Project Logo:

Project Name : Works Construction of Showroom and Building


Project No. : 148 Form No. : P07-F03 Rev. 01 Feb. 2012
Client: Project Manager: Consultant: Contractor

REQUEST FOR INFORMATION (RFI)


tects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharchitects&engineersibrahimjaidaharch

RFI Raised to : IBRAHIMJAIDAH (CONSULTANT) RFI Ref. No : QA-148-RFI-AR-0011-00


Trades / Discilpline : Architectural (AR) Date of Request : 14/Jul/2016
Subject : Floor Finishes at Second Floor Expected Reply Date :

Reference Documents: Enclosures/Attachments:

Consultant's Architechtural and ID Drawings - YES (No. of Pages)

- NO
Details of RFI :

Reference to drawing no. A-A1-2000, floor finish code for Elec. Room and ELV Room is mentioned as F7 which is concrete topping
in solvent free epoxy coating, whereas ID drawing I-A1-GA-1-0203 shows IF5.01 for these areas which is Oak Timber Floor.
Please note in all other floors Elec. Room and ELV Room have epoxy coating finish.
Kindly clarify the discrepancy.

Raised by:

Name & Sign : Irfan Muzaffar Designation: Sr.Project Manager Date: 14/Jul/2016

Reponse:

BELOW PORTION IS FOR AEB USE ONLY


The Response:

Resolves the query Has NO Cost impact Has Time impact


Does not resolve the query Has NO Time impact Has Cost impact
Requires an Instruction or Change Notice

Responded by: Verified by: Client Rep. Endorsement (when required):

Name / Signature Name / Signature Name / Signature

Designation Date Designation Date Designation Date

Note: The above information/clarification shall not relieve the Contractor from his obligation to perform the work in accordance with the contract documents and HSE requirements.

Request for Information Form No.: P07-F03 / Rev. 0 / Feb. 2012