The document provides a status update on materials and drawings for a staff accommodation project at Al Twar as of February 14, 2017. For materials, items like light fittings, switchboards, control panels, and sanitary wares are awaiting supplier confirmation or client approval. For drawings, revisions are ongoing for the drainage system drawings and schematic diagrams are being prepared for HVAC systems.
The document provides a status update on materials and drawings for a staff accommodation project at Al Twar as of February 14, 2017. For materials, items like light fittings, switchboards, control panels, and sanitary wares are awaiting supplier confirmation or client approval. For drawings, revisions are ongoing for the drainage system drawings and schematic diagrams are being prepared for HVAC systems.
The document provides a status update on materials and drawings for a staff accommodation project at Al Twar as of February 14, 2017. For materials, items like light fittings, switchboards, control panels, and sanitary wares are awaiting supplier confirmation or client approval. For drawings, revisions are ongoing for the drainage system drawings and schematic diagrams are being prepared for HVAC systems.
1 Light Fittings 2 LV Switch Boards / SMDBs / DBs ABB Feb-16 3 Control Panels 4 PICV 5 Thermostats 5 Sanitary Wares Twyford 6 CP Fittings Grohe MODATION AT AL TWAR SH DATE : 03.12.2017 N AS ON 14.02.2017
REMARKS Waiting for Sample Approval
Awaiting Supplier Confirmation
Awaiting Supplier Confirmation Awaiting Supplier Confirmation Waiting for Client Approval Waiting for Client Approval PJ - 10040, DM STAFF ACCOMMODATION AT AL TWAR START DATE : 12.06.2016 FINISH DATE : 03.12.2017 BALANCE SHP DRAWINGS SUBMISSION AS ON 14.02.2017
SL NO TITLE PROP. DATE REMARKS
A Drainage System All drawings 16.02.2017 Revisions are going on B HVAC 1 Roof Floor 16.02.2017 2 Schematic Diagram for ON AT AL TWAR : 03.12.2017 ON 14.02.2017