Zawtika Project: Blocks M9 and M1

26 September 2013

1. Prepare a field development plan for the Zawtika Project (blocks M9


and part of M1 in Myanmar).
2. Currently, the project has completed exploration and assessment, and
is under development.
3. Your plan is intended as the initial plan for a green field, and will be
used to approach the partner (and government) for money and revenue
sharing.
4. Each of you has a particular expertise. Lets assign project responsibilities at our next class meeting. You will not be responsible for
expertise not represented in the class.
(a) Win (civil engineer)
(b) Film (installation and design)
(c) Aod, Aung and Thaw Tar (naval architecture)
(d) Sidd (mechanical engineering)
(e) Sompong (management and finance)
(f) Abraham and Madada (structural design)
(g) Samuel (leftover from last year: reservoir engineering and production)
5. Grading. Both written and oral reports are to be delivered. Please
note that last years report was inconsistent and lacked continuity
among the sections. I urge you to spend time co-ordinating your efforts
so as to make your plan a coherent plan that is acceptable to everyone.
Following on from the handout of 7 September 2013, you are responsible
for the global aspects of development.