Tender Evaluation
Tender Evaluation
Executive Summary
The following are the 3 tenders received by company Boost, which is Crimson Enterprise, Phantom
Enterprise and A.W.D INC respectively. Designers from Boost have tendered out the tenders received
according to the Tender Evaluation Criteria from Boost. Contractors from other companies shall follow all
the requirements we proposed in order to have high marks in each criterion.
In a nutshell, designers from Boost hereby have chosen Phantom Enterprise as our group
contractors. The following are the scores obtained from each of the 3 groups, which are 18 out of 24 is
obtained for Crimson Enterprise, 24 out of 24 for Phantom Enterprise and 4 out of 24 is obtained for
A.W.P INC.
First of all, the chosen group is Phantom Enterprise. Contractors from the respective group showed
high quality and efficient of reaching the requirement we stated in the criteria. Every statements the
contractors made are all proven with evidence and shown in Appendices. Therefore, they got 24 out of
24 in the tender evaluation criteria.
The other group is Crimson Enterprise, which also showed quality of work. Contractors are able to
prove time management by providing a to-do-list which stated in the criteria. However, they failed to
show the working schedule and the time needed to finish the task, and lead to the deduction of marks in
time management criterion. Beside, contractors are also unabled to prove that they have experiences in
the drafting programme and lack of evidence of certificates and got 0 out of 4 in this criterion. Crimson
Enterprise still have full marks in the remaining criterion and finally has a 18 out of 24 marks as
tendered by designers from Boost.
The last group is A.W.D INC which showed poor quality of work and lack of evidence throughout the
criteria. Contractors are able to prove the working schedule by providing weekly progress reports.
Besides, they also able to provide certificates regarding the proficiency in English and reached the
requirement and get 2/4 in communication skills criterion. The remaining criterion are all 0 mark given
as the lack of evidence and statements, therefore they got 4 out of 24 in thetender evaluation.
3 oost
B
6.0 Appendices 36
6.1 Appendix A 37-68
6.2 Appendix B 69-107
6.3 Appendix C 108-125
6.4 Design Package of company Boost 126-153
4 oost
B
1.0 Introduction
5 oost
B
Introduction
The following are the 3 tenders received by company Boost, which is Crimson Enterprise, Phantom
Enterprise and A.W.D INC respectively. Designers from Boost have tendered out the tenders received
according to the Tender Evaluation Criteria from Boost. Contractors from other companies shall follow all
the requirements we proposed in order to have high marks in each criterion.
In a nutshell, designers from Boost hereby have chosen Phantom Enterprise as our group
contractors. The following are the scores obtained from each of the 3 groups, which are 18 out of 24 is
obtained for Crimson Enterprise, 24 out of 24 for Phantom Enterprise and 4 out of 24 is obtained for
A.W.P INC.
6 oost
B
The tenders will be evaluate by the members of BOOST. It will be given marks with the table below
by the criteria listed. The tender with getting the highest mark in the evaluation criteria will be
appointed to complete the project.
Criteria Marks
Professionalism /4
Time Management /4
Ability to follow requirement /4
Initiative /4
Communication Skills /4
Experience /4
Total /24
2.1.2 Professionalism
8 oost
B
In Group 10 Boost, we look high upon professionalism and the professional behavior of our
members at all times. Professionalism plays a big role in our team that we work with, and any
team we work with should display an experienced level of professionalism.
0 1 2 3 4
No Giving Be punctual, Be punctual. Be punctual,
profession acceptable Inform the Able to attend able to attend
al skills. reason(s) and designers if all the all the meeting.
Contractors evidence(s) if there is any meeting. Inform the
are late or late or absent changes of Inform the designers if
absent for for the the meeting designers if there is any
any meeting meeting. within 3 there is any changes of the
without hours. High changes of meeting within
informed the dependability the meeting 12 hours. High
designers. within 6 dependability,
hours. High willingness to
dependability learn and show
and emotional
willingness to control
Every task has a deadline and it is there for a reason. In Group 10 Boost, we expect a
company that is able to handle their time management well. Time management is the skill to
plan how we spend our time on completing a given task efficiently. Hence, it is important to have
good time management in each member to deal with the task effectively.
0 1 2 3 4
No time Provide Provide Provide Provide
managemen working working working working
t skills. schedule and schedule and schedule and schedule and
keep a to-do update weekly update weekly update
list. progress to progress to weekly
designers. designers. progress to
Keep a to-do Keep a to-do designers.
list, Prioritize list, prioritize Keep a to-do
task well task well and list, prioritize
review your task well,
progress review
progress and
finishes task
on time
Contractors should build the product by referring to the design provided and the materials
suggested. Tendering companies will be evaluated on the accuracy and precision during the
construction. Any modifications of the design and material without the approval of the designers
will not be
0 1 2 3 4
Unable to Able to follow Able to follow Able to follow Able to follow acceptable.
follow the the the the above 90% of
requirement requirement requirement requirement the
or the around 30%- around 50%- given around requirement
similarity is 50% and low 70% and 70%-90%. given.
lower than understanding normal Show Provided and
30%. about the understanding the good showing high
Modified the project. about the understandi understandin
design and project. ng about the g about the
the material project. design.
used without
any approval.
2.1.5 Initiative
11
Boost
Contractors are encouraged to provide suggestions and ideas to modify the design and materials
used in order to improve the performance of the product. Every suggestions and ideas given
should be acceptable and reasonable and it will be evaluated and given approval by the designers
before the modification of the project or else it is unacceptable.
0 1 2 3 4
Unable to Able to Able to Able to Able to provide
provide any provide provide 1 provide 2 at least 3
suggestion. suggestion to suggestion reasonable suggestions to
The modify a which is suggestions improve the
suggestion(s) better project acceptable to improve performance
is not and give and the of the project
evaluated and explanation. reasonable performance and give the
approved by with of the project acceptable
the designers explanation. with reasons with
before making acceptable support
modification. reasons. evidence.
0 1 2 3 4
Never Poor in No Communicatin Communicate
contact the communicatio interpretation g in English effectively
team n skills and but able to during meeting and regularly
members or limited communicate and express in every
give out vocabulary to in English. the ideas meeting,
notification. express the which are easy showing a
ideas. to understand high
by others. understandin
g of meeting.
The table below shows the final evaluated tender evaluation criteria from 3 respectively groups by
designers from company Boost.
First of all, in the case of Crimson Enterprise, they suggested that the improvement can be
made is to lower down the cost, which a new material list is made with mostly recycled products as
materials. We accept this and think this is a good idea to improve our Design Package. Besides that,
lubricating oil is suggested to be applied on the pencil axle in order to make it move more smoothly,
and sponge to be put in the inner corner part of the base to absorb shock during impact. These are
all good ideas in way to improve our design. Therefore, company Boost accepts all of these
improvements and will try to make them happen in our design.
On the other hand, we have proposed improvements suggested by Phantom Enterprise. They
suggested to use hot glue gun to replace superglue/foam glue in the process of sticking the
polystyrene and the plywood. This idea will not be accepted as this is an inappropriate way,
because hot glue gun will melt down the polystyrene. Furthermore, replacement of the materials of
the wheels with hard materials. In my opinion, this improvement is unnecessary as our wheels have
the bottle cap as the rim which is hard enough to sustain during impact. The last suggestion is using
a velcro tape to prevent the bottle from falling out, and this idea is accepted and will be applied in
our design.
Last but not least, in the case of last group, A.W.D INC, they did not provide any of the
improvements and suggestions. Therefore, there is no reflection to be made against them.
Boost
3.1 Professionalism
Crimson Enterprise states that they are punctual to every meetings they have
in the past few weeks. If any of them could not make it, they will surely inform the
others within 12 hours. This can be seen and proven in the whatsapp conversation
they provided, which is in Appendix A.
Besides, Crimson Enterprise proves that they can control their emotion and
tends to cooperate with each other members when they have different opinions
and conflicts. This also can be shown and proven in Appendix A, in the whatsapp
conversation they had during the discussion about the time of meeting they were
going to have. Crimson Enterprise is awarded for 4/4 marks in this criteria.
Boost
Therefore, Crimson Enterprise is awarded for 2/4 marks in this criteria, as the
lack of evidence of working schedule and the finishing time of tasks given.
Boost
In this case, Crimson Enterprise shows their trust and respect to our
design and to Company Boost designers. They choose to follow us in every
aspects and to work together in this project efficiently. They have worked
out the minutes of meetings and follow up what should they do after every
meetings. This can be proven in Appendix D.
3.4 Initiative
Besides that, lubricating oil as suggested can be applied to the pencil axle
to lubricate it in order to move smoothly. Another suggestion is adding the
sponge in the inner corner part of the base to absorb shock during impact and
the materials used can be proven in Appendix E.
3.6 Experience
Contractors from Crimson Enterprise states that they have experiences in
constructing and building stuff during foundation, and have the knowledge in
drafting program. Some of them even involved themselves as a plumber helper.
However, all of these do not have any evidences. Therefore, there is no mark to
be given in this criteria which is 0/4.
Boost
Contractors from Phantom Enterprise has proved that they are punctual to
every meetings, according to the evidence provided in minutes of meetings in
Appendix A. The contractors from Phantom Enterprise have ensured to informed
company Boosts designers if there are any changed to the meetings within hours,
which the chats and dialogues can be found in Appendix C. Not only that, a
complete record of the Weekly Progress Report (WPR) has been attached as an
evidence of Phantom Enterprises professionalism in meeting all the deadlines
that has been fixed for them. This can be referred in Weekly Progress Report in
Appendix B. Phantom Enterprise is awarded 4/4 as all of the criteria are proven
by evidences.
Boost
4.2 Time Management
Therefore, Phantom Enterprise has been awarded 4/4 marks as evidences are
provided for all of the criteria.
Boost
4.4 Initiative
The first alternation given was the use of hot glue gun as supposed to using
superglue, as stated in the Design Package of company Boost. Next, the use of a
strong material than polystyrene for the wheels, a strong material was
suggested to prevent the wheels from rupturing during the impact from the one
meter vertical drop. Lastly, the use of velcro tape is suggested to prevent the
600ml water bottle from falling off.
4.6 Experiences
Contractors from Phantom Enterprise showed that they have the knowledge
regarding drafting software programs. Certificates of Programming C++ is
provided in Appendix D. Therefore, 4/4 marks is given in this criterion.
Boost
5.1 Professionalism
First of all, there is evidence that shows contractors from A.W.D INC are
punctual to every meetings according to the Minutes of Meetings they provided in
the Appendix A. However, they have no proof that they inform others within 12
hours if they could not make it to the meeting and the emotional control.
Therefore, 1/4 marks is given to A.W.D INC as the lack of evidences.
Boost
A.W.D INC has provided weekly progress report as a working schedule and can
be found in Appendix A. However, A.W.D INC can not reach the remaining
requirements as there is no a single evidence about them. Therefore, 1 out of 4
marks is given in this criterion.
Boost
5.4 Initiative
There is no evidence shown by A.W.D INC, 0/4 mark is given in this criterion.
Boost
6.0 Appendices
Boost
Appendix A
Tender Application from Crimson Enterprise
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Appendix B
Tender Application from Phantom Enterprise
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Boost
Appendix C
Boost