Job Number Sheet Job Number Sheet

KTP/10/13 KTP/10/13
Job Title Job Title
NEW FUTURA NEW FUTURA
Software Consultants (Pty) Ltd Client Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com M/s KTP SPORE PTE LTD Internet: http://www.prokon.com M/s KTP SPORE PTE LTD
Calcs by Checked by Date Calcs by Checked by Date
E-Mail : mail@prokon.com HT T&T MARCH 2015 E-Mail : mail@prokon.com HT T&T MARCH 2015
Continuous Beam: N12HB6-7 (Code of Practice : CP65 - 1999)
Span M left M right
3/13/2013 12:52:22 PM C01 (kNm) (kNm)

Input Tables
Fcu (MPa) 35
Sections
Fy (MPa) 460
300 300
Fyv (MPa) 460
% Redistribution 0

600

650
Downward/Optimized redistr. D
Cover to centre top steel(mm) 40
Cover to centre bot.steel(mm) 40
Dead Load Factor 1.4 SECTION 1
SECTION 2
Live Load Factor 1.6
Density of concrete (kN/m3) 24
% Live load permanent 25 Beam Elevation
(Creep coefficient) 2 1 SPAN 1 2 SPAN 2 3

Ecs (Free shrinkage strain) 300E-6


Live
6.00 13.00 6.00 13.00

Dead+
Own W
Sec Bw D Bf-top Hf-top Bf-bot Hf-bot Y-offset Web Flange 19.32 47.32 19.32 47.32
No. (mm) (mm) (mm) (mm) (mm) (mm) (mm) offset offset
1 300 600
2 300 650
7.000 7.000

Span Section Sec No Sec No


No Length(m) Left Right
1 7 1 1
2 7 1 1

Sup Code Column Below Code Column above Code


No. C,F F,P F,P
D(mm) B(mm) H(m) D(mm) B(mm) H(m)
1 600 800 4 600 800 4
2 600 800 4 600 800 4
3 600 800 4 600 800 4

Case Span Wleft Wright a b P a M a


D,L (kN/m) (kN/m) (m) (m) (kN) (m) (kNm) (m)
D 1 15 15
L 1 6 6
D 1 0 28 0 3.5
D 1 28 0 3.5 0
L 1 0 7 0 3.5
L 1 7 0 3.5 0

D 2 15 15
L 2 6 6
D 2 0 28 0 3.5
D 2 28 0 3.5 0
L 2 0 7 0 3.5
L 2 7 0 3.5 0
Job Number Sheet Job Number Sheet
KTP/10/13 KTP/10/13
Job Title Job Title
NEW FUTURA NEW FUTURA
Software Consultants (Pty) Ltd Client Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com M/s KTP SPORE PTE LTD Internet: http://www.prokon.com M/s KTP SPORE PTE LTD
Calcs by Checked by Date Calcs by Checked by Date
E-Mail : mail@prokon.com HT T&T MARCH 2015 E-Mail : mail@prokon.com HT T&T MARCH 2015

Deflection, Shear, Moment and Steel diagrams. Spans 1,2 =====================================================================


Elastic Deflections (Alternate spans loaded) Def max = 2.376mm @ 3.50m C O N T I N U O U S B E A M Ver W2.4.02 - 06 May 2008
.500

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00

9.50

10.0

10.5

11.0

11.5

12.0

12.5

13.0

13.5

14.0
.200
.400
.600 Title : N12HB6-7
.800
1.00 Data File : C:\Documents and Settings\Owner\Desktop\NF ST12\N12TH\N12HB6-7.C01
1.20
1.40
Date/Time : 3/13/2013
1.60
1.80
Code of Practice : CP65 - 1999
2.00 =====================================================================
2.20
2.40
BENDING MOMENTS & REINFORCEMENT
Long-term Deflections (All spans loaded - using required reinforcement) Def max = 14.11mm @ 10.5m
.500

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00

9.50

10.0

10.5

11.0

11.5

12.0

12.5

13.0

13.5

14.0
2.00
SPAN 1
4.00

6.00 Position(m) Min.Moment(kNm) Max.Moment(kNm) As-top(mm2) As-bot(mm2)


8.00

10.0 0.000 -256.71 -130.43 1267.93 0.00


12.0 0.250 -204.61 -103.29 987.24 0.00
14.0 0.500 -155.03 -77.47 732.64 0.00
0.750 -108.19 -53.12 508.15 0.00
SHEAR: X-X V max = -222.2kN @ 7.00m 1.000 -64.31 -30.35 302.07 0.00
200 1.250 -23.63 -9.28 110.97 0.00
150
100
1.500 9.95 15.38 0.00 72.22
50.0 1.750 27.23 48.40 0.00 227.33
2.000 42.42 77.56 0.00 364.28
.500

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00

9.50

10.0

10.5

11.0

11.5

12.0

12.5

13.0

13.5

14.0
-50.0
-100
2.250 55.40 102.71 0.00 482.42
-150 2.500 66.06 124.07 0.00 582.74
-200 2.750 74.25 140.89 0.00 662.03
3.000 79.86 152.94 0.00 722.15
-300
MOMENTS: X-X M max = -291.7kNm @ 7.00m 3.250 82.77 160.00 0.00 757.66
-250 3.500 82.84 161.85 0.00 766.98
-200 3.750 80.00 158.33 0.00 749.22
-150
-100
4.000 74.32 149.59 0.00 705.39
-50.0 4.250 65.94 135.87 0.00 638.14
.500

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00

9.50

10.0

10.5

11.0

11.5

12.0

12.5

13.0

13.5

14.0
4.500 54.97 117.37 0.00 551.29
50.0
100
4.750 41.55 94.34 0.00 443.12
150 5.000 25.80 67.00 0.00 314.67
5.250 7.83 35.56 0.00 167.01
Shear Steel: X-X Asv max = .4048mm/mm @ 5.75m 5.500 -12.21 0.25 57.36 1.20
.400
5.750 -47.26 -34.22 221.96 0.00
.350

.300
6.000 -90.22 -58.05 423.76 0.00
.250
6.250 -136.38 -83.60 640.55 0.00
.200 6.500 -185.50 -110.72 887.74 0.00
.150 6.750 -237.36 -139.30 1161.98 0.00
.100
7.000 -291.74 -169.22 1465.33 0.00
.050
.500

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00

9.50

10.0

10.5

11.0

11.5

12.0

12.5

13.0

13.5

14.0

SPAN 2
Bending Steel: X-X As max = -1465mm2 @ 7.00m
-1400
-1200
Position(m) Min.Moment(kNm) Max.Moment(kNm) As-top(mm2) As-bot(mm2)
-1000
-800
-600 0.000 -291.74 -169.22 1465.33 0.00
-400
0.250 -237.36 -139.30 1161.98 0.00
.500

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00

9.50

10.0

10.5

11.0

11.5

12.0

12.5

13.0

13.5

14.0

-200
0.500 -185.50 -110.72 887.74 0.00
200
400
0.750 -136.38 -83.60 640.55 0.00
600 1.000 -90.22 -58.05 423.76 0.00
1.250 -47.26 -34.22 221.96 0.00
1.500 -12.21 0.25 57.36 1.20
1.750 7.83 35.56 0.00 167.01
2.000 25.80 67.00 0.00 314.67
2.250 41.55 94.34 0.00 443.12
2.500 54.97 117.37 0.00 551.29
2.750 65.94 135.87 0.00 638.14
Job Number Sheet Job Number Sheet
KTP/10/13 KTP/10/13
Job Title Job Title
NEW FUTURA NEW FUTURA
Software Consultants (Pty) Ltd Client Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com M/s KTP SPORE PTE LTD Internet: http://www.prokon.com M/s KTP SPORE PTE LTD
Calcs by Checked by Date Calcs by Checked by Date
E-Mail : mail@prokon.com HT T&T MARCH 2015 E-Mail : mail@prokon.com HT T&T MARCH 2015
3.000 74.32 149.59 0.00 705.39 0.000 122.16 222.24 795.12 0.00 0.30
3.250 80.00 158.33 0.00 749.22 0.250 117.08 212.63 795.12 0.00 0.30
3.500 82.84 161.85 0.00 766.98 0.500 111.50 202.11 538.07 0.00 0.30
3.750 82.77 160.00 0.00 757.66 0.750 105.42 190.70 214.49 0.00 0.30
4.000 79.86 152.94 0.00 722.15 1.000 98.84 178.39 120.15 0.26 0.30
4.250 74.25 140.89 0.00 662.03 1.250 91.76 165.18 74.45 0.40 0.30
4.500 66.06 124.07 0.00 582.74 1.500 84.18 151.07 63.15 0.39 0.30
4.750 55.40 102.71 0.00 482.42 1.750 76.10 136.05 63.15 0.33 0.30
5.000 42.42 77.56 0.00 364.28 2.000 67.52 120.14 68.00 0.23 0.30
5.250 27.23 48.40 0.00 227.33 2.250 58.44 103.33 76.22 0.12 0.30
5.500 9.95 15.38 0.00 72.22 2.500 48.86 85.62 81.98 0.02 0.30
5.750 -23.63 -9.28 110.97 0.00 2.750 38.78 67.01 86.07 0.00 0.30
6.000 -64.31 -30.35 302.07 0.00 3.000 28.20 47.49 89.00 0.00 0.30
6.250 -108.19 -53.12 508.15 0.00 3.250 17.12 27.08 90.80 0.00 0.30
6.500 -155.03 -77.47 732.64 0.00 3.500 3.35 5.77 91.51 0.00 0.30
6.750 -204.61 -103.29 987.24 0.00 3.750 -17.96 -6.04 91.14 0.00 0.30
7.000 -256.71 -130.43 1267.93 0.00 4.000 -38.38 -17.12 89.69 0.00 0.30
4.250 -57.89 -27.70 87.13 0.00 0.30
--------------------------------------------------------------------- 4.500 -76.50 -37.78 83.51 0.00 0.30
4.750 -94.21 -47.36 78.41 0.07 0.30
SHEAR FORCES & REINFORCEMENT 5.000 -111.02 -56.44 71.40 0.18 0.30
5.250 -126.94 -65.02 63.15 0.28 0.30
SPAN 1 5.500 -141.95 -73.10 63.15 0.35 0.30
5.750 -156.06 -80.68 74.45 0.36 0.30
Position(m) Minimum Maximum Shear Asv/Sv Asv/Sv(nom) 6.000 -169.27 -87.76 107.33 0.28 0.30
Shear(kN) Shear(kN) Capacity(kN) (mm2/mm) (mm2/mm) 6.250 -181.58 -94.34 198.56 0.00 0.30
6.500 -193.00 -100.42 504.71 0.00 0.30
0.000 111.08 213.12 795.12 0.00 0.30 6.750 -203.51 -106.00 795.12 0.00 0.30
0.250 106.00 203.51 795.12 0.00 0.30 7.000 -213.12 -111.08 795.12 0.00 0.30
0.500 100.42 193.00 504.71 0.00 0.30
0.750 94.34 181.58 198.56 0.00 0.30 ---------------------------------------------------------------------
1.000 87.76 169.27 107.33 0.28 0.30
1.250 80.68 156.06 74.45 0.36 0.30 COLUMN REACTIONS
1.500 73.10 141.95 63.15 0.35 0.30
1.750 65.02 126.94 63.15 0.28 0.30 Support Dead Load(kN) Live Load(kN) Dead + Live(kN) Ultimate(kN)
2.000 56.44 111.02 71.40 0.18 0.30
2.250 47.36 94.21 78.41 0.07 0.30 1 113.50 32.37 145.87 213.12
2.500 37.78 76.50 83.51 0.00 0.30 2 239.48 68.26 307.73 444.48
2.750 27.70 57.89 87.13 0.00 0.30 3 113.50 32.37 145.87 213.12
3.000 17.12 38.38 89.69 0.00 0.30
3.250 6.04 17.96 91.14 0.00 0.30 ---------------------------------------------------------------------
3.500 -5.77 -3.35 91.51 0.00 0.30
3.750 -27.08 -17.12 90.80 0.00 0.30 COLUMN MOMENTS (Ultimate limit state)
4.000 -47.49 -28.20 89.00 0.00 0.30
4.250 -67.01 -38.78 86.07 0.00 0.30 Columns below
4.500 -85.62 -48.86 81.98 0.02 0.30
4.750 -103.33 -58.44 76.22 0.12 0.30 Support Bending Moment(kNm) Shear Force (kN)
5.000 -120.14 -67.52 68.00 0.23 0.30 No. Min. Max. Min. Max.
5.250 -136.05 -76.10 63.15 0.33 0.30
5.500 -151.07 -84.18 63.15 0.39 0.30 1 -128.35 -65.22 -48.13 -24.46
5.750 -165.18 -91.76 74.45 0.40 0.30 2 -55.46 55.46 -20.80 20.80
6.000 -178.39 -98.84 120.15 0.26 0.30 3 65.22 128.35 24.46 48.13
6.250 -190.70 -105.42 214.49 0.00 0.30
6.500 -202.11 -111.50 538.07 0.00 0.30 Columns above
6.750 -212.63 -117.08 795.12 0.00 0.30
7.000 -222.24 -122.16 795.12 0.00 0.30 Support Bending Moment(kNm) Shear Force (kN)
No. Min. Max. Min. Max.
SPAN 2
1 -128.35 -65.22 -48.13 -24.46
Position(m) Minimum Maximum Shear Asv/Sv Asv/Sv(nom) 2 -55.46 55.46 -20.80 20.80
Shear(kN) Shear(kN) Capacity(kN) (mm2/mm) (mm2/mm) 3 65.22 128.35 24.46 48.13
Job Number Sheet Job Number Sheet
KTP/10/13 KTP/10/13
Job Title Job Title
NEW FUTURA NEW FUTURA
Software Consultants (Pty) Ltd Client Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com M/s KTP SPORE PTE LTD Internet: http://www.prokon.com M/s KTP SPORE PTE LTD
Calcs by Checked by Date Calcs by Checked by Date
E-Mail : mail@prokon.com HT T&T MARCH 2015 E-Mail : mail@prokon.com HT T&T MARCH 2015
--------------------------------------------------------------------- 4.000 1.71 2.27
4.250 1.62 2.14
ELASTIC DEFLECTIONS (Alternate spans loaded - positive downward) 4.500 1.49 1.97
4.750 1.34 1.77
Modulus of elasticity: Ec = 20 + fcu/5 = 27.0 Gpa 5.000 1.17 1.55
5.250 0.99 1.31
SPAN 1 5.500 0.80 1.06
5.750 0.62 0.82
Position(m) Min.Deflection(mm) Max.Deflection(mm) 6.000 0.45 0.60
6.250 0.30 0.39
0.000 -0.00 -0.00 6.500 0.17 0.22
0.250 0.06 0.08 6.750 0.06 0.08
0.500 0.17 0.22 7.000 0.00 0.00
0.750 0.30 0.39
1.000 0.45 0.60 ---------------------------------------------------------------------
1.250 0.62 0.82
1.500 0.80 1.06 LONGTERM DEFLECTIONS (All spans loaded - positive downward)
1.750 0.99 1.31
2.000 1.17 1.55 Symbols: DS : Shrinkage deflection.
2.250 1.34 1.77 DL : Long-term deflection under permanent load.
2.500 1.49 1.97 DI : Instantaneous deflection under short-term load.
2.750 1.62 2.14 DT : Total long-term deflection.
3.000 1.71 2.27
3.250 1.77 2.35 SPAN 1
3.500 1.78 2.38
3.500 1.78 2.38 Position(m) DS(mm) DL(mm) DI(mm) DT(mm)
3.750 1.74 2.33
4.000 1.66 2.23 0.000 -0.00 0.00 0.00 -0.00
4.250 1.54 2.08 0.250 0.09 0.48 0.09 0.65
4.500 1.39 1.89 0.500 0.21 1.16 0.21 1.58
4.750 1.22 1.67 0.750 0.36 2.03 0.37 2.75
5.000 1.03 1.44 1.000 0.54 3.04 0.56 4.14
5.250 0.84 1.19 1.250 0.74 4.16 0.76 5.66
5.500 0.66 0.94 1.500 0.94 5.31 0.97 7.22
5.750 0.48 0.70 1.750 1.14 6.44 1.18 8.76
6.000 0.32 0.49 2.000 1.33 7.49 1.37 10.18
6.250 0.18 0.30 2.250 1.49 8.40 1.53 11.42
6.500 0.08 0.15 2.500 1.62 9.16 1.66 12.44
6.750 0.01 0.04 2.750 1.72 9.74 1.76 13.23
7.000 -0.00 0.00 3.000 1.80 10.15 1.83 13.78
3.250 1.84 10.37 1.87 14.07
SPAN 2 3.500 1.84 10.39 1.87 14.11
3.500 1.84 10.39 1.87 14.11
Position(m) Min.Deflection(mm) Max.Deflection(mm) 3.750 1.82 10.23 1.84 13.89
4.000 1.76 9.88 1.78 13.43
0.000 -0.00 0.00 4.250 1.67 9.35 1.69 12.71
0.250 0.01 0.04 4.500 1.55 8.65 1.57 11.76
0.500 0.08 0.15 4.750 1.40 7.79 1.41 10.60
0.750 0.18 0.30 5.000 1.23 6.79 1.23 9.24
1.000 0.32 0.49 5.250 1.03 5.69 1.03 7.75
1.250 0.48 0.70 5.500 0.83 4.56 0.82 6.21
1.500 0.66 0.94 5.750 0.63 3.44 0.62 4.69
1.750 0.84 1.19 6.000 0.44 2.40 0.44 3.28
2.000 1.03 1.44 6.250 0.28 1.51 0.28 2.07
2.250 1.22 1.67 6.500 0.15 0.80 0.15 1.10
2.500 1.39 1.89 6.750 0.06 0.29 0.06 0.40
2.750 1.54 2.08 7.000 0.00 0.00 0.00 0.00
3.000 1.66 2.23
3.250 1.74 2.33 SPAN 2
3.500 1.78 2.38
3.500 1.78 2.38 Position(m) DS(mm) DL(mm) DI(mm) DT(mm)
3.750 1.77 2.35
Job Number Sheet
KTP/10/13
Job Title
NEW FUTURA
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com M/s KTP SPORE PTE LTD
Calcs by Checked by Date
E-Mail : mail@prokon.com HT T&T MARCH 2015
0.000 -0.00 0.00 0.00 -0.00
0.250 0.06 0.29 0.06 0.40
0.500 0.15 0.80 0.15 1.10
0.750 0.28 1.51 0.28 2.07
1.000 0.44 2.40 0.44 3.28
1.250 0.63 3.44 0.62 4.69
1.500 0.83 4.56 0.82 6.21
1.750 1.03 5.69 1.03 7.75
2.000 1.23 6.79 1.23 9.24
2.250 1.40 7.79 1.41 10.60
2.500 1.55 8.65 1.57 11.76
2.750 1.67 9.35 1.69 12.71
3.000 1.76 9.88 1.78 13.43
3.250 1.82 10.23 1.84 13.89
3.500 1.84 10.39 1.87 14.11
3.500 1.84 10.39 1.87 14.11
3.750 1.84 10.37 1.87 14.07
4.000 1.80 10.15 1.83 13.78
4.250 1.72 9.74 1.76 13.23
4.500 1.62 9.16 1.66 12.44
4.750 1.49 8.40 1.53 11.42
5.000 1.33 7.49 1.37 10.18
5.250 1.14 6.44 1.18 8.76
5.500 0.94 5.31 0.97 7.22
5.750 0.74 4.16 0.76 5.66
6.000 0.54 3.04 0.56 4.14
6.250 0.36 2.03 0.37 2.75
6.500 0.21 1.16 0.21 1.58
6.750 0.09 0.48 0.09 0.65
7.000 -0.00 0.00 0.00 0.00

---------------------------------------------------------------------
QUANTITIES

Section Area(m)
1 0.180
2 0.195

Total weight of beam = 60.48 kN


=====================================================================
A