Professional Documents
Culture Documents
Date of
Model SK200-8S inspection 3-Aug-16
The machine was thoroughly inspected and reported the areas which require proper remedies.
Please review and contact us for any question and / or remedies.
The Problem area is shown in the figure.Please refer to the next page for detail.
A. ENGINE
- Engine dalam kondisi terlepas
- Engine telah dilakukan pembongkaran oleh c
- Beberapa komponen engine tidak lengkap
Urgent remedy
B
remedy required required
B. CONTROL VALVE
- Main relief tidak ada
- Port relief untuk spool option tidak ada
- Beberapa hose tidak terpasang
- Solenoid block assy tidak ada
Urgent remedy
C
remedy required required
Urgent remedy
D
remedy required required
D. SWIVEL JOINT
- Swivel joint assy dalam kondisi terlepas
- Aksesoris swivel joint tidak ada
- Kondisi seal tidak diketahui
The Problem area is shown in the figure.Please refer to the next page for detail.
Photo Explanation of inspection result
Urgent remedy
E
remedy required required
Urgent remedy
F
remedy required required
F. CYLINDER
- Attachment dalam kondisi terlepas
- Yang terpasang di unit hanya cylinder boom
- Keterangan dari customer bahwa cylinder ar
kondisi rusak ( rod bengkok )
Urgent remedy
G
remedy required required
Urgent remedy
H
remedy required required
H. CABIN DEVICE
- Harness, mechatro controller, ECU controlle
dan cluster gauge tidak ada
- Valve pilot pedal tidak ada
- Valve pilot handle RH-LH tidak ada
- Wiper arm tidak ada
- Pintu tidak ada
- Frame window front assy tidak ada
The Problem area is shown in the figure.Please refer to the next page for detail.
Photo Explanation of inspection result
Urgent remedy
I
remedy required required
I. BUCKET ASSY
- Keterangan dari customer, unit menggunaka
rotary grapple
Urgent remedy
J remedy required required
J. UNDERCARRIAGE
- Komponen undercarriage dalam kondisi baik
Urgent remedy
K
remedy required required
K. SWING BEARING
- Swing bearing dalam kondisi baru diganti ole
- Beberapa baut swing bearing tidak terpasan
Urgent remedy
L
remedy required required
PORT
3-Aug-16
RIZAM
5. Check by
PS Territory )( Director PS )
P.
ection result
remedy Need
required attention
isi terlepas
kan pembongkaran oleh custom
en engine tidak lengkap
remedy Need
required attention
VE
da
pool option tidak ada
ak terpasang
y tidak ada
remedy Need
required attention
remedy Need
required attention
ection result
remedy Need
required attention
N PUMP
mp dalam kondisi terlepas
t pump tidak ada
ponen tidak diketahui
remedy Need
required attention
kondisi terlepas
unit hanya cylinder boom
ustomer bahwa cylinder arm da
engkok )
remedy Need
required attention
remedy Need
required attention
ection result
remedy Need
required attention
remedy Need
required attention
E
arriage dalam kondisi baik
remedy Need
required
attention
G
m kondisi baru diganti oleh cu
ng bearing tidak terpasang
remedy Need
required attention
NG
achment tidak ada
pump dan swivel joint dalam kon
mua hose pada komponen terse
User Maintenance Information
Model SK200-8S Customer PT. MARITIM SINAR UTAMA Options and Attachment ROTARY GRAPPLE
Serial NumbYN12-T6268 Hour Meter 15,808 hr
Specificatio LOGGING Application FORESTRY Branch PEKANBARU Name RIZAM Inspection Dat3/8/2016
HYDRAULIC
HYD MAIN PUMP :
- Hydraulic main pump dalam kondisi terlepas
- Regulator dan pilot pump tidak ada
CONTROL VALVE :
- Main relief dan port relief untuk spool option
tidak ada
- Beberapa hose tidak terpasang
SWING MOTOR :
- Swing motor assy dalam kondisi terlepas
CYLINDER :
4 - Yang terpasang di unit hanya cylinder boom 3
TRAVEL MOTOR :
- Komponen travel reduction tidak lengkap
HYD TANK :
- Hyd tank dalam kondisi kosong
PILOT VALVE :
- Pilot valve handle and pilot valve pedal
tidak ada
ELECTRICAL
ELECTRICAL :
- ECU controller, Mechatro controller, fuse
box dan cluster gauge tidak ada
- Semua harness tidak ada
Customer Name
PT. Daya Kobelco CMI
PT. MARITIM SINAR UTAMA Company Pondok Indah Office Tower 3, Suite 1500
and 1602, Jl. Sultan Iskandar Muda Kav.
V-TA
Pondok Indah, Jakarta 12310
MSU 26 Tel 021-7592-2828
Fax 021-7592-2880 / 7592-2822
Customer
Check date 3/8/2016 Mechanic Name RIZAM Sign
Customer
Model SK200-8S Control
Number
Serial Number YN12-T6268 Hour Meter 15,808hr
We would like to inform you that we allowed to carry out the inspection of your machine right now
Please check again the result of the test and the unclear points. Also please don't hesistate to contact our company
Thank you
Photo Test Result
Need Cleaning
Need Repair (Urgent)
Adjustment Required
1 Need Repair (Soon) Need Supply Finished
Need Cleaning
Need Repair (Urgent)
Adjustment Required
2 Need Repair (Soon) Need Supply Finished
Need Cleaning
Need Repair (Urgent)
Adjustment Required
3 Need Repair (Soon) Need Supply Finished
2/5
Customer
Model SK200-8S Serial Number YC11-04909 Number
Need Cleaning
Need Repair (Urgent)
Adjustment Required
5 Need Repair (Soon) Need Supply Finished
Need Cleaning
Need Repair (Urgent) Adjustment Required
6 Need Repair (Soon) Need Supply Finished
C-REPO_201002_1
3/5
Need Cleaning
Need Repair (Urgent)
Adjustment Required
9 Need Repair (Soon) Need Supply Finished
Need Cleaning
Need Repair (Urgent)
Adjustment Required
Need Cleaning
Need Repair (Urgent)
Adjustment Required
10 Need Repair (Soon) Need Supply Finished
Need Cleaning
Need Repair (Urgent)
Adjustment Required
11 Need Repair (Soon) Need Supply Finished
C-REPO_201002_1
4/5
Need Cleaning
Need Repair (Urgent)
Adjustment Required
13 Need Repair (Soon) Need Supply Finished
Need Cleaning
Need Repair (Urgent)
Adjustment Required
15 Need Repair (Soon) Need Supply Finished
C-REPO_201002_1
5/5
Need Cleaning
Need Repair (Urgent)
Adjustment Required
17 Need Repair (Soon) Need Supply Finished
17 Need Repair (Soon) Need Supply Finished
Need Cleaning
Need Repair (Urgent) Adjustment Required
18 Need Repair (Soon) Need Supply Finished
Need Cleaning
Need Repair (Urgent)
Adjustment Required
19 Need Repair (Soon) Need Supply Finished
C-REPO_201002_1
REKOMENDASI SPARE PARTS DAN SERVICE
We would like to inform you that we allowed to carry out the inspection of your machine right now
Please check again the result of the test and the unclear points. Also please don't hesistate to contact our company
Thank you
Battery Test 1 Battery Test 2 System Test
Need to test after charging Battery is discharged, it is not possible to determine the battery function
If you do not fully charged.
Bad, need to change Battery drop. Change is necessary.
The cell is bad, need to cha The battery cell is bad, need to change.
Note
o contact our company
tery function
Analysis Hydraulic Oil Simplicity Report Err:501
(Judgment and results for pollution degree determination from microscope picture)
Precedent
Now
Last Time
Very Last
time
Note : 1. Kelipatan interval HM 2000 rekomendasi ganti dan flushing hydraulic oil
2. Grade Oil Contamination up 3,5 rekomendasi ganti dan flushing hydraulic oil
PERFORMANCE TEST SHEET
Serial Number : YN12-T6268 Inspection Date
Hour Meter : 15808 Inspector
Job Site : PERAWANG Customer
ASTM colour Hydraulic oil Hydraulic oil in tank (Glass New 3.5 1.5 Class
pressure
P1 a1
Boost 37.8 (5480) 1.0 (+100) -0.5 (-0.73)
P2 a2
R 37.8 (5480) 0 -4.0 (-580)
High pressure circuit
Boom a1
Over load relief valve pressure
-5.9 (-855)
Arm a2 Mpa
H PF1/4 37.8 (5480) 0 -4.0 (-580) (psi)
R 37.8 (5480) 0 -4.5 (-711)
Bucket a1
H 39.7 (5760) 0 -5.9 (-855)
RH 29.0 (4205) 6.0 (+870) 0
Swing a2
LH 29.0 (4205) 6.0 (+870) 0
FW
RH a1 34.3 (4970) 0.7 (+100) -0.5 (-0.73)
Travel
RV
FW
LH a2 34.3 (4970) 0.7 (+100) -0.5 (-0.73)
RV
Standar Service
Inspection Item Unit Result
d value Limit
1st speed 30.5 - 27.5 19,4 or less
Sprocket revolution (RH,LH) min
2nd speed 50.4 - 45.6 32,2 or less
Boom Up 2,5 - 3,1 4,2
Down 2,2 - 2,8 3,8
Arm In 3,0 - 3,8 5,0
Operating speed
Measuring
Result Remarks Condititon
Sampling (Oil Analys)
LOW throttle
Full throttle (HI idle)
Perform all
measurement with the
air-conditioner "OFF"
HI idle
Boom up
UNIT
BREAKDOWN Bucket digging
Boom down
Boom up
Arm out
Arm in
Bucket dump
Bucket digging
Swing RH
Swing LH
Simultaneous operation
of travel RH and LH
Result Remarks
UNIT
ATT No
BREAKDOW Load
N
Result Remarks
UNIT
ATT No
BREAKDOW Load
N
DEVICE CHECK SHEET
Serial Number : YN12-T6268 Inspection Date : 3/8/2016
Hour Meter : 15808 Inspector : RIZAM
Job Site : PERAWANG Customer : PT. MARITIM SINAR UTAMA
Year Attachment Boom Arm
Bucket/ F. Grapple/ STD STD
R. Grapple Breaker Long Long
Other Short Short
Bucket Specification Shoe Colour
STD/ Modification STD Steel ... 800 mm STD
Capacity m Modification Rubber ......... mm Customized