Roadway Operating
Project Name Manufacturing Construction Maintenance Energy PVI Effects (IRI)
Control Mix 100.00% 100.00% 100.00% 100.00% 0.00%

MM1 100.00% 100.00% 55.00% 75.00% 0.00%

MM2 94.00% 100.00% 55.00% 58.00% 0.00%

Printed By: AVINAASH\\Avi Printed On 2/19/2017 7:16:05 PM Page 2 of 4


es [With Control Mix as

Printed By: AVINAASH\\Avi Printed On 2/19/2017 7:16:05 PM Page 3 of 4


PVI Effects
(Deflection)
0.00%

0.00%

0.00%