QUATETION

From ; Gilberto de C. da Conceicao

To ; Mr. Arao Ternorio

Locatio ; Lurumata Dili Timor Leste

Works Description

unit/Bt
No Item Pekerjaan ng Hrga Total

$ $
1 Biaya Tukang 1 800.00 800.00

$ $
2 Baja Kotak 1 500.00 500.00

Mata Gerinda $ $
3 besar 5 8.00 40.00

Mata Gerinda $ $
4 Kecil 20 2.50 50.00

$ $
5 Kawat Las 2 18.00 36.00

$ $
6 Semen 4 5.00 20.00

$ $
7 Pasir no 2 2 45.00 90.00

$ $
8 Trasport 1 50.00 50.00

$ $
9 Besi siku 4 x 4 2 10.00 20.00

$
10 Biaya Total 1,606.00
Dili, 27 Desember 2016

Mr. Gilberto de C. da Onceicao