CE 326

Homework Assignment #1

2017

Due: Tuesday, Jan. 17


1.

Work problem #1-5 (Discussion) from page 21 of the textbook.

2.

Work problem #1-1 (FE problems) from page 23 of the textbook.

3.

Estimate the following for a treatment plant from a community of 12,000:


(a) average hourly wastewater flow rate
(b) peak hourly wastewater flow rate, and
(c) influent BOD5 mass loading (lb/day).
Assume that the peak hourly flow rate is determined using historical peak flow
measurements, which are 3.2 times the average flow rate. Assume an average per
capita wastewater flow rate of 100 gal/capita-day and a typical BOD 5 loading of 0.21
lb/capita-day.