CRITICAL PATH METHOD FOR IDP PROJECT

ACTIVITIES/ TASK Month ( Weekly) 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4


Semester (Weekly) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
INTRODUCTION TO INTEGRATED DESIGN PROJECT
1.1 Overview of the Project Development

1.1.1 Infrastructure planning

1.1.2 Structural planning

1.1.3 Governing codes and standards

1.1.4 Local authorities requirements

1.2 Design Office Procedures

1.3 Design Criteria

1.4 Project Briefing

1.0 STRUCTURAL PLANNING AND DESIGN

1.1 Reading and understanding of architectural layout and drawings

1.2 Preliminary structural layout planning


1.2.1 Types of structural system

1.2.2 Location of column and beam

1.2.3 Types of staircase

1.2.4 Types of substructure

1.2.5 Dimension of the structural elements

1.3 Preliminary analysis

1.4 Structural analysis and design

1.4.1 Beam

1.4.2 Slab
1.4.3 Column

1.4.4 Foundation

1.4.5 Software calculation

1.5 Structural design verifiction

1.6 Structural drawing and detailing

1.7 Submission requirements

1.8 Cost estimation of structural elements

2.0 INFRA-STRUCTURE PLANNING DESIGN


2.1 Earthwork

2.1.1 Earthwork planning & design

2.1.2 Proposed level

2.1.3 Cut and fill

2.1.4 Submission drawings & requirement

2.2 Road and Drainage

2.2.1 Main drain & perimeter drain

2.2.2 MASMA design

2.3 Sewerage Reticulation

2.3.1 Estimation of popularation equivalent (PE)

2.3.2 Sewerage reticulation planning & design

2.3.4 Submission drawings & requirements

2.4 Water Reticulation

2.4.1 Estimation of water demand


2.4.2 Water reticulation planning & design

2.4.3 Submission drawings & requirements

2.5 Cost estimation of infra-structure works

3.0 COMPILATION OF DOCUMENTS

4.0 PROJECT PRESENTATION

Planning work
Actual work