You are on page 1of 5

CONSTRUCTION REQUISITION FOR FABRICATION

REV

PROJECT

POSCO
PLANT

OWNER

PT. KRAKATAU POSCO

LOCATION

CILEGON - BANTEN

First issued for


approval
DESCRIPTION

KRAKATAU

STEEL

30/10/08

RNL

RRK

WEN

DATE

DESIGN

REVIEW

APPROVE
D

COKE

Sheet : 2 of 5

CONSTRUCTION
REQUISITION FOR
FABRICATION

Rev.
Date

:0
: 19/02/11

Doc.No.: 2707

REVISION HISTORICAL SHEET


REV. NO.

DATE

19/09/11

DESCRIPTION
First issued for approval

Sheet : 3 of 5

CONSTRUCTION
REQUISITION FOR
FABRICATION

Rev.

:0

Date

: 19/02/11

Doc.No.: 2707

PAGE REVISION
Revision
Page
No.

CONSTRUCTION
REQUISITION FOR
FABRICATION

Sheet : 4 of 5
Rev.
Date

:0
: 19/02/11

Doc.No.: 2707

CONTENTS
SCOPE OF WORK

1.1.

SCOPE OF WORK

2.1.

DESCRIPTION OF WORKS

CONSTRUCTION
REQUISITION FOR
FABRICATION

BAB I

1.1.

Sheet : 5 of 5
Rev.
Date

:0
: 19/02/11

Doc.No.: 2707

SCOPE OF WORK
SCOPE OF WORK
Scope of work of this project for POSCO KRAKATAU STEEL COKE PLANT

2.1.

DESCRIPTION OF WORKS
Fabrication of Steel Structure as follows:
1. Shop Drawing
2. Fabrication
3. Transportation (supply on site)

2.2.

ATTACHMENT
1. Bill of Quantity
2. Drawing
3. Specification of fabrication

You might also like