Professional Documents
Culture Documents
Aluminum Form Work System PDF
Aluminum Form Work System PDF
com
KUMKANG KIND
Aluminum
Formwork System
Faster construction
Copyright2011 Kumkang Kind Co., Ltd All rights reserved Ver. 01
Global networks
Headquarter Kumkang Kind India Kumkang Kind Malaysia Kumkang Kind Vietnam
1445-2, Kumkang Kind Bldg., Seocho-dong, #101/102 Wagh Manor, Plot No.222, B-9-01, Block B, No.2, Jalan PJU 1A/ 7A, 6th Beautiful Saigon BLDG., 02 Nguyen Khac
Seocho-gu, Seoul, Korea 27th Road, Bandra(w), Mumbai - 400 050 Ara Damansara, PJU 1A, 47301 Petaling Vien St, District 7, Ho Chi Mihn City, Vietnam
Tel. 82-2-3415-4167 Fax. 82-2-3415-4165 Tel & Fax. 91-22-2640-9336 Jaya Selangor, Malaysia Tel. 82-2-3415-4167 Fax. 82-2-3415-4165
kkkorea@kumkangkind.com Mobile. 98-2005-7627 Tel. 60-3-7831-0488 Fax. 60-3-7831-2588 kkvietnam@kumkangkind.com
kkindia@kumkangkind.com kkmalaysia@kumkangkind.com
www.kumkangkind.com
Contents
02 History / About us
History 1 3
04 Special features
1979. 08 Establishment of Kumkang Kind Co., Ltd.
08 Manufacturing facilities 1987. 09 Obtained KS Certificate [Panel form]
09 Manufacturing process 1988. 09 Listed on the Korean Stock Exchange
10 Technical support 1989. 06 Completion of Banwol Factory
12 Rigorous supervision
1990. 01 Completion of Eonyang Factory
13 Setting process
1992. 01 Completion of Busan Factory
14 Formwork components
1992. 05 Obtained KS Certificate [pipes for ordinary, pressure and structural] 2
18 Slab setup
1 Eumseong factory
1992. 07 Obtained quality certificate from Japanese scaffolding association 369-804, Yongsan-ri, Eumseong-eup, Eumseong-gun, Chungcheonbuk-do, Korea
19 Completion of slab setup
1992. 11 Achieved $10 million in exports
2 Jincheon factory #2
20 Dismantlement of slab 1993. 02 Obtained JIS Certificate [structural pipe] 365-824, Mijam-ri, Iwol-myun, Jincheon-gun, Chungcheongbuk-do, Korea
21 Finished assembly & stair 1999. 05 Obtained ISO 9002 Certificate
3 Nilai factory in Malaysia
22 Project references Lot 119-120, Malaysian Industrial Park, Nilai, Negrisenblian, P.O. BOX 71800
2003. 04 Completion of Jincheon #1 Factory
2003. 12 Obtained ISO 9001 Certificate
2005. 10 Establishment of Research and Development department
2006. 05 Completion of Jincheon #2 Factory
2006. 12 Completion of Eumseong Factory Globalized Kumkang Kind Overseas branch offices
2007. 09 Establishment of Kumkang Kind (M) Sdn. Bhd as a subsidiary in Malaysia
Headquarter
2008. 06 Obtained KR [The Korean Register of Shipping] Certificate
1445-2, Kumkang Kind Bldg., Seocho-dong,
2009. 10 Completion of Nilai Factory in Malaysia Seocho-gu, Seoul, Korea
Kumkang America
Kumkang Kind is proud to have its products in more than 23 countries around the world. With the globalization, 483 E. Katella Ave, #216 Orange, CA 92867 USA
we have set up a global network: Kumkang America Inc., Kumkang Kind (M) Sdn. Bhd, Kumkang Kind Vietnam and
Headquarter in Seoul, Korea
Kumkang Kind India are acting as Kumkang Kinds representatives in their respective regions.
As Kumkang Kind has established several agents and distributors, wherever you go, you will always find our
products nearby.
www.kumkangkind.com
Special features 5
No need for skilled workers
Why should you choose The Aluminum Formwork System is made of lightweight
aluminum which allows the largest components to be
hand carried and set up. Even it does not need skilled
Formwork System?
The most important aspect of a successful structural construction
is the formwork system. Kumkang Kind will always offer you the Cost reduction
most trustful, secure, efficient and cutting edge of formwork sys- A form designed for maximum reuse may have to be
tem technology available on the market stronger and more expensive than one designed for a
single use, but it can save a great deal on the total form
investment. Extra features that make erection and strip-
ping easier will add to original form costs, but labor sav-
ings may outweigh the extra cost by using Kumkang Kind
Aluminum Formwork System.
Speed Mobility
Due to its easiness of assembly, 4 days The formwork to the next level can be done
cycle is guaranteed compared to 7~9 days through material transfer box on the slab
cycle for conventional formwork system. without using the crane.
Special features 7
Application
Construction Method Single Storey Double(2) Storey Three(3) to Six(6) Storey High Rise
KUMKANG Kind Aluminum Formwork System specification & composition
(Terrace or Link Houses) (Terrace or Link Houses) (Apartments or Buildings) (Buildings or Apartments)
bility of joints
Suitability increases in proportion to height of build- Inner wall panel Slab corner & Beam
Cast in-situ concrete: Not suitable - requires too much labor & time to
ing & number of units. Not suitable for less than 250
Heavy Shuttering system move equipment from one houses to another
units. Resulting in efficiency loss
Composition Slab panel & Support In-out corner & Hunch
Cast in-situ concrete: Efficient & Cost effective than any of the above methods. Kumkang Kind Aluminum Formwork System is
lightweight, hand-held shuttering, flexible, adaptable, faster & environmentally friendly
Accessory Wall tie / Round pin / Wedge pin
Heavy Shuttering system
Able to pour walls (column) and floor slabs with beams with one lift
Unrivaled
manufacturing capacity
Kumkang Kind manufactures the Aluminum Formwork System both in over a 150,000 m facility located in Eumseon and a 62,600 m
facility located in Jincheon, Korea as well as Nilai factory which has over 24,282 m facility located in Malaysia. We utilize advanced
automated system, skilled labors, and the latest in computer technology to produce the best quality product at a competitive price. 1 Warehousing of raw materials 2 Cutting 3 Hole processing
Eumseong factory
Technical support 11
Plan
Quality guarantee
and unsurpassed support
Listening to your needs and providing solutions have been the hallmark of our
business since day one. We design products that meet your requirements and
demands, not ours. Special applications and custom design are a challenge, not
a problem. Thats why we lead the industry in developing solutions through new
designs.
Services
Kumkang Kind offers a wide variety of services, from Aluminum Formwork CAD
design to consulting services with an emphasis on commercial and residential
construction.
Many accidents occur in formwork product handling when employees, Employee safety is largely depended on proper information, instruction,
particularly those who are young or inexperienced, use machine and training and supervision. Staff must be:
equipment, or handle heavy and awkward materials in hazardous cir- - Informed and trained, so that they understand the nature of any risks
cumstances and without proper training. Storage and handling systems to their health or safety, or that of others, from the work they do and
should not be used by anyone who is not properly trained. In law use the measures necessary to adequately control them
means any activity (involving work equipment) and includes starting, - Instructed as to the safe systems of work they must follow
stopping, programming, setting, transporting, repairing, modifying, main- - Supervised to ensure that they follow the instructions and training Installation of electrical, plumbing
taining, servicing and cleaning. given to them components and steel reinforcing bar
- Involved in the health and safety management system and
decision-making process
www.kumkangkind.com
Formwork components 15
Wall panel Standard panel Prop head [PH] Middle beam [MB] End beam [EB]
Slab panel
450 x 1200 10.8 Size 150 x 300 Weight (kg) 2.5 Size 150 x 900 Weight (kg) 7.6 Size 150 x 600 Weight (kg) 5
400 x 1200 9.9 150 x 1050 8.7 150 x 900 7.2
300 x 1200 8.1 Used to joint the beams together (Mid- 150 x 1050 8.3
dle beam and/or End beam), the pipe Used to joint the prop heads, the middle
support will be placed under the prop beam supports the slab panels Used to joint the prop head and slab
The Slab panel will be used to support
head corner, the end beam supports the slab
the concrete weight during concrete
pouring and casting panels
Slab corner Slab incorner Slab outcorner Joint bar Special prop head
Size 150H Weight (kg/m) 6.581 Dependent upon each structure Dependent upon each structure Weight (kg) 0.68 Dependent upon each structure
Connection between Wall panel & Slab Connection between Wall panel & Slab Connection between Wall panel & Slab Used to joint the prop heads with the Used to joint the beams together (Mid-
panel panel (inside) panel (outside) beams (Middle beam and/or End beam) dle beam and/or End beam), this special
prop head will be placed where a nor-
mal prop head cannot be installed
www.kumkangkind.com
Formwork components 17
Wedge & Round pin or Long pin Pipe support Wall platform, Slab platform and Elevator platform
Weight (kg) 0.085 Weight (kg) 0.33 Weight (kg) 15 Weight (kg) 9 Weight (kg) 10
The Round pin and Wedge pin will be The Long pin and Wedge pin will be
used to joint the Wall or Slab panels used to fix the Joint pin with the prop As a substitute of a scaffolding system, these wall platform, slab platform and elevator platform will
together. head and beams (Middle beam or End be fixed on the concrete. [Wall/Slab/Elevator] and used as working platform for workers.
beam) together.
Flat tie PVC sleeve Waller-bracket & Square pipe Bolt, Nut & Washer Tie rod
The Flat tie is used to joint the wall Made of PVC material, the PVC sleeve The pipe support is used to support the The Waller-bracket and Square pipe are This set of accessories will be used as This accessory will be used as an
panel to the opposite sides wall panel. will be installed between the Wall pan- weight of the slab during concrete pouring used to allow the horizontal straight- an embedded anchor in order to fix pan- embedded anchor in order to fix the
Depending on the wall panels height, el and the opposite sides wall panel. and casting. It will remain under the prop ness of wall panels and a flat wall els on the concrete surface during its Bracket on the concrete surface during
the number of flat tie used will vary. The flat tie will be inserted inside this head until 2 levels of casting. surface (especially at the bottom) after installation. its installation.
item in order to protect the flat tie to be concrete casting.
casted within the concrete.
www.kumkangkind.com
Dismantlement of joint bar and pin Dismantlement of beam Completion of assembly process
JKR Tower, Kuala Lumpur - Malaysia STP Condominium, Kuala Lumpur - Malaysia
www.kumkangkind.com
KLCC Tower, Kuala Lumpur - Malaysia Verve Suites, Kuala Lumpur - Malaysia
www.kumkangkind.com
18 Blocks - Singapore
www.kumkangkind.com