

125

25.00

555

RABA200N008

1300 x 700 x 685 H

1330 x 730 x 880 H

125

27.00

623

Art.

Code

Int. mm

Ext. mm

Disp. Weight

1695 CR
858 CR
1380 CR
1380 CR

RB16950NOOI

1470 x 900 x 670 H

1500 x 930 x 865 H

1-2-1

37.80

886

RG08580NOOI

1000 x 600 x 450 H

1030 x 630 x 735 H

2+2

31.60

270

Lt.

RC13800N009

700 x 560 x 560 H

720 x 580 x 710 H

2+2

12.20

220

RC13800N011

950 x 550 x 600 H

970 x 570 x 750 H

2+2

14.10

313

Perforated trucks:
SA 20
SA 20
SA 20
SA 20
SA 20

RABA2002001

1000 x 500 x 610 H

1030 x 530 x 770 H

100

16.00

RABA2002003

1000 x 600 x 610 H

1030 x 630 x 770 H

100

17.00

366

RABA2002009

920 x 680 x 685 H

950 x 710 x 875 H

125

19.50

428

RABA200200S

1300 x 700 x 610 H

1330 x 730 x 805 H

125

23.90

555

RABA2002007

1300 x 700 x 685 H

1330 x 730 x 880 H

125

2S.80

623

1380 CR

305

Not perforated execution,


stiffening ribs on walls,
anodised.

3.

ITEM N.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BORROW

planned
Width x Depth x Height:
940
x 560
x 1800

offered
W
D

.......

Manufacture:
LKE
(or equivalent)
Type:
3210000
Price:
B1.02.04

LAUNDRY TROLLY

Implementation in accoraance witb

relimina~

o~servations.

- 330 L

..............

Price:
B1.02.06

MARKING MACHINE

Implementation in accorda.ncewitb preliminary observations.


Speeds marking, Helps prevent sorting
errors, Reduces sorting labour.
Temperature range: 50-210C
Timer:1-99seci Weight: 18,5Kg
Sealing plate: 65x20mm
Noise level: <70 Decibel
Air pressure range: 3,5-5 Bar
Shipping weigh: 24 Kg
Shipping dimensions H 500 x W 490 x D 530mm
Certification: CE
planned
Width x Depth x Height:
556
x 432
x 389

offered
W
D

.......

Manufacture:
THERMOPATCH
(or equivalent)
Type:
Y-300_SEAL_(TWO_LINES)

Price:

I I

W:\I'rojekte\1012\k120B5 Radisson Btu Residence Riyadh\08 LP67\Leistungmrzeichnis\OOC\K12085_lenderjaundry_equlpment.doc

VALUE

I
. PAGE ztrom 15 .

4.

Compliance Statement

IZ
W

..J

:5
CJ

Ii)

.!::::

~~>->->o
o

>-

>-

(")

XO

:::J"'!'
2
0
_0

uo
0)

-C])

w.. C])

....W,
W
::J:
(/J

o
(/J
0:

~
Il.
:E

o
o
(/J

...J

0:
W

~
:E

~.:.i

ffifg~

CONSULTANT

CLIENT

Om ran i

crw IJ.O.C

'~'I

iUiLc.,tJ1 "'::"'b.flJ
Sclonce Benefidng

t.-,~~

C0tfrR'ACTOR

LJl.o1.--u

People

I...!..llDJI is}D

vut.i.......JJ~

ru---L-c

....._ .....".f.O' .
--Kln-9-Se-'m-a-n-Cent--er-Fo-r-D-Isa-blI--lly-Research-----."j1-

1-PROJECT

.:-';:::;~

,:~

DEVELOP*D<Tc<t\{p.~oy

~~R)i.\DH

IS

... _I. \..AJ9R.CO~"'


TR~~]
"

.'JtII'~

~:!!

Radisson Blu Hqter&FurnishedA artments DQ, Ri adh

AfERIAL SUBMITTAL

IM IS I - IA I - I 2 I2 I 0 I

Ref. No.:

o Architectural

o Electrical
o Mechanical

tructural

Date:

Civil

Fumiture/Equipment

Specs. No.

Interior Design

Others

Drwg. No.

Manufacturer

ITCHENEQUIPMENTS

.
Code:

LG.02.00:

LG.02.16

Location:

/'

11400

No. of Catalogue/Sample

/'

, XTENSION(4 TIERS/
Location:

Supplier

New Submittal
Resubmittal

~PFER

Storage

UG.02.00 - Storage

Code: UG.02.04

Description: (Manufacture, Model, Type, Size, Colour, etc.)

0 Drawing

Catalogue

0 Sample

Calculation

Certificate

Document

Having checked this submittal, we certify that it confirms to the requirements of the Contract Documents in all respects,
except as otherwise indicateo herein (
Material Engineer/Name

& Signature:

Project Manager/Name

& Signature : ----1~~'-I'-:.._---

Received by:
Date

-/__

Name & Si nature of Consultant

~t~

-I=-A~?tL...:..LrH

J)t1ti~le1l\]

~~~~~~~~~~(~~~~~~~~~n1
~\r<eo
~(Et ~:
f;I-I-L~~:....______!__vJ~11'\lt-'-!..-'_~

Approved as noted

Revise & Resubmit, Work shall not proceed

Rejected - Resubmit

Consultant Site Office

No Action

Consultant Head Office

Engineer:

Name & Signature.

Material Sheet Submittal

Project: RADISON BLUE HOTEL


Consultant: OMRANIA & ASSOCIATES
Main Contractor: RIDCO
KIT. Contractor: PRO-KITCHEN
Material:

RACK EXTENSION
(4 TIERS)

MSS # 130

Brand:

/'

HUPFER

Model:

-:

020~17+0601919+0203126

1. / Equipment Location

KITCHEN Equipment
MSS

2. ~~talogues

HUPFEIt~ PJ II
Specsheet
Upright 200/50 N20/12 600 kg Aluminium

Image exarnple.tecnnicalchanges reserved, without decoratlon.

/7

Article-code:

0201317

Whenthe load is uniformly distributed, the individualshelf load amounts to:


Slatted shelves:
Solid shelves:

600 - 1000 mm wide: 200 kg

1200 mm wide: 160 kg 1400 -1500 mm wide: 100 kg

600 - 1000 mm wide: 150 kg 1200 - 1500 mm wide: 100 kg

Bottle shelves:
Box storage shelf:

800 - 1000 mm wide: 100 kg


1000 mm wide: 100 kg

Dependingon the uprights used, the section load amounts to 600 kg or max. 1200 kg. Extensionunits are 25
mm smaller than the basicshelving unit.
Pitch: 150 mm

All information / dimensions are approximate, technical changes reserved'.- HUPFER

30.0~.2015 16:25:25 h Page 1 of 1

HUPFERMetallwerkeGmbH & Co. KG


OieselstraBe200-48653 Coesfeld Postfach 1463 0Q8634Coesfeld rei.: +49 (0) 2541/805-0 Fax: +49 (0) 2541/805-111 .Info@hupfer.de www.hupfer.de

HUPFEIt~ PJ II
Specsheet
Shelf Jouvred 140/50 N12 Polymer

1mage example,technical changesreserved, without decoration..

/'

Article-code:

0601919

Whenthe load is uniformly distributed, the individual shelf load amounts to:
600 - 1200 mm wide 150 kg 1400 - 1500 mm wide 100 kg
The total section load amount to max. 600 kg. Extensionshelving units are 2S mm smaller than the basic
shelving unit.

All information / dimensions are approximate, technical changes reserved. HUPFER


HUPFER~letallwer~e GmbH& Co. KG
DieselstraBe20048653 Coesfeld Postfach 14630-48634

30.04.2015 16:32:10 h Page1 of 1

Coesfeld Tel.: +49 (O) 2541/8050 Fax: +49 (O) 2541/805'111 . info@hupfer.de www.hupfer.de

HUPFEI(~

pj II

Specsheet
Plastic Corner Hook For Norm 20 slatted and solid shelves and for Norm 28
galvanised solid shelves

Image example,technical chonges reserved, without decoration.

Article-code:

0203126

All information / dimensions are approximate, technical changes reserved. HUPFER


HUPFERMetallwerke Gmt>H& Co. KG
DieselstraSe 200-48653 Coesfeld . Postfach 1463'0-48634

Coesfeld Tel.: +49 (0) 2541/805-0

30.04.2015 16:03: 13 h Page 1 of ~

Fa,,: +49 (0) 2541/805-111 fnfo@hupfer.de www.hupfer.de

3.

Specifications
/
/
(

ITEM N.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BORROW

LG.02.14

STORAGE RACK (4 TIERS)

Imp~ementation in accordance with pre~iminary observations.


See pos. nr. LG.02.02
planned
Width x Depth x Height:
1370 x 530
x 1900

offered
W
D
.......
x

H
x

Manufacture:
Metro
(or equivalent)
Type:
METROMAX_Q
Price:
LG.02.1S

RACK EXTENSION (4 TIERS)

Implementation in accordance with preliminary observations. ~=~~~~~~~


See pos. nr. LG.02.02 with 2 posts and 8 "S"-hooks
planned
Width x Depth x Height:
1524 x 457
x 1900

offered
W
D
.......
x

H
x

Manufacture:
Metro
(or equivalent)
Type:
METROMAX_Q

,<~

--.;

---_
=s-.

fo02.,. 1
Price:

accordance with pre~imina~

observations.

See pos. nr. LG.02.0~2~~


/'

planned
Width x
1370

x Height:
x 1900

..............

Price:

I I

VALUE

W:\ProjekteI2012\J<12085Radisson Blu Residence Riyadh\OBlP67\leistungsvaaeichnis\OOC\K12086_K903_kitchen_equipment_Mr_ground_floor.dot

- PAGE 9 from 66 -

ITEM N.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BORROV

UG.02.03

STORAGE .RACK (4 TIERS)

Implementation in accordance with preliminary observations.


See pos. nr. UG.02.D2

planned
Width x Depth x Height:
1219 x 530
x 1900
Manufacture:

offered
W
D
.......
x

H
x

Metro

(or equivalent)

Type:

METROMAX_Q

Price:
1

RACK EXTENSION (4 TIERS)

nr. UG.02.02 wit~ 2 posts

and 8 "S"-hoo~s

..

._

Price:
UG.02.05

STORAGE

RACK

(4 TIERS)

Implementation in accordance with preliminary observations.


See pos.

nr. UG.02.02

planned
Width x Depth x Height:
1524 x 530
x 1900
Manufacture:

offered
W
D

.......

Metro

(or equivalent)

Type:

METROMAX_Q

Price:

I I

W;\ProjekteIZ012\kli085 Radisson Btu Residence Riyadh\08lP67\leistungsverzeichnis\130802\DOC\KI2085_K9~_l30905_kitchen_equipment_upper_ground_floor.doc-

PAGE2 from 60

4.

Compliance Statement
./
./

IZ
W

.,

..

..J

5
a
w

G>

DC

V)

~z
0.-

E>o
o

>-

>-

>-

en

.Y-

(0

oco

..-

o
N
o

"0

~ ~
U
:l

o
"

0:

..~

-e

0.

0:

en

010

a.

x)(

c;; 'iii g
o I..-

~ =5_g

.~ ~~
~
x R
N ~~

~\~
CD
N
M

Q)

0
N
0

w"u..~

a...
0
=>(0

I~~
0..-

-,
zCil

COo

..:J

....
c

en
o
a.

0:::0>

o
2

Q)

CJ)

0>

0>

..0

en

(0

.Y-

o
o

+
I'..-

in

0
N
0

0:::
W

u..

a...

=>
I

....
W

't
l-

:::!.

rJ)

Z
0

:I:
Z

enz

rJ)

e,
~

o
o
rJ)

..J

w
~
~

lW

::.::

tl
c

'"E
...
G>

'5
a
G>

DC

"0

co
en

(i)\
o

.....

.c.

.Qlg
Q)

arlOx

1-0
wo:::
21-:.. W
O2

-M

:5

.~ 0

~
I;:

G>

0.
(/)

N :5~
o

"0..-

<9
~
...J
...:
c
en

Q)
Q)
CJ)

o~

......0:::2

a. 'x x
N .c."<o

.2

0>

)"

wi "
o

0:::
IDO

CONSULTANT

CLIENT

CONTRACTOR

Ornranraulucc

;uilL,lI1 "::"b..j.1l 0~

t..:.lW1 pJ.O

KIng Salman Center For Dlsablftty Resaarc:h


Sclonce Be-net1ttng People
_W_ ....

uuU-__.J)~

CCl'.O ......

PROJECT
Radisson Blu Hotel&Furnished A artments DC, Ri adh

dATERIAL

SUBMITTAL

I M I S I - I A I - I 2 I if 1 I

Ref. No.:

o Architectural
o Structural

o Electrical

o
o

Mechanical

Civil
Interior Design

Manufacturer

TE

New Submittal

o Resubmittal

Date:

Fumiture/Equipment

Specs.No.

Others

Drwg. No.

Supplier

No. of Catalogue/Sample

11400

Code

IONING FORM F~ISHERS

ClUDING LAGOo.N'WET CLEANING


_.,/'

Model: j7T-WC
Loc 6on: 81.03.00 - Full Scope Laundry
ode: 81.03.11

Description: (Manufacture, Model, Type, Size, Colour, etc.)

0 Drawing

Catalogue

0 Sample

Certificate

Calculation

Document

Having checked this submittal, we certify that It confirms to the requirements of the Contract Documents in all respects,
except as otherwise indicated herein (
Material Engineer/Name & Signature _:....::
=_"~I-L-""'_-_'_-~
Received by:
Date

Name & Si nature of Consultant

Remarks / Comments:

-_~~-/IQTetUhZ

1----

~-,1C~;pJ~n'-=..!!eW~~.
~

Status

Approved

Revise & Resubmit, Work shall not proceed

Approved as noted

Rejected - Resubmit

Consultant Site Office


Engineer:

No Action

Consultant Head Office

MEP

COMMENTS:

1. Contractor shall comply with the following:


a) Power supply 3 Phase system: 380/400 V, 60 HZ.
b) Power supply 1 Phase system: 220/230 V, 60 HZ.
2. If the electric load of the alternative proposed equipments exceeds the load as
specified

in the contract,

Ridco

shall bear the responsibility

to fulfill

the

requirements at no extra cost or time implication.


3. The contractor should coordinate the connection of mechanical services with
the approved equipment

models and reflect the changes if required

on the

associated shop drawings before execution.


4. We expect proper installation

details of all approved

equipments

before

execution of associated services.


5. The contractor
implication.

is responsible to rectify any deviation at no extra cost or time

Material Sheet Submittal

Project: RADISON BLUE HOTEL


Consultant: OMRANIA & ASSOCIATES
Main Contractor: RIDCO
KIT. Contractor: PRO-KITCHEN

Material:
,//

TENSIONING FORM
FINISHERS incl. lagoon
z
wet cleaning
,

MSS # 131

Brand:

Model:

~T-WC

1. Equipment Location

.:

.:

LAUNDRY Equipment

2. Catalogues
/

B) Eledrolux

PROFESSIONAL LAUNDRY

Tensioning Form Finishers


FFT-O, FFT-WC

Features and benefits

Main options

User-friendly control panel with display

2HP motor

Pivoting control board

All steam iron with support and teflon shoe


(standard for FFT-WC)

Automatic finishing control with microprocessor for an


elevated productivity
9 different work programmes for garments of any fabric
and size
Possibility to select ironing mode: automatic,
semi-automatic or manual
Rotating former (180 for FFT-D and 360 for FFT-WC)
for an easy handiness of garments
Vertical and horizontal garment tensioning for a
perfect finish
Removable front collar clamp
Adjustable shoulders
Automatic size adjustment
Strong ventilation unit with air-regulation
Possibility to exclude each of the tensioning devices
according to needs
Anti-stretching device
Upgraded air heating system (for FFT-WC)

Clamps for side vents (standard for FFT-WC)


360 rotation of the form (for FFT-D)
Side clamps
Electronic air regulation (FFT-WC)
Connection with steam trap for FFT-D without iron

8) Electrolux
Rec steam pressure
Steam consumption
Condensate
Compressed air
Rec. air pressure
Air consumption

15

15

500-600
15-20
15
8
600-700
40

500-600
20-25
15
8
600-700
40

160
180

170
190

620
1020
1575-2325
780-1530
550
345
795
1330
830
530
160
40
45

620
1020
1575-2325
780-1530
550
345
795
1330
830
530
160
40
45

~hipl:?ing qaUi
net kg
crated, kg

Dimensions in rnm
A Width
B Depth
C Height
D

E
F
G
H
I
J
K
L
M
1
2
3
4
5

Control panel
Electrical connection
Steam inlet
Condensate
Air inlet

/'

/
c

.,;

g
2

Rear side

"S

Right side

Front

<?
.2

...

.g
v

'"s

::! l;

~
~

.l1;

15
2
:<:

'"
$ :;

www.eLectrolux.com/professional

~ ~

Share more of our Lhinking at www.eLectrqLux.com

< ~

z0

3.

Specifications
/

ITEM N.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BORROW

28 kWh; Evaporation: 803g/min; Energy kWh/litre water


evaporated: 1,2kWh/l High productivity - 2 full loads per hour;
Selection of temperature and time for easy operation;
microprocessor control; Emergency stop
planned
Width x Depth x Height:
1290 x 1295 x 2465

offered
W
D

.......

Manufacture:
Electrolux
(or equivalent)
Type:
T4900
Price:
Bl.03.10

TRUMBLE DRYER (60kg)

Implementation in accordance with preliminary observations.


Main specifications: Rated capacity, filling factor
1:20: 60kg/ l32lbi filling factor
1:25: 48kg/ 105lbi Drum volume: 1200litrei Drum
diameter: 1240mm; Consumption data: Total time at
45/60 26kg min Energy consumption at 45/60 kg
30,8kWhi Evaporation 923g/min; Energy kWh/litre water
evaporated 1,28kWh/l 2 full loads per hour +
SeLection of temperature and time for easy operation +
microprocessor control + Reversing drum + Emergency stop
planned
Width x Depth x Height:
1290 x 1485 x 246i

offered
W
D

.......

Manufacture:
Electrolux
(or equivalent)
Type:
T41200
Price:
1
I~lementation

TENSIONING FORM FINISHERS

in accordance with p'reliminary

FINISHING LAGOON SYSTE


Steam, air and vacuum connection: Steam 15 DN;
Rec. steam pressure 500-600 kPa; Steam consumption
20-25 kg/hi Condensate 15 DN; Compressed air 8 DN;
Rec. air pressure 600-700 kPa; Air consumptio
401/min; net, 170 kg 2HP motor, All steam iron
pport and teflon shoe, Clamps
0 rotation of the form, Side
r regulation, Connection with

VALUE

W:\Pcojekte\1011\k 12085 Radisson Btu Residence Riyadh\08 lP6 7\leislUngsyerzichnis\DOC\K 12085_ Tender_lauodry _ eqoipmenldoc

I
PAGE 9 from 15

ITEMW.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BORROW

Depth x Height:
x 1020 x 1575

offered
W
D

.......

(or e
Type:

Price:
Bl.03.12

Implementation

,--

HOSENTOPPER

in accordance

with preliminary

observations.

FINISHING LAGOON SYSTEM


Steam, air and vacuum connection: Steam 15 DN; Steam
consumption 15-20kg/h; Rec. steam pressure 500-600kPa;
Condensate ISDN; Compressed air 8DN; Air consumption
401/min; Air pressure 600-700kPa. 2HP motor; Manual
waist size adjustment; Manual leg size adjustment,
Adjustment for steam, air and steam heater devices,
Anti-stretching device on waistband and legs for the
ironing of elastic trousers
planned
Width x Depth x Height:
885
x 905
x 2025

offered
W
D

.......

Manufacture:
Electrolux
(or equivalent)
Type:
FTTI
Price:
B1.03.13

Implementation

LAUNDRY PRESS

in accordance

with preliminary

observations.

wight netto: 300Kg; High temperature polished head,


dries the fabric and gives it a flat finish; High
pressure, achieves an excellent finish; Air
operated, reduces operator
fatigue; Padded buck, reduces impressions
boiler to serve FPA6-WC and FSF
planned
Width x Depth x Height:
970
x 1135 x 1220

offered
W
D
.......
x

H
x

Manufacture:
Electrolux
(or equivalent)

I I

W:\Projekle\201 111<12085 Radi~on Btu Residence Riyadh\08 LP6 7\leislungsveneichnis\DOC\J(1

VALUE
ZDB5_Tender_laundry _equlpmentooc

I
PAGE10 from 15 .

4.

Compliance Statement
/'

en

..
..

E
0::

>-

>-

>- >-

>-

30
Os
0:::.
1-1-

OLL
WLL
...J ..

o
~

lLL
LL

...J

0:::

I-

o
W
...J

e;,
c
co

C
CI>

j
c
o

o
Ol
..!!!

u
.E

\ ~
\~
xo
I-

W
W

:t:
en

:::::E

o
en

o
z

0:::

o
LL

C2

<t

:!:

Il..

U5

W
I-

o
en

...J

<t

C2
w

~
:!:

W...J
W

00

~~
co

CONSULTANT

CLIENT

CONTRACTOR

Om ran ia1).J IJ.O..C.

;;.gIL pi "::"I.::l..! lJ LJ I.o.L.a.I ....:...U.o.J I j!:i}lJ


KIng Salntan CenterFor Dlsabfuty Research
Sclenco

BenoAtlng

P.opt.

\,.JJJlL.-J1~

PROJECT
Radisson Blu Hotel&Furnished A artments DQ, Ri adh

MATERIAL SUBMITTAL
Ref. No.:

1M'S'

- , A' - , 2

o Architectural
o Structural

146,

o Electrical
o Mechanical

Civil

Furniture/Equipment

Specs. No.

Interior Design

Others

Drwg. No.

Manufacturer

Description"

New Submittal

D Resubmittal

Date:

Supplier

11400

No. of Catalogue/Sample

Model: Fln-WC
Location: 81.03.00 - Full Scope Laundry
Code: 81.03.15

Description:(Manufacture,Model,Type, Size, Colour,etc.)

Catalogue

Drawing

DSample

Calculation

Document

A_

Havingchecked this submittal,we certify that it confirmsto the requirementsof the Contract Documentsin all respects,
exceptas otherwise indicated herein (
MaterialEngineer/Name& Signature :

~
~

Project Manager/Name& Signature : --,.-,~_'_

Z/

Receivedby:
Date
Remarks/ Comments:

Status

Approved

Revise & Resubmit,Work shall not proceed

Approved as noted

Rejected - Resubmit

Consultant Site Office

Date

No Action

Consultant Head Office

MEP

COMMENTS:

1. Contractor shall comply with the following:


a) Power supply 3 Phase system: 380/400 V, 60 HZ.
b) Power supply 1 Phase system: 220/230 V, 60 HZ.
2. If the electric load of the alternative proposed equipments exceeds the load as
specified

in the contract,

Ridco

shall bear the responsibility

to fulfill

the

requirements at no extra cost or time implication.


3. The contractor should coordinate the connection of mechanical services with
the approved equipment

models and reflect the changes if required

on the

associated shop drawings before execution.


4. We expect proper

installation

details of all approved

equipments

before

execution of associated services.


5. The contractor is responsible to rectify any deviation at no extra cost or time
implication.

~.

Material Sheet Submittal

Project: RADISON BLUE HOTEL


Consultant: OMRANIA & ASSOCIATES
Main Contractor: RIDCO
KIT. Contractor: PRO-KITCHEN

Material:

IRONING BOARD
MSS # 132

Brand:

//
~LECTROLUX

Model:

/FITI-WC

1. EqUiP/Location

LAUNDRY Equipment

2. Catalogues
/,/'

B) Eledrolux

PROFESSIONAL LAUNDRY

Wetcleaning

Ironing Tables
Fill-WC, Fll2-WC

o!

fl'

r"

Features and benefits

..

.:

Utility shape, for general purpose


Integral vacuum fan holds the garment in place and
dries the fabric
Blowing from table eases finishing of light weight
fabric and linings
Table height adjustment ensures operator comfort
Adjustment of blowing and vacuum strength
Mobile, eases re-location
Steam electric iron with Teflon shoe and silicon iron
rest
Steam gun for raising the nap of some fabrics
Sleeve arm for ironing awkward shapes
Shoulder buck for restoring the shape of washed
jackets
Overhead gantry to support iron hoses
Ught, illuminates the working area
Swivelling iron rest for operator convenience
Additional pedals (vac/blow) for dual side operation
(for FIn-WC)

Main options
Integral steam boiler for self-contained installation
(standard for FIT2-WC)
Spotting arm eases the removal of stains
(in alternative to the shoulder buck)

Ete<;tricat connections

Fm~WC

FI1'2;.WC

2
2

8) Eledrolux

Voltage

<'1.

L,OOV3N AC 50Hz
208V-2L,OV 3AC 60Hz

kW
kW

Steam connection
Steam
Rec. steam pressure
Steam consumption
Condensate

ON
kPa
kg/h
ON

300-500

3
8

130
150

170
190

2135
lL,35
1900-2080
815-995
1560
1715

2220
lL,35
1900-2080
815-995
1560
1855

Shipping d~ta
net, kg
crated, kg
Dimensions in mm

Width

B Depth
C Height

0
E
F
5

1 Control panel
2 Electrical connection
3 Steam connection

6 Sleam gun

L, Condensate

8 Overhead lamp

Pedals
Shoulder buck

2
7

~~

,1:0 ...

F
ol

g
0

.:

3
0

j
~
~
+g
.::;
0

..

g
!!i
0

i '"

.go

C>
eo

,_,.
www.electrolux.com/professional
Share more oi our thinking at \W{W.eleclfolux.com

... ~
~

"

z ~
~ ~

3.

Specifications

ITEM N.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BORROW

Type:

FPA6-WC

Price:
B1.03.14

SHIRT FINISHER

Implementation in accordance witb preliminary observations.


Shirt Finisher, steam heating
- Pneumatic shoulder - size setting
- Base module -for shirts, blouses, jackets,
dustcoats etc.
- Front clamp, collar clamp, pneumatic sleeve
T
tensioners, Veit Hand Finisher model 2157,
with hand guard and Teflon hose, connections for
power supply and steam supply. Stem consumption: 2,2kg /hour
- Holder with support stand for Hand Finisher
- Installation Set

-----' ..

planned
Width x Depth x Height:
1745 x 9.50 x 1700

offered
W
0
.......
x

H
x

Manufacture:
ELECTROLUX
(or equivalent)
Type:
FSF
Price:
/'

Bl.03.1S
I~lementation

~~ONING

BOARD

~n accordance witb

lanned
Width x Depth x Height:
139~
x 1075
Manufacture:
(or e
Type:
Price:

I I

W:\Projekte\2012\k 12085 Radisson Btu Residence Riyadh\08lP67\leislungsvmeicimis\OOC\J(12085_TendeclaundI}'3Quipmenldoc

VALUE

I
. PAGE 11 from 15 .

4.

Compliance Statement

>-

>- >-

>-

30
o~
rr:'
1-"o!:::
WLL

uLj
..
W
00

zo

~2

(])\

:E

,QlLO
<l)1'-

~
..-

I~

l-

U)

e(3

(])\

rr:
4:

i2

C)

0..

(])

:E

,Ql
<l)

rr:

U)

CI>

a:

..J

~2

0
0

zo

ill

U)

~
:iE
0

00

<l)

i2
W

--

~
:iE

ro2C1)_~

]!E

0>2

rr:'
1-"-

uL..i
..
W

:::I

:I:

o~
WLL

w
w

30
o!:::

LL
l-

..;

CI>
0.

I/)

.cu
CI>

I-

CONSULTANT

CLIENT

omran icn..u IJ.O..C

~
LJ

;uiIL,lJ I "::"'l.::L! JJ
I.nL.u ...:..ll.oJ I j.!5 jO
KIng Salman Cent....For Disability Research
Sdonc;o 80nCtfftlngPoop..

u,uU-J1 ~

___ ~".~df'q,St..

ro--&-c-

PROJECT
.tel&Fumished A artments DQ, Ri adh

Ref. No.:

1MI S I - I A 121 2 I 2 I 3 I

o Architectural

o Electrical
o Mechanical

New Submittal

o Resubmittal

Date:
Civil

Furniture/Equipment

Specs.No.

InteriorDesign

Others

Drwg.No.

Manufacturer

Supplier

11400

No. of Catalogue/Sample

Location: 81.03.00 - Full Scope Laundry


Code: 81.03.1.6

Description (Manufacture, Model, Type, Size, Colour, etc.)

Catalogue

0 Drawing

0 Sample

Certificate

Calculation

d-

Document

Having checkedthis submittal,we certify that it confirms to the requirementsof the Contract Documentsin all respects,
except as otherwiseindicated herein (
Material Engineer/Name& Signature:

<

)1\=
~

Project Manager/Name& Signature: -h41L-----

Receivedby:
Date

Status

Name & Si natureof Consultant

Revise & Resubmit,Wor\<shall not proceed

Rejected- Resubmit

No Action

ConsultantHead Office

Date

Name & Signature

MEP

COMMENTS:

1. Contractor shall comply with the following:


a) Power supply 3 Phase system: 380/400 V, 60 HZ.
b) Power supply 1 Phase system: 220/230 V, 60 HZ.
2. If the electric load of the alternative proposed equipments exceeds the load as
specified

in the contract,

Ridco shall bear the responsibility

to fulfill

the

requirements at no extra cost or time implication.


3. The contractor should coordinate the connection of mechanical services with
the approved equipment

models and reflect the changes if required

on the

associated shop drawings before execution.


4. We expect proper installation

details of all approved

equipments

before

execution of associated services.


5. The contractor is responsible to rectify any deviation at no extra cost or time
implication .~ __

------------_

Material Sheet Submittal

Project: RADISON BLUE HOTEL


Consultant: OMRANIA & ASSOCIATES
Main Contractor: RlDCO
KIT. Contractor: PRO-KITCHEN

Material:

MSS # 133

Brand:

ELECTROLUX
.,,/

Model:
~/'

FPA1:' WC(F3LA)

//
/

1. Equipment Location

./'

LAUNDRY Equipment

2. Cataiogues

8) Eledrolux

PROFESSIONAL LAUNDRY

Laundry Presses - Air operated


FPA1-WC, FPA2-WC, FPA3-WC

/"

-:

Features and benefits

Main options

High temperature stainless steel polished head dries


the fabric and gives it a flat finish

Integral steam boiler - 9 kW

High pressure achieves an excellent finish

Electric steam iron

Adjustable pressure regulator for pressing different


fabrics achieves an excellent finish

Safety head guard (CE) improves operator safety

Air operated reduces operator fatigue and allows


high production output
Two button closing improves operator safety
High quality padding and cover for buck reduces
Impressions
Easyinstallation and operation due to no vacuum
needed and therefore no pedal

Integral air compressor

Adjustable release timer simplifies the operation and


ensures consistent results
Water spray gun with support and condenser

B) Eledrolux
Electrical

c:onnections

Standard

Optfonal
BullH.. boIl"r

BUilt-inalr
~mp;

EleCti1c steam

Voltaqe, standard
208-240V 1 AC 50/60 Hz

kW (A)

0.8 (6)

kW (A)

9 (25)

0.75

15
700
20
15

15
700
20
15
10
700

Voltage, built-in boiler


23lV 3 AC 50/60 Hz

Stearn, air and vacuum connection


DN
kPa
kg/h
DN
DN
kPa
lImin

Steam
Rec. steam pressure
Steam consumption
Condensate
Compressed air
Rec. air pressure
Air consumption

15
700
20
15
10
700
6 l/cycle

10
700

Utility shape
FPA1-WC shown

I~

Shipping' data
net, kg
crated, kg
Dimensions

326
356

46
46

In mm

+ 46
"[,6

6
6

Utility/legger shape
FPA2-WC shown

A Width
B Depth
C Height
D

1250
920
1250
1450
800
1030
1190
360
220
[,70
205
520
260
1490

E
F

G
H

I
j

L
M
N
1

+
+

1250
920
1250
1450
800
1030
1190
360
220
[,70
205
520
260
1[,90

4 Condensate

Control panel

1250
920
1250
1[,50
800
1030
1190
360
220
[,70
205
520
260
1[,90

1250
920
1250
1[,50
800
1030
1190
360
220
470
205
520
260
1490

R=690

a
I. .1 R~J;
L

W00163
Mushroom shape
FPA3-WC shown

7 Boiler drain (built-In boiler)

5 Compressed air

2 Electrical connection
3 Steam connection

6 Water supply (built-in boiler)

A
N

~~
.0

II

II
~1

...

F
E

3,4

<i
JJ

W00158

'0
c

,/

W00159

'5
0

WOO160

l"

::1;

0.

www.eleciroll.ll(.com/professional
Share more 01 our thinking at www.elecrrolux.com

~
~
~

..

.@ :c2
j .2'
co
0: =.,
~
~
z e
(j

:{

3.

Specifications

ITEM N.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BORROW

B1.03.16

I~lementation

FINISHING PRESS

in accordance with I?reliminarr observations.

wigfitnetto: 300Kg; High temperature polished


head, dries the fabric and gives it a flat
finish; High pressure, achieves an excellent
finish; Air operated, reduces operato
at' ue; added buck, reduces im ressions

-...

It

Price:
B1. 03 .17

Stationary Packing Machine

Stationary Packing Machine wall mounted unit


with pulse-dividing packing in polyethylene
film. Incl. packing tape - roll of 500 m
The manual floor welding unit enhances the
basic unit with a comprehensive transport
protection mechanism which prevents soiling
through articles falling to the ground or
slippage of the film. The floor welding unit
can be adjusted to suit the length of
the clothing item.
planned
Width x Depth x Height:
810
x 570
x 2030

offered
W
D

.......

Manufacture:
Hawo
(or equivalent)
Type:
HP630KST
Price:
B1.03.18

INDUSTRIAL IRONER

Implementation in accordance with preliminary observations.


Main specifications: Capacity, max. water evaporation: 59/h;
Cylinder, diameter (electricity): 479mmi length:
3170mm; Ironing speed: 1,5-9m

[ I

VALUE

W;IProjeklel20121k 12085 Radisson Stu Residence RiyadhlOBLPh7\LeistungsverreichnisIOOCIKI20B5_ TenderJaundry _equipmenldoc

I
- PAGE 12 from 15

4.

Compliance Statement
-:

~"'

..
'"E

c:

"'
,gz

~>>->->->->-

>-

>-

'4:

X_J
:::Je')
_J u..

0(3

g:3:

(.)~

w
_Ja..
Wu..

0
..
Z_J

0:::0

coO

IW

::I:
t/')

o
t/')

ii:

~
Q.
:!i!

o
o
t/')

.J

ii:

-....
c:

"

a.

til

~
:!i!

.s::
u

CONSULTANT

CLIENT

CONTRACTOR

Omrantaui IJ.O.C

iUiLc.,u1 t.:::.J ~jJ

~~
Lil.ol-au

...:.ll4J1 j.5}O

KJng salman Gentef" For DISability


Sclence Be.nefitJng P'eopl& \,).LIl.1.......J1
~

Research
~

PROJECT

Ref. No. :

o Architectural

o Electrical
o Mechanical

New Submittal

o Resubmittal

Date:

Civil

Furniture/Equipment

Specs. No.

Interior Design

Others

Drwg. No.

Manufacturer

Supplier

11400

No. of Catalogue/Sample

Code

~/

UNDRY

p~~S

~LUX

Model: FPA6-WC
Location:

81.03.00 - Full Scope Laundry

Code: 81.03.13

Description: (Manufacture, Model, Type, Size, Colour, etc.)

D Drawing

Catalogue

D Sample

Certificate

Calculation

Document

Having checked this submittal, we certify that it confirms to the requirements of the Contract Documents in all respects,
except a, otherwise indicated herein (
Material Engineer/Name & Signature:

z::::

,~

Project Manager/Name & Signature :

-~-?//k:..,..c.,~~---

Received by:
Date

Name & Si nature of Consultant

Remarks / Comments:

Approved

Revise & Resubmit, Work shall not proceed

Approved as noted

Rejected - Resubmit

Consultant Site Office

No Action'

Consultant Head Office

MEP

COMMENTS:

1. Contractor shall comply with the following:


a) Power supply 3 Phase system: 380/400 VI 60 HZ.
b) Power supply 1 Phase system: 220/230 VI 60 HZ.
2. If the electric load of the alternative proposed equipments exceeds the load as
specified

in the contract,

Ridco

shall bear the

responsibility

to fulfill

the

requirements at no extra cost or time implication.


3. The contractor should coordinate the connection of mechanical services with
the approved equipment

models and reflect the changes if required on the

associated shop drawings before execution.


4. We expect proper installation

details of all approved

equipments

before

execution of associated services.


5. The contractor is responsible to rectify any deviation at no extra cost or time
implication.

~.

.,.

Material Sheet Submittal


Project: RADISON BLUE HOTEL
Consultant: OMRANIA & ASSOCIATES
Main Contractor: RIDCO
KIT. Contractor: PRO-KITCHEN

Material:

LAUNDRY PRESS
MSS # 134

Brand:

ELECTROLUX
Model:

FPA6-WC

LEqUiPment

Location

LAUNDRY Equipment

2. Catalogues

8) Eledrolux

PROFESSIONAL LAUNDRY

Laundry Press Air operated collar and cuff


FPA6-WC

Features and benefits


High temperature polished head, dries the fabric and
gives it a flat finish
High pressure, achieves an excellent finish
Adjustable pressure regulator, for pressing different
fabrics
Air operated, reduces operator fatigue
Safety two button closing, improves operator safety
Padded buck, reduces impressions
Adjustable release timer, simplifies the 'operation and
ensures consistent results

Main options
Facilitiesthat simplify the installation
- Integral air compressor
- Integral steam boiler

Electrical connectf~

~~-~
208 240

standard

,
al boiler
1 AC 50/60 Hz

-,
)kW

Voltage, internal boiler


208-240V 3 AC 50/60 Hz
400-415V 3N AC 50/60 H

kW
kW

r-,

Sullt-in
boiler

8) Eledrolux

Built-in
air cornp,

0.2

1.1

all 8.4

lOA
12.10

15.4
18.4

Steam, air and vacuum connection


Steam
Rec. steam pressure
Steam consumption
Condensate
Compressed air
Rec. air pressure
Air consumption
Boiler drain (Internal boiler)

DN
kPa
kg/h
DN
DN
kPa
IImin
DN

15
600
12-13
15
10
700
50

15
600
12-13
15

15
10
700
50
15

50

Shipping data
net, kg
crated, kg
boxed, kg

300
360
[,40

300
360

[,L,O

300
360
440

970
1135
1220
1530
1070
780
445
190
150
505

970
1135
1220
1530
1070
780
445
190
150
505

970
1135
1220
1530
1070
780
445
190
150
505

300

300

0~0
/
\ \R
leo
1--1
----II
kl I. .1
~60~

= 290

~60~

0
5265

Dimensions in mm
A Widlh
B Depth
C Heighl

0
E
F

G
H
I
K

l
1 Conlrol panel
2 Electrical connection
3 Steam connection
4 Condensate

300
5 Air connection

6 Boiter drain (Internal boiler)


7 Water supply (internal boiler)

Front

5267

5267 A

Rear side

'"g"

5260

&
~

Left side

"

~
~

www.electrolvx.com/professlonal

~ .l!
;;;
~ E
:c
~ .go
'"
0:
'" ~
:ll ~
d 51
~
~ it'"

..
2;

Shale more ot our thinking at www.eleclrolvx.com

3.

Specifications

ITEM N.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BORROW

planned
Width x Depth x Height:
620
x 1020 x 1575

offered
W
D

.......

Manufacture:
ELECTROLUX
(or equivalent)
Type:
FFT-WC
Price:
Bl. 03 .12

HOSENTOPPER

Implementation in accordance with preliminary observations.


FINISHING LAGOON SYSTEM
Steam, air and vacuum connection: Steam 15 ON; Steam
consumption 15-20kg/h; Rec. steam pressure 500-600kPa;
Condensate ISDN; Compressed air 8DN; Air consumption
401/min; Air pressure 600-700kPa. 2HP motor; Manual
waist size adjustment; Manual leg size adjustment,
Adjustment for steam, air and steam heater devices,
Anti-stretching device on waistband and legs for the
ironing of elastic trousers
planned
Width x Depth x Height:
885
x 905
x 2025

offered
W
D

.......

Manufacture:
Electrolux
(or equivalent)
Type:
FTTI
Price:
B1. 03 .13
I~lementation

r
in

w' ht netto: 300Kg; High temperature polished head,


ries the fabric and gives it a flat finish; High
pressure, achieves an excellent finish; Air
operated, reduces operator
fat! ue' Padded buck, reduwc~e-s-_~~~'-m~-~-~~~
boiler to serve FPA6-WC and FSF

Height:
x 1220
Manufacture:
Electrolux
(or equivalent)

I I

VALUE

W:\Projekte\ZO I21k12085 Radisson Stu Residence Riyadh\O~ lP6 7Ileistungswlzeichnis\DOC\Kl 2085_ Tender_!aundry _ eQuipment.doc

I
. PAGE 10 from 15

ITEM N.

QUANTITY DESCRIPTION

UNIT PRICE

LUMP SUM PRICE

BDRROW

FPA6-WC

~:

Price:
B1.03.14

SHIRT FINISHER

Imp~ementation in accordance witb pre~iminary


Shirt Finisher, steam heating
- Pneumatic shoulder - size setting
- Base module -for shirts, blouses, jackets,
dustc.oatsetc.
- Front clamp, collar clamp, pneumatic sleeve
tensioners, Veit Hand Finisher model 2157,
with hand guard and Teflon hose, conne.ctionsfor
power supply and steam supply. Stem consumption: 2,2kg /hour
- Holder with support stand for Hand Finisher
- Installation Set

..

planned
Width x Depth x Height:
1745 x 950
x 1700

offered
W
D
.......
x

H
x

Manufacture:
ELECTROLUX
(or equivalent)
Type:
FSF
Price:
B1.03.15

IRONING BOARD

Implementation in accordance with

shape plus
planned
Width x Depth x Height:
1390 x 490
x 1075

offe.red
W

.......

Manufacture:
Electro1ux
(or equivalent)
Type:
FITI-WC
Price:

I I

VALUE

W:\Projekte\lOl Z\k1ZOB5Radisson Blu Residence Riyadh\08 lP67\leistungsverzeichnis\i)OC\Kl Z085_lender_laundry_equlpmenldot

I
PAGE 11 from 15

4.

Compliance Statement

Ii>

~z
~>= >-

>- >- >- >- >-

>-

>-

X
::>()

o~

0::'
1-<0
()

wfr
...J

W" ...J

.. uJ
00

Zo
~~
CD

X
::>0

o~

0::'
1-<0

()rf
wu..

~
u..
X
::::I

I-

W
W

::x:
en

o
en

ZO

<{o

ill

o::~

(i)

CD

C/)

0::

a..

>0::
o

:E

::>

o
o

OW

Q)

~
ct

0..

...J
W..:_j

eo

z
~

en
...J

ct
~
w
~

:E

You might also like