Professional Documents
Culture Documents
Ben 3proj3 Rev
Ben 3proj3 Rev
FlaringaTube
101406
BenjaminLeisso
Flaring(partthatspreads)atubeisanimportantskillthatallHVAC(heating,venting
andairconditioning)peoplemustknowhowtodo.Itisaneasymeansofattaching
varioustubestogethercommontotheHVACfield.
Theprocedureincludesafewdifferenttypesofequipmentwhichincludesatube,tube
cutter,reamerandaflaringtool.Thisequipmentnomatterthebrandisall similarin
nature.Theyalldothesamething.Whentheseitemsareusedinaspecificway theend
resultwillbeaflaredtube.
Preparing
DetermineWhatsNeeded
Atechnicianwillselectthetypeoftubeheneedsneed(Fig.1)and
properdiameter.(Fig.2)
Fig.1
Imageobtainedfrom
http://www.diynetwork.com/diy/cda/article_print/0,1983,DIY_14190_2270
855_ARTICLEDETAILPRINT,00.html
Fig.2
Imageobtainedfrom
http://discover.edventures.com/images/termlib/d/diameter/support.gif
Measure&Cut
Thetechnicianwilldetermineandmeasureandmarkthelengthwitha
marker.(Fig3),Hewillthenplaceatubecutter(Fig.4)overthemark
andturntheknobuntilthecuttingwheelslightlytouch(Fig.5)themark.
Thecutterwillberotatedaminimumofoncearoundthecircumference
ofthetubetopreventanunevencutting.Theknobwillbeturnonce
againandberepeateduntilthetubeiscut.
Fig.3
Imageobtainfrom:
http://www.copper.org/applications/plumbing/techref/cth/images/figure10
new.jpg
Fig.4
Imageobtainfrom:
http://www.germes
online.com/direct/dbimage/50217518/Tube_Cutter.jpg
Fig.5
Imageobtainfrom:
http://www.sweethaven02.com/BldgConst/en5112a0039.gif
Ream
(Fig.6)Aninner&outerreamer(rotatingfinishingtoolwithsharp
cuttingedgesusedtoshapeahole)willthenbeusedtoremovethe
burs(sharpthinridgearoundthecut)tohelppreventcrackingonthe
endofthetube.Thetechnicianwillinserttheendofthepieceonthe
endsofthereamer.Thereamerwillberotatedonbothsidesandturned
untilallbursareremoved.Oncecompleteditsreadyforflaring.
Fig.6
Imageobtainfrom:
http://cgi.ebay.com/RefcoRFA209INNEROUTERREAMERHVAC
PLUMBER
TOOLS_W0QQitemZ250034516629QQihZ015QQcategoryZ66999QQc
mdZViewItem#ebayphotohosting
MakingTheFlare
Setup
(Fig.7)Thetechnicianwillnowinsert thereamedpiece1/8passthe
topedgeontheflaringblock,insuringtheendtobeflaredisonthe
angledsideoftheblock.Thewingnutsareturnedcounterclockwisefor
ittobeeasilyinserted.Onceplacedinthehole,thewingnutswillbe
turnedclockwisesecuringtheassembly.
Thetechnicianwillnowattachthesliponyoketotheflareblock.Once
placedontheblockandflareconeisalignedtheoverthetube,the
handleisturnedclockwiserotatingthefeedscrewdownforcingtheflare
conedowntothetube.Hewillstoponceitisitisjusttouchesthetube.
Asaresultofthisthesliponyokeissecured.
Fig.7
Imageobtainfrom:
http://www.sears.com/sr/javasr/product.do?BV_SessionID=@@@@006
9002929.1160869135@@@@&BV_EngineID=cchiaddjdjjiekkcefecemldf
fidfmm.0&sid=I0080602410004900085&pid=00951255000&vertical=SEA
RS&ihtoken=1
ConfirmingSetup
Thetechnicianwillverifyandrecheckthesetup.Thewingnutswillbe
checkedtopreventslippingofthetubeandanyotherproblemsthatmay
occur.Onceconfirmedthetechnicianwillcontinued.
MakeFlare
Thetechnicianwillnowsecurelyholdoftheflareblockwithonehand
andfirmlyturnthehandlewiththeother,untilitwillnolongerturn.Asa
resultaflareismadeontheendofthetube.(Fig.8)
Fig.8
Imageobtainfrom:
http://www.copper.org/applications/plumbing/techref/cth/cth_8flrdjts.htm
RemoveEquipment
Thetechnicianwillturnthehandlecounterclockwiseuntiltheslipon
yokeisdetached.Thewingnutswillbeloosenedandthepieceisable
toberemoved.
Checking
Note:(Ifanyflaredoesnotpassanyofthecheckingitisbadandmustbe
replaced.)
VisuallyInspect
Oncetheflarepieceisremovedthetechnicianwillvisually inspectthe
flare(Fig.9)forsignsofcrackingorsplitting.
CheckWithFlareNut
Thetechnicianwillalsoslideaflarenut(Fig.9)onthetubefromthe
othersideandchecktomakesureitswillrotatefreelyandtheflareisnot
toobig.
Fig.9
Imageobtainfrom:
http://www.copper.org/applications/plumbing/techref/cth/cth_8flrdjts.htm
CheckWithFitting
Thetechnicianwillmakecertainwithonelastcheck.Hewillplacethe
flareonaflarefitting(Fig.10)tomakesureitwillworkcorrectly.
Fig.10
ImageObtainFrom:
http://www.copper.org/applications/plumbing/techref/cth/cth_8flrdjts.htm
ReadyForUse
Onceallthechecksarecompletedandpassedtheflareisnowreadyfor
use.Aproperlymadeflarewillinsurethattheairconditioningsystemwill
befreefromleaksatthejoints.(Fig.11)
Fig.11
Imageobtainfrom:
http://www.copper.org/applications/plumbing/techref/cth/cth_8flrdjts.htm