You are on page 1of 27

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60F TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C 10.580 10.318 1,967.068 12,372 trace 12,372 31.1 88.0 43.4 0.98630 12,203 12.203 12,191 0.12630
2C 17.538 17.287 198.416 1,248 trace 1,248 31.5 88.7 43.4 0.98595 1,230 1.846 1,229 0.12630
3C 9.244 8.995 3,565.562 22,427 trace 22,427 31.5 88.7 43.4 0.98595 22,112 33.167 22,078 0.12630
4C 10.246 9.998 3,184.726 20,031 trace 20,031 31.2 88.2 43.4 0.98620 19,755 19.755 19,735 0.12630
5C 3.915 3.668 5,773.909 36,317 trace 36,317 31.6 88.9 43.4 0.98585 35,803 35.803 35,767 0.12630
6C 6.283 6.035 4,796.984 30,172 17.657 17.398 187.957 1,182 28,990 30.6 87.1 43.4 0.98675 28,606 42.909 28,563 0.12630
7C 11.401 11.150 2,699.842 16,981 trace 16,981 31.9 89.4 43.4 0.98560 16,737 16.737 16,720 0.12630
8C 8.579 8.336 3,419.882 21,510 trace 21,510 31.0 87.8 43.4 0.98640 21,218 31.827 21,186 0.12630
SL.P 7.383 7.100 357.034 2,246 11.409 11.113 228.065 1,434 811 31.3 88.3 43.4 0.98615 800 2.000 798 0.12630
SL.S 7.945 7.650 335.585 2,111 14.786 14.490 117.025 736 1,375 31.3 88.3 43.4 0.98615 1,356 3.389 1,352 0.12630
TOTAL
TOTAL 26,299 165,416 533 3,353 162,063 159,818 159,618
REMARKS: 1,066 41 1,025 1,012 1,010

: PRODUCTION LOADING INTO COT 6C

Gross Volume :(T.O.V.) 165,416 Oil Volume @ 60 F :(N.S.V.) 159,618 DRAFT FWD 8.60 m AFT
Less Free Water : 3,353 Less OBQ/ROB :
Oil Volume :(G.O.V.) 162,063 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 159,818 Long tons/Metric tons :
Long Tons/Metric Tons : 20,185 20,510 Vessel Experience Factor :
API 60 F : 43.4 Adjusted Volum @ 60 F : Capt. Juanda Pardede
B.S & W. % Vol :. 0.20 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 18-Feb-16

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

1,541.236 0.12833 1566.008


155.407 0.12833 157.905
2,792.697 0.12833 2837.583
2,495.043 0.12833 2535.145
4,521.907 0.12833 4594.587
3,612.911 0.12833 3670.981
2,113.878 0.12833 2147.854
2,679.817 0.12833 2722.889
101.034 0.12833 102.658
171.220 0.12833 173.972

20,185 20,510

11.00 m TRIM 2.40 m


LIST NIL

Capt. Ihwan Asrul


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 18-Feb-16 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Ihwan Asrul Santos Rep. Capt. Juanda Parde

Crude Storage Lifting

24 Hours Total (bbls) 1,066 Last Lifting 25-No

BS and W % 0.200 Lifting Vol (bbls) 228,952

Storage Gross (bbls) Next Lifting


162,063 N/A

Storage Net / G.S.V (Nbbls) 159,818 Next Lifting Vol (bbls) N/A

Storage Net / N.S.V (Nbbls) 159,618

Days to Tank Tops 144 Vessel ETA N/A

Total Crude This Month (Nbbls) 159,818

Water Offtake

Water Received 24hrs (bbls) 41 Offtake 24 Hours (bbls) 0

Total Water in Cargo (bbls) 3,353

Total P/W Received (bbls) 67,075

Water Drawn off (bbls) 0 Loading/Incoming Temp 40.0

Specific Gravity 0 Storage tanks's temperature 30.6

PFW PH 0
Note: : PRODUCTION LOADING INTO COT 6C
OIW Average (mg/I) 11

OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0 0

Non Metal Waste 0.0 0

Metal Waste 0 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0


OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 305,791 ###109103 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 0 1,507

Closing (m3) 305,791 107,596 0

Supply Remaining (days)

Remarks : NIL

Meetings

Type Time Comment

1. Review previous day activity


2. Progress maintenance main deck,etc at COT 2 C
3. Corrective action for the workplace inspection
4. Check LSA & FFA ( Check & maintenance fireman outfit
5. Progress repair hydraulic valve system COT 5C & 6 C
6. Landing material cradle food stuff
7. Chipping, brushing and painting floor plate in E/R
8. Check medicine , stationary and GMDSS equipment
Tool box meeting 06.30
9. Maintenance A/E No.2
10. Progress installation sea water cooling pipe A/C accom

1. Deck and engine Dept. routine maintenance


2. Check & maintenance LSA & FFA ( fire hose box equipm
3. Test cargo test High - High High Level Alarm
4. Lifting materials and food stuff
Supervisory Meeting 16.30 5. Corrective action for the workplace inspection

Incidents

Type Reference Comments


NIL

Drills
Type Time Comme
NIL

S.T.O.P. Audit program

Hazard Observation Card : 0

###
Capt. Juanda Pardede

25-Nov-15

bbls

N/A

N/A

N/A

deg C

deg C

TO COT 6C

28435 / 159478
e Vessel

Comment

etc at COT 2 C
inspection
enance fireman outfit equipment and box )
stem COT 5C & 6 C

or plate in E/R
MDSS equipment

ooling pipe A/C accommodation

ntenance
( fire hose box equipment )
evel Alarm

inspection
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
: PRODUCTION LOADING INTO COT 6C

Mooring/Unmooring :
06.00 : KST 51 cast off
20.45 : Adventurer 1 portside alongside for bunker FW
22.30: Adventurer 1 cast off

Bunkering/Debunkering :
20.55 : Commenced transfer FW to Adventurer 1
22.20 : Completed transfer FW to Adventurer 15 T

Personnel & Material Transfer :


06.00 : 6 persons DSN, 1 person Apexindo by KST 51 ( Out )
10.00 : 1 person Nalco by KST 51 ( In )
11.40 : 1 person Nalco by KST 51 ( Out )
18.00 : 6 person DSN, 1 person Apexindo by KST 51 ( In ),
20.30 : 2 cradle food stuff, 1 cargo net, 112 empty bottle Aqua

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist transferred Santos and contractor personnel
2. Progress maintenance main deck,etc at COT 2 C
3. Corrective action for the workplace inspection
4. Checked LSA & FFA ( Check & Maintenance fireman outfit box )
5. Repaired hydraulic v/v system COT 6C & 5C ( Completed )
6. Transferred food stuff cradle, etc to Adventurer 1

ENGINE :
1. Chipping, brushing & painting the floor plate in E/R
2. Maintenance A/E No.2
3. Checked & repaired hydraulic valve system for COT 6C & 5C ( Completed )
4. Running up two A/E for transfer materials:
20.12 - 21.00 : Transfer materials to Adventurer 1
5. Progress installed sea water cooling pipe for A/C accommodation

2. PERMIT TO WORK PW MW HW CSE IP VAL


292 827 272 126 6 392
2.1 J HA 292 827 272 126 4 392
3. BUNKERS(M3) CONS RCVD
M.F.O 0 0
M.D.O 1,507 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 2 0 15 0
DOM 8 0 0 19
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
8 8
MAN HOURS ( POB X 12 HRS )
Previous man hours 210908 Days W/O LTI 812 Since 28-Nov-13
Man hours today 276
Total man hours 211184
Safe man hours 211184
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
Hazard observations
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by MST and C/E with deck/engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


18-Feb-16 @2400 HRS

TOTAL
1915
1913
TRANS ROB
0 305,791
0 107,596
ROB `
103
157
ROB
200
POB
31

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1164 2 1166
772 0 772
3 0 3
0 0 0
1029 0 1029

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Feb-16

MDO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 77,059 0 0 1,700 0 75,359
02 75,359 0 0 1,900 0 73,459 Running test boiler
03 73,459 0 0 1,700 0 71,759
04 71,759 0 0 1,900 0 69,859 Running test boiler
05 69,859 0 0 1,700 0 68,159
06 68,159 0 0 1,650 0 66,509 Test after installation ups
07 66,509 0 0 1,700 0 64,809
08 64,809 0 0 1,964 0 62,845 Internal cargo transfer
09 62,845 0 0 1,521 0 61,324
10 61,324 0 0 1,530 0 59,794
11 59,794 0 0 1,515 0 58,279
12 58,279 0 0 1,525 0 56,754
13 56,754 0 0 1,542 0 55,212
14 55,212 0 0 1,507 0 53,705
15 53,705 0 0 1,540 0 52,165
16 52,165 60,000 0 1,545 0 110,620 Received bunker 60,000
17 110,620 0 0 1,517 0 109,103
18 109,103 0 0 1,507 0 107,596
18 16

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Feb-16

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 308,491 0 0 0 0 308,491
02 308,491 0 0 0 0 308,491
03 308,491 0 0 0 0 308,491
04 308,491 0 0 0 0 308,491
05 308,491 0 0 0 0 308,491
06 308,491 0 0 0 0 308,491
07 308,491 0 0 0 0 308,491
08 308,491 0 0 2,700 0 305,791 Internal cargo transfer
09 305,791 0 0 0 0 305,791
10 305,791 0 0 0 0 305,791
11 305,791 0 0 0 0 305,791
12 305,791 0 0 0 0 305,791
13 305,791 0 0 0 0 305,791
14 305,791 0 0 0 0 305,791
15 305,791 0 0 0 0 305,791
16 305,791 0 0 0 0 305,791
17 305,791 0 0 0 0 305,791
18 305,791 0 0 0 0 305,791
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 11 12
2 10 10
3 14 14
4 13 13
5 12 11
6 11 13
7 14 14
8 13 12
9 10 13
10 11 14
11 11 14
12 14 12
13 10 13
14 10 14
15 12 13
16 13 14
17 10 11
18 11 13
19 12
20 14
21 10
22 12
23 11
24 12
25 14
26 13
27 12
28 14
29 12
30 14
31 13

TOTAL 373 230 0 0 0 0 0 0 0 0 0 0


LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 7 8
2 8 7
3 8 8
4 7 8
5 8 8
6 8 8
7 7 8
8 8 7
9 8 8
10 8 8
11 8 8
12 8 8
13 7 8
14 8 8
15 7 8
16 7 8
17 8 7
18 8 8
19 8
20 8
21 7
22 8
23 8
24 8
25 8
26 8
27 7
28 8
29 8
30 8
31 8

TOTAL 240 141 0 0 0 0 0 0 0 0 0 0


LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,952 4,977
2 4,938 4,956
3 4,973 4,962
4 4,961 4,971
5 4,946 4,968
6 4,927 4,955
7 4,938 4,962
8 4,981 4,966
9 4,972 4,959
10 4,963 4,957
11 4,959 4,963
12 4,945 4,968
13 4,937 4,961
14 4,962 4,966
15 4,976 4,971
16 4,948 4,967
17 4,952 4,959
18 4,928 4,967
19 4,942
20 4,965
21 4,928
22 4,951
23 4,972
24 4,938
25 4,944
26 4,958
27 4,967
28 4,935
29 4,951
30 4,962
31 4,958

TOTAL 153,529 89,355 0 0 0 0 0 0 0 0 0 0

Averag
e/Day 4,953 3,191 0 0 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity R.O Waste Water ( M3 )


Date
JAN FEB MARC APR MEY JUN
1 130 65
2 30 80
3 130 125
4 40 120
5 75 125
6 40 70
7 125 100
8 100 75
9 110 85
10 135 85
11 120 65
12 80 105
13 50 110
14 125 90
15 120 60
16 95 95
17 115 80
18 100 95
19 105
20 145
21 95
22 120
23 110
24 80
25 105
26 115
27 100
28 110
29 105
30 145
31 100

TOTAL 3,155 1,630 0


DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Feb 2016

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Feb-2016 22 1 16 39
2-Feb-2016 22 1 16 39
3-Feb-2016 22 0 25 47
4-Feb-2016 22 1 25 48
5-Feb-2016 23 1 18 42
6-Feb-2016 23 1 14 38
7-Feb-2016 23 0 12 35
8-Feb-2016 23 0 12 35
9-Feb-2016 23 0 16 39
10-Feb-2016 23 1 21 45
11-Feb-2016 23 0 21 44
12-Feb-2016 23 1 20 44
13-Feb-2016 23 0 20 43
14-Feb-2016 23 0 20 43
15-Feb-2016 23 0 20 43
16-Feb-2016 23 1 19 43
17-Feb-2016 23 0 8 31
18-Feb-2016 23 0 8 31

TOTAL 410 8 311 729