You are on page 1of 1

COMPLETION SYSTEM

Completion Configurations
Multiple zone Single String Completion Big Bore/Monobore Completion

This completion design The bigbore/monobore


allows the selective installation shows a single-
production of multiple zones trip bigbore/monobore
up one string of tubing. completion. This type of
completion incorporates a
production liner across the
Allows control of each zone producing interval and
individually production tubing that is the
same size as or larger than
Retrievable the production liner. The
production liner allows for a
wide variety of well
Hydraulic packers may be set intervention without the
after installation of the use of a workover rig. This
wellhead design could include
reperforation using large
guns, mechanical erforation
Restricts production isolation, and even
to one zone at a time additional depth. The
Limited material selection completion shown, from the
Limited ability to handle tie-back seal to the
tubing forces yydraulic-set Perma-
Series packer with upper
PBR assembly and above

Multiple zone Single String Big Bore Completion


Completion

You might also like