You are on page 1of 6

6 7 1390

3
1 2
-1 ) (
-2 ) (
-3 ) (

mo.re.saghazadeh@gmail.com



.
) ( .
) (TBM .

.
.
. .
.
PLAXIS 3D Tunnel
.
.

: TBM EPB

.1


.
.
.
TBM .
. :

. .
.

6 7 1390

.
(Suwansawat, 2002) .

.2

) (EPB
. .
.

.
.
(Reilly, 1982).

PLAXIS 3D Tunnel .3

PLAXIS .
:

1-3

13 TBM 3 . 10
. 2 .
20 X Y 65 Z .
. 1 .

2

6 7 1390

2-3

6 15 .
15
.
).(PLAXIS, 2001

3-3

. 1- 2- .
. -
.
. 1 .
.

-1 )(
1- 2-


3
unsat ) (kN/m 18 18
3
sat ) (kN/m 20 20
2
E ) (kN/m 18000 18000
0/32 0/32
2
C ) (kN/m 50 10
)( 15 30

.4


.
. 150
. 2 3 1 2 .

2 1

3

6 7 1390

3 2

2 3 .
. 2 3
. kN/m2 .

.5

1 2 138
4 .
. 1 L=-6 2 L=-7.5 L ) . (

4 1 2

4 1 2
.

) (M )(M0 .6

M
. ) (M ): (Greenwood, 2001

4

6 7 1390

)(1

PG V0 .
.
M .
) (M0 M
. M0 :

)(2

)(3

C 0 . PG
.

) (3 ) (2
.
.
.
5 6 ) ( M0 1 2 203 138
630 530 430 350 280 780 .

5 ) (M0 1

5

6 7 1390

6 ) (M0 2

5 6 .
.

: .7

.
:

( .
( .
( ) ( .
( )( ) ( .
( M0
.
( ) ( .

.8

1. Suwansawat, S., (2002), Earth pressure balance (EPB) shield tunneling in Bangkok: ground response
and prediction of surface settlements using artificial neural networks, Ph.D. thesis, Massachusetts
Institute of Technology, USA.
2. Reilly, B. J., (1982), EPBMs for the North East Line project, Tunneling and underground Space
Technology, 14 (4), pp 491-508.
3. PLAXIS 3D Tunnel Users Manual, (2001). Edited by R. J. B. Brinkgreve, and P. A. Vermeer, Balkema
Publishers.
4. Kasper, T., Meschke, G., (2006). On the influence of face pressure, grouting pressure and TBM design in
soft ground tunnelling, Tunnelling and Underground Space Technology, 21, pp 160-171.
5. Greenwood, J., (2001), Three-dimensional analysis of surface settlement in soft ground tunneling,
Master thesis, Massachusetts Institute of Technology, USA.