LOAD DIAGRAM

20m 25m 30m 35m 40m 45m 50m 55m


55m 2 fall 6 6 6 5.55 4.45 3.55 2.85 2.3
20m 25m 30m 35m 40m 45m 50m
4 fall 10 9.3 7 5.4 4.7 3.7 3
50m 2 fall 6 6 6 6 4.9 4 3.25
20m 25m 30m 35m 40m 45m
4 fall 12 9.4 7 6 4.8 3.9
45m 2 fall 6 6 6 6 5,1 4.15
20m 25m 30m 35m 40m
40m 4 fall 12 9.6 7.4 6.2 5
2 fall 6 6 6 6.5 5.25
20m 25m 30m 35m
35m 4 fall 12 9.6 7.4 6.2
2 fall 6 6 6 6
20m 25m 30m
30m 4 fall 12 9.7 7.4
2 fall 6 6 6

ANCHORAGES
L68B2
173.8m
146.8m
HEIGHT UNDER HOOK 119.8m
92.8m
65.8m

111.15m

138.15m
41.4

30.15m

57.15m

84.15m
MECHANISM
H(m) L68B2
H(m) L68B2 Rope length
3m

3m

8 L68B2
3m

46.35 H(m)
43.35 7 33.9 10 m/min 044 061 080
40.35 6 8 30.9 9
37.35 5
41.4 27.9 8 t 5 3.75 2.5
38.4 7
34.35 4 6 24.9 7 R m/min 029.3 040.6 053.3
31.35 3 2m 35.4 6 HOISTING 75LVF30 55 kW 550 m
5 2m
H

2 32.4 5 t 7.5 5.6 3.75


28.35
29.4 4 2m
25.35 1 4
26.4 3 m/min 022 030.5 040
7.5m 7.5m

1.5m

3
A

23.4 2
1 2 t 10 7.5 5
0.15m

20.4
7.5m 7.5m

R 1
LUFFING 75VVF30 2.5 min 55kW
5.1m

P SLEWING RCV95 00.8r/min Nm


66m F1 F1 F2 Rt443 025m/min 45.2kW
A min 12m TRAVELING
F1 118t 134t F1 151t 218t R max 34t RT324 025m/min 25.2kW
68t F2 114t 182t 56t P max 101t 56t 380v (+-5%)50Hz 165kVA