You are on page 1of 31

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60F TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C 18.67 18.372 15 94 Nil 0 94 30.9 87.6 44.5 0.98625 93 0.033 93 0.12551


2C 1.29 1.002 5,940 37,365 17.911 17.621 88.192 555 36,810 33.2 91.8 44.5 0.98415 36,226 18.113 36,208 0.12551
3C 4.26 3.964 5,599 35,217 Nil 35,217 33.8 92.8 44.5 0.98365 34,641 34.641 34,606 0.12551
4C 11.69 11.399 2,614 16,444 Nil 16,444 33.3 91.9 44.5 0.98410 16,182 16.182 16,166 0.12551
5C 17.69 17.396 200 1,258 Nil 1,258 32.4 90.3 44.5 0.98490 1,239 0.434 1,239 0.12551
6C 16.78 16.485 545 3,430 18.136 17.847 22.839 144 3,286 32.2 90.0 44.5 0.98505 3,237 1.62 3,235 0.12551
7C 3.63 3.334 5,865 36,888 18.100 17.811 39.014 245 36,643 32.3 90.1 44.5 0.98500 36,093 36.093 36,057 0.12551
8C 5.64 5.351 4,501 28,309 18.360 18.073 23.648 149 28,160 32.3 90.1 44.5 0.98500 27,738 27.738 27,710 0.12551
SL.P 11.12 10.809 238 1,496 13.430 13.124 163.401 1,028 468 31.6 88.9 44.5 0.98560 461 0.692 461 0.12551
SL.S 17.28 16.964 38 238 Nil 238 32.3 90.1 44.5 0.98500 235 0.352 235 0.12551
TOTAL
TOTAL 25,555 160,738 337 2,120 158,619 156,147 156,010
REMARKS: 928 71 857 843 843

PRODUCTION LOADING INTO COT 6C

Gross Volume :(T.O.V.) 160,738 Oil Volume @ 60 F :(T.C.V.) 156,147 DRAFT FWD 9.00 m AFT
Less Free Water : 2,120 Less OBQ/ROB :
Oil Volume :(G.O.V.) 158,619 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 156,147 Long tons/Metric tons :
Long Tons/Metric Tons : 19,598 19,912 Vessel Experience Factor :
API 60 F : 44.5 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.05 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 8-Dec-16

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

11.687 0.12752 11.874


4,546.781 0.12752 4619.596
4,347.777 0.12752 4417.406
2,031.017 0.12752 2063.543
155.510 0.12752 158.000
406.260 0.12752 412.766
4,530.084 0.12752 4602.632
3,481.401 0.12752 3537.154
57.918 0.12752 58.846
29.483 0.12752 29.955

19,598 19,912

10.00 m TRIM 1.00 m


LIST NIL

Capt. Boy R. Togas


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 8-Dec-16 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Saiful Bah

Crude Storage Lifting

24 Hours Total (bbls) 928 Last Lifting 29-O

BS and W % 0.05 Lifting Vol (bbls) 60,5

Storage Gross (bbls) Next Lifting


158,619

Storage Net / G.S.V (Nbbls) 156,147 Next Lifting Vol (bbls)

Storage Net / N.S.V (Nbbls) 156,010

Days to Tank Tops 177 Vessel ETA

Total Crude This Month (Nbbls) 156,147

Water Offtake

Water Received 24hrs (bbls) 71 Offtake 24 Hours (bbls)

Total Water in Cargo (bbls) 2,120

Total P/W Received (bbls) 81,601

Water Drawn off (bbls) 0 Loading/Incoming Temp 40.0

Specific Gravity 0 Storage tanks's temperature 32.2

PFW PH 0
Note: PRODUCTION LOADING INTO COT 6C
OIW Average (mg/I) 10

OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0.00 0

Non Metal Waste 0.00 0

Metal Waste 0.00 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0.00 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0

Note :
OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 270,112 ### 22,371 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 0 1,324

Closing (m3) 270,112 21,047 0

Supply Remaining (days)

Remarks :

Meetings

Type Time Comment

1. Reviewed previous day activity


2. Maintenance Export Hose
3. Check Tool Box Equipment
4. Release and shifted export hose to Port Bow
5. Repair Drain Pipe In Air Conditioner Room
6. Cleaning Air Condition Condensor Tube
7. Maintenance Auxiliary Engine No.2
8. Maintenance Emergency Fire Pump
Tool box meeting 06.30
9. Maintenance Portable Compressor No.1 & 2

1. Review deck, engine and galley dept. activity


2. De bottoming pruduce water
3. Internal transfer cot
Supervisory Meeting 16.30 4. Heating cargo tank nomination for off take
5. crew change
6. house keeping

Incidents
Type Reference Comments
NIL

Drills
Type Time Comment

S.T.O.P. Audit program

Observation Card Report : 23


The details see SPKK sheet *)
###
Capt. Saiful Bahri

29-Oct-16

60,545

deg C

deg C

O COT 6C

3255 / 156214
e Vessel

Comment

Port Bow
Room
ube

No.1 & 2

t. activity

ke
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C

Mooring/Unmooring :
17.12: AHT. Tegap Jaya Starboard Alongside
21.20: AHT. Tegap Jaya Cast Off
21.30: Adventure 1 Starboard Alongside
24.00: Adventure 1 Cast Off

Bunkering/Debunkering :
17.20: Commenced Transferred Fresh Water to AHT. Tegap Jaya
21.10: Completed Transferred Fresh Water 30T to AHT. Tegap Jaya
21.40: Commenced Transferred Fresh Water to Advemture 1
23.50: Completed Transferred Fresh Water 15T To Adventure 1

Personnel & Material Transfer :


05.30: 6 Persons Gearindo & 9 Persons PKP by. KST. 51 ( Out )
08.30: 1 Person Santos Rep by KST. 51 ( Out )
10.10: 2 Persons PKP by KST. 51 ( In )
15.30: 2 Persons PKP by KST. 51 ( Out )
16.00: 6 Persons Gearindo & 7 Persons PKP by. KST. 51 ( In )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist transferred SPJ Santos Rep & Contractor Personnel
2. Continued maintenance Export Hose
3. Final Coating COT 8C Area
4. Released and shifted export hose to Port Bow
5. Marking label in pump room
6. Preparation for de bottoming pw & internal transfer cot
7. House Keeping

ENGINE :
1. Repaired Drain Water Pipe In Air Conditioner Room
2. Cleaned Air Condition Condenser tube
3. Maintenance Auxiliary Engine No.2
4. Maintenance Emergency Fire Pump
5. Checked Condition Portable Compressor No.1 & 2
6. Running up A/E No.1 and 3 for :
16.00 - 18.00: - Release Export Hose To KST. 51

2. PERMIT TO WORK PW MW HW CSE IP VAL


425 1575 372 163 7 876
2.1 J HA 425 1575 372 163 5 876
3. BUNKERS(M3) CONS RCVD
M.F.O 0 0
M.D.O 1,324 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 0 0 0 0
DOM 10 0 53 29
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
15 18
MAN HOURS ( POB X 12 HRS )
Previous man hours 203340 Days W/O LTI 1106 Since 28-Nov-13
Man hours today 288
Total man hours 203628
Safe man hours 203628
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


08-Dec-16 @2400 HRS

TOTAL
3418
3416
TRANS ROB
0 270,112
0 21,047
ROB `
85
215
ROB
200
POB
37

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1546 2 1548
2065 23 2088
3 0 3
0 0 0
1389 0 1389

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Dec-16

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 31,555 0 0 1,338 0 3.0 12.0 9.0 30,217
02 30,217 0 0 1,324 0 16.0 0.0 8.0 28,893
03 28,893 0 0 1,296 0 19.0 0.0 3.0 27,597
04 27,597 0 0 1,310 0 24.0 1.0 0.0 26,287
05 26,287 0 0 1,296 0 24.0 0.0 0.0 24,991
06 24,991 0 0 1,296 0 24.0 0.0 0.0 23,695
07 23,695 0 0 1,324 0 18.0 0.0 6.0 22,371
08 22,371 0 0 1,324 0 2.0 0.0 24.0 21,047
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Dec-16

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 270,112 0 0 0 0 270,112
02 270,112 0 0 0 0 270,112
03 270,112 0 0 0 0 270,112
04 270,112 0 0 0 0 270,112
05 270,112 0 0 0 0 270,112
06 270,112 0 0 0 0 270,112
07 270,112 0 0 0 0 270,112
08 270,112 0 0 0 0 270,112
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 11 12 12 11 10 14 11 12 13 11 11 14
2 10 10 12 13 10 12 12 11 12 13 11 12
3 14 14 13 11 12 13 11 13 11 12 12 12
4 13 13 12 14 11 11 13 12 14 11 11 13
5 12 11 11 12 13 13 12 11 11 12 12 12
6 11 13 13 12 13 11 11 12 13 12 11 13
7 14 14 13 10 14 12 11 10 14 13 12 11
8 13 12 12 10 14 12 12 10 12 11 11 12
9 10 13 14 11 13 13 12 12 13 12 12
10 11 14 14 14 13 11 11 13 11 12 13
11 11 14 14 13 12 12 13 14 13 11 10
12 14 12 13 13 14 12 12 11 14 13 14
13 10 13 14 11 11 11 11 11 13 12 12
14 10 14 13 11 11 12 12 12 11 12 12
15 12 13 14 12 13 13 13 13 12 11 13
16 13 14 12 12 13 14 13 12 12 11 13
17 10 11 14 11 14 14 11 14 11 13 11
18 11 13 14 14 14 11 13 11 14 12 11
19 12 12 12 13 12 11 12 13 12 11 13
20 14 11 13 13 11 12 13 14 11 12 10
21 10 13 12 12 14 11 12 12 14 11 10
22 12 12 13 12 12 11 12 11 12 12 12
23 11 12 14 14 12 13 10 13 14 11 12
24 12 14 12 11 10 11 10 12 11 13 13
25 14 13 11 12 11 14 11 14 13 12 13
26 13 14 13 12 13 12 11 13 12 13 12
27 12 12 10 11 14 12 12 14 12 13 14
28 14 11 12 11 13 11 12 12 11 13 13
29 12 14 11 13 11 12 11 13 11 12 12
30 14 14 12 13 12 12 14 12 11 14
31 13 12 12 11 12 12

TOTAL 373 368 393 361 383 363 363 381 369 370 360 99
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 7 8 8 7 7 8 8 8 7 7 7 8
2 8 7 8 7 7 8 8 8 7 7 7 8
3 8 8 8 8 8 7 8 7 8 8 8 7
4 7 8 8 8 8 8 7 8 7 8 7 8
5 8 8 7 8 8 8 8 8 7 8 7 8
6 8 8 8 7 7 8 7 8 8 7 8 8
7 7 8 8 7 8 7 8 7 8 8 7 7
8 8 7 8 8 8 8 8 7 8 7 7 8
9 8 8 8 7 8 8 8 7 8 8 8
10 8 8 8 8 7 7 7 5 7 8 8
11 8 8 8 8 8 8 8 6 8 8 7
12 8 8 8 8 8 8 8 8 7 7 8
13 7 8 7 7 8 8 8 7 8 8 8
14 8 8 8 8 7 8 8 8 7 8 8
15 7 8 8 8 8 8 8 7 8 7 7
16 7 8 8 8 8 8 7 8 8 7 8
17 8 7 8 7 8 8 8 7 8 8 8
18 8 8 8 8 8 7 8 8 7 8 7
19 8 8 8 8 7 8 8 8 8 7 7
20 8 8 7 7 8 8 8 7 8 8 7
21 7 7 8 7 8 8 8 7 8 8 7
22 8 8 8 8 7 8 7 8 7 8 8
23 8 8 8 8 8 8 7 7 8 7 8
24 8 8 8 7 7 7 7 8 8 8 8
25 8 8 8 7 8 8 8 7 8 8 7
26 8 8 7 8 8 8 7 7 7 8 8
27 7 8 7 8 8 8 8 8 7 8 8
28 8 7 7 8 8 7 8 8 7 8 8
29 8 8 8 7 7 8 7 8 7 8 7
30 8 8 7 8 8 8 7 8 7 8
31 8 8 8 8 8 7

TOTAL 240 227 242 227 239 234 239 230 227 237 226 62
LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,952 4,977 4,963 4,977 4,942 4,980 4,969 4,951 4,979 4,943 4,977 4,978
2 4,938 4,956 4,971 4,945 4,981 4,975 4,974 4,941 4,951 4,982 4,976 4,981
3 4,973 4,962 4,969 4,952 4,975 4,982 4,970 4,962 4,983 4,976 4,978 4,964
4 4,961 4,971 4,967 4,961 4,965 4,968 4,977 4,961 4,962 4,966 4,975 4,959
5 4,946 4,968 4,970 4,988 4,931 4,972 4,969 4,975 4,945 4,962 4,972 4,980
6 4,927 4,955 4,972 4,959 4,929 4,975 4,965 4,972 4,971 4,965 4,973 4,956
7 4,938 4,962 4,968 4,935 4,942 4,973 4,968 4,952 4,939 4,972 4,971 4,967
8 4,981 4,966 4,977 4,964 4,983 4,969 4,971 4,938 4,983 4,975 4,970 4,979
9 4,972 4,959 4,975 4,972 4,957 4,968 4,970 4,944 4,962 4,969 4,971
10 4,963 4,957 4,968 4,951 4,975 4,977 4,968 4,981 4,955 4,975 4,952
11 4,959 4,963 4,973 4,974 4,981 4,975 4,972 4,965 4,982 4,970 4,967
12 4,945 4,968 4,975 4,967 4,939 4,969 4,971 4,976 4,952 4,965 4,978
13 4,937 4,961 4,972 4,931 4,968 4,971 4,974 4,960 4,984 4,971 4,945
14 4,962 4,966 4,969 4,925 4,975 4,975 4,969 4,969 4,929 4,973 4,981
15 4,976 4,971 4,970 4,982 4,952 4,970 4,972 4,975 4,955 4,977 4,962
16 4,948 4,967 4,968 4,943 4,981 4,982 4,970 4,959 4,972 4,970 4,936
17 4,952 4,959 4,966 4,954 4,949 4,968 4,971 4,978 4,968 4,975 4,972
18 4,928 4,967 4,971 4,958 4,975 4,969 4,977 4,965 4,946 4,978 4,954
19 4,942 4,960 4,977 4,951 4,935 4,973 4,968 4,956 4,982 4,972 4,942
20 4,965 4,965 4,975 4,985 4,991 4,970 4,975 4,972 4,971 4,975 4,948
21 4,928 4,963 4,970 4,976 4,972 4,975 4,970 4,982 4,982 4,979 4,951
22 4,951 4,961 4,969 4,972 4,958 4,977 4,952 4,959 4,973 4,976 4,957
23 4,972 4,966 4,973 4,961 4,978 4,971 4,945 4,964 4,959 4,969 4,963
24 4,938 4,972 4,974 4,972 4,984 4,977 4,962 4,987 4,982 4,974 4,952
25 4,944 4,968 4,982 4,931 4,975 4,974 4,980 4,949 4,962 4,978 4,962
26 4,958 4,962 4,958 4,983 4,963 4,970 4,971 4,969 4,981 4,972 4,970
27 4,967 4,951 4,981 4,925 4,961 4,968 4,981 4,935 4,949 4,979 4,982
28 4,935 4,966 4,963 4,971 4,964 4,971 4,975 4,981 4,964 4,977 4,963
29 4,951 4,958 4,972 4,964 4,960 4,968 4,965 4,959 4,977 4,982 4,959
30 4,962 4,957 4,937 4,972 4,972 4,951 4,982 4,948 4,973 4,948
31 4,958 4,981 4,969 4,967 4,979 4,978

TOTAL 153,529 143,947 154,096 148,766 153,882 149,184 154,039 153,898 148,948 154,148 148,907 39,764
Averag
e/Day 4,953 5,141 4,971 4,959 4,964 4,973 4,969 4,964 4,965 4,973 4,803 1,283
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity R.O Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 130 65 25 140 95 50 45 30 75 95 85 100
2 30 80 90 105 60 45 50 55 95 125 120 70
3 130 125 105 140 70 50 70 90 95 90 115 100
4 40 120 35 115 55 85 80 60 125 40 90 150
5 75 125 95 135 80 65 135 50 45 65 80 155
6 40 70 120 120 120 55 70 60 60 110 130 135
7 125 100 95 125 120 115 85 85 105 90 95 125
8 100 75 115 140 125 110 110 70 130 100 60 145
9 110 85 90 70 105 115 105 80 115 100 110
10 135 85 105 135 85 120 100 120 120 55 115
11 120 65 75 120 105 115 75 75 90 50 180
12 80 105 90 155 115 120 55 80 115 45 140
13 50 110 110 60 105 80 45 75 105 140 95
14 125 90 75 100 95 95 40 65 115 155 90
15 120 60 85 70 40 145 45 45 60 105 140
16 95 95 75 60 75 75 45 90 80 105 110
17 115 80 85 80 80 40 55 140 115 65 60
18 100 95 100 110 65 60 50 130 110 70 105
19 105 100 55 120 20 125 55 140 90 145 155
20 145 95 125 125 75 135 105 105 125 140 100
21 95 85 105 120 115 145 110 130 120 85 75
22 120 100 135 115 70 85 90 65 115 100 95
23 110 70 120 100 105 75 90 80 120 135 120
24 80 50 130 95 100 80 75 125 130 125 150
25 105 25 120 60 60 115 45 110 45 95 105
26 115 70 130 115 100 55 50 120 85 105 155
27 100 70 155 115 85 40 85 125 70 90 105
28 110 75 125 110 95 45 85 130 55 130 105
29 105 95 145 65 90 55 85 100 65 80 130
30 145 135 80 75 45 30 115 125 140 140
31 100 150 70 50 80 105

TOTAL 3,155 2,465 3,200 3,200 2,655 2,540 2,215 2,825 2,900 3,080
DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Dec 2016

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Dec-2016 24 1 16 41
2-Dec-2016 24 1 19 44
3-Dec-2016 24 1 21 46
4-Dec-2016 24 0 21 45
5-Dec-2016 24 0 16 40
6-Dec-2016 24 1 17 42
7-Dec-2016 24 1 15 40
8-Dec-2016 24 0 13 37

TOTAL 192 5 138 335


SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 8/Dec/16
Action/Commen Positive /
Reported by Rank Location Description Total
t Negative

Smoking Smoking Room Side Wall and Ceiling need to be


1 BOY R.TOGAS Master Room cleaned (caused by smoke)
Informed to C/O Negative 1

Released and shifted export hose from midle waiting schedlue for
2 IYYANG C/O Main Deck
manifold to Port Bow shifting to sinker buoy
Positive 1

3 ANDI A UNIT 2/O Poop Deck Indonesia National Flag Renewal Done Positive 1

4 INDRA 3/O Pump Room Marking Label In Pump Room Positive 1

5 MARTHEN KAMMA C/E Purifier Area Engine Room LED Light In Purifier area Unlit Repaired in Progress Negative 1

6 JULY MANGIRI C/E

Starboard
7 ACO AKBAR 2/E Quarter
Maintenance Screw Compressor Positive 1
Renewed Fuel Oil High pressure Pipe for
8 RATNO SITUMORANG 3/E Engine Room
Auxiliary Engine No.2
Positive 1

9 LILIK WAHYUWANTO 4/E Engine Room Maintenance Auxiliary Boiler well done Positive 1

Emergency Fire
10 HENDRA PRATAMA 4/E Pump Room
Renewed Emergency Fire Pump Gland Packing Positive 1

Starboard
11 NIKO E/E Quarter
Refilled Screw Compressor Lub Oil Positive 1

12 A.AFANDI Bosun Main Deck Assist C/O Maintenance Export Hose Final Coating Done Positive 1

13 RISRIS RISWANTO AB Main Deck Assist C/O Maintenance Export Hose Positive 1

14 UIYANTO AB Main Deck Final coating @ main deck area COT 8C Positive 1

15 M. SAFARI AB Main Deck Assist Transfer Fresh Water To AHT. Tegap Jaya Positive 1

16 ANTONY OS Main Deck Assist C/O Maintenance Export Hose Positive 1

17 SAIFUL IMAM FTR AC Room Repaired Drain Pipe In Air Condition Room Positive 1

18 SAHONO MTM Engine Room Assist 2/E Maintenance Auxiliary Engine No.2 Positive 1

19 HAEROJI MTM Engine Room House keeping in workshop Positive 1

Accommodati Assist Electrician Maintenance Air Condition In


20 NUR ALI MTM on Accommodation
Positive 1

21 MASRUDI C/Cook Dry Store House Keeping In Dry Store Room Clean & Tidy Positive 1

22 ROCHIM COOK Galley Daily House Keeping In Galley room Clean & Tidy Positive 1

Accommodati
23 RANGGUN JAWI STWD on
House Keeping all Visitors Cabin Clean & Tidy Positive 1

24 HERIANTO SULE T STWD Deck C House Keeping In Deck C Passage Clean & Tidy Positive 1

TOTAL 23