Professional Documents
Culture Documents
Commissioning
Fundamentals
Commissioning
A/E Firm
General Contractor
Design Review Owner Requirements
Cx Scope and Budget
Develop Cx Plan Draft
Cx Team
Construction
Responsibilities
Cx Scope of Work
Cx Testing Protocols
Cx Preliminary Schedule
Cx Deliverables
Occupancy
Commissioning Process
Review Basis of Design (BOD)
Pre-Design Update Cx Plan
(Planning)
Develop Testing Protocols
Commissioning
DD and CD Design Review in
Meeting BOD, Maintainability,
Design and Constructability
Develop Cx Specifications
noting Contractor Cx
Responsibilities
Construction Installation Verification
Operational
Performance Testing
Integrated System
Occupancy Testing
Training
Commissioning Process
Submittal Reviews
Pre-Design Cx Coordination Kick Off
(Planning) Meeting
Commissioning
Regular Construction Cx
Meetings
Design Installation Verification
Observations (FIV)
Operational Testing
Observations (OPT)
Construction
Integrated Testing
Observations (FPT)
Cx Issue Log
Occupancy Training Scheduling
Commissioning Report
Commissioning Process
Pre-Design
(Planning)
Commissioning
Design
EVERYONE ASSOCIATED
WITH THE PROJECT
Who Should Be A Commissioning
Team Member?
Design Engineers
Design Architect
General Contractor
Mechanical Contractor(s)
Electrical Contractor
TAB Contractor
Commissioning Agent
Owner Groups (User, PM, Maintenance)
What needs to be inspected during
Installation Verification?