Introduction
The pupose of this Calculation is to design Retaining wall and check the adequecy of this retaining wall
Notations :
P= Wheel load
Calculation of pier Foundation
q=Surcharge load
Description
Ft:Footing thickness
A:Footing length
SSEM
plant Number
Designer Office
Design by: checked by : Approved by SAUDI ELECTRICAL COMPANY- EOA
Loads :
Description
H= 3.25 m
Ppw=Ce*Cq*Iw*Pw
Job No Contractor :
SSEM
plant Number
Designer Office
BC= 200 kN/m2 net bearing capacity
Ix= 1.30 m4
Iy= 0.21 m4
P 16 kips
x= 2 ft
Description
H= 8.36 ft
m=x/h 0.24
n=Z/H
0
Rev.# Date
m>0.4
1.77 P m n
2 2
2
H m n
2 23
0.40
0.28 P n
2
m<0.4 0.35
H 0.16 n
3
2 2 0.30
0.25
0.20
n= m= =
0 0.24 0.00 0.15
0.1 0.24 0.13 0.10
0.2 0.24 0.32
0.3 0.24 0.37 0.05
0.4 0.24 0.31 0.00
0.5 0.24 0.23 1.2 1 0.8 0.6 0.4 0.2 0
0.6 0.24 0.16 n=z/H
0.7 0.24 0.11
0.8 0.24 0.08
0.9 0.24 0.06
E93: Hakim:
pressure Due to wheel load
E199: Hakim:
F112: Hakim:
or 1.15
F168: Hakim:
300-75-dia/2