北京市三一重机有限公司
Strength Rotary Drilling rig
Strong weathered
Semi- Softer rock
rock layer
weathered
Interlock kelly bar
Semi-weathered
rock layer
Weak Harder rock
weathered Weak weathered
rock layer
unweathered Extreme rock Extremely weak
weathered rock layer Steel casing &
compressor
Normal rock layer
Rotary drilling rig can drill into rock layer
Option of kelly bar
Charter 2 configuration of kelly bar,
bucket ,drilling tool
Quality changes the world
摩擦式钻杆
钻 杆 Friction Kelly Bar
checking new bucket teeth and complete and reliable connection before putting
it down, then slowly lower it.
This kind of bucket is used for hard layer, it may not be drilling into it with big
pressure and high speed. When facing boulder, operator should lift a part of
bucket , then slight squezze again and again.
Generally drill into 2-3 pitch of length spiral ,then lift it. Slowly move it in order
to avoid collsions with pore wall and accident in the hole.
In case of bucket jam when lifting it, operator slowly moves up and down and
rotarys at the jam point. Then releasing jam problem and lift bucket again. Don't
force to lift it with jam .。
Unloading soil when rotary bucket, probidden to lift up and down and
sideward move with attacking at other fixture.
If founding worn and damaged, operator should replace same specification.
If finding foreign body or making drilling tools with incidents as accidents
spiral drilling
spiral drilling
Spiral bucket includes : single spiral (SSA)and double drill(DSA)
Single spiral head is used for rock layer and soil above water level. Cluding single
spiral head and mix spiral head, single rock spiral rig.
Double spiral drilling head is suitable for big diameter & rock drilling hole, it devided
into double-head single spiral drilling and double-head double spiral drilling
双头螺旋钻头主Double spiral drill: double head drilling head, double hard rock drilling
heard, double spiral cone drill, double spiral drill soft rock
Helical drilling head can be divided by its function: Spiral drill press use can be
divided into: rock and soil helical spiral drill bit
Rock heical drilling head:
rock spiral bit to cutthe rock tip with cobalt-tungsten carbide inserts welded
cutter. Mainly used in weathered bedrock, cemented gravel with bigger pebble with
different frozen layer,
Cone snails rock drills
used to hard rock layer, better cemented gravel with pebble and freezing layer.
Single spiral head drill fast , eays to clean residue and small rotation resistance.
Double spiral head has good guide oriented performance , ablity to carry soil. cone
snails are generally devided into 3 types, 180,270,360.the more hard-rock head, the
greater the taper setting.
Rock drill point screw straight single head single-screw, single screw and
double-headed double-spiral. For medium hard strata and weathered permafrost
drilling. It has good direction comparing with cone snails, carrying soil capability, but
rotation resistance larger. Single-bit drilling screw speed, easy slag, turning
resistance. Double-spiral drill-oriented performance, ability to carry soil, but the
rotation resistance is large. )
hard
Extremely hard
rock CB
conglomerate
CB
Centrifugal unloading slag is a rare drill holes for clay, it is suitable for
soft soil and muddy cement rock. It includes centrifugal dumping slag
bucket in the clay(CSB), centrifuge rock drill dumping slag bucket(CRB),
centrifugal discharge residue core drillling (CCB)
Pedestal drill bit
Pedestal drill bit
Construction target:
③. dry drilling
• According to pebble size, content, filling and other features to select dual
(multi) layer tube drill
construction problems in
different layer
Construction is not only workin on e complex layer, in fact, many of the problems come
from different layer,but how to solve it?
Clay layer:Slip (slip recycled clay, clay slip), suction drill, drill does not
move, stumped soil, paste drill.
Sand, sand layers: hole collapse, super side. Operating on the "three slow",
with good slurry.
Silt clay: liquid, suction drill
Frozen: skid
Expansive Soils: necking.
Rock-in
Radical Braking Theory
Rotary drilling rig drills in rock layer by coupling dynamic
and static pressure, it can be divided into three circumstances:
(1) When the dynamic pressure is small than the rock-breaking
critical value, it can only wear rock, the static pressure can
break rock.
(2) Static pressure can only wear rock, the dynamic pressure
can break rock;
(3) Static and dynamic pressure can both break rock.
品 质 改 变 世 界
Common Construction Method
品 质 改 变 世 界
Common Construction Method
品 质 改 变 世 界
Common Construction Method
品 质 改 变 世 界
Common Construction Method
品 质 改 变 世 界
Common Construction Method
品 质 改 变 世 界
Construction promblems and solving ways
品 质 改 变 世 界
Construction promblems and solving ways
(1)Hoisting: Pour slurry into the pile to avoid collapse, use tube and
air compressor to flush the hole, or use anti-circle method to clean the
sediment around the bucket.
Use auxiliary winch to pull out the first section of Kelly bar, then use crane
to hoist Kelly bar section each by each, and weld it. If the main winch steel
rope is not broken, pull out the last section with crane together.
品 质 改 变 世 界
Construction promblems and solving ways
品 质 改 变 世 界
Construction promblems and solving ways
(2)Jack hoisting:
Refer to the way mentioned above until you cannot pull up the last section, put
stones around the casing, strengthen the casing with steel plate, crosstie,
channel iron, process the Kelly bar with 40mm steel plate as the picture below,
weld it, and push two sides of the Kelly bar with two 100ton jacks.
品 质 改 变 世 界
Construction promblems and solving ways
品 质 改 变 世 界
Construction promblems and solving ways
品 质 改 变 世 界
Construction promblems and solving ways
品 质 改 变 世 界
Construction promblems and solving ways
品 质 改 变 世 界
Construction promblems and solving ways
•3. Roll-over:
• make prepares: two cranes, steel rope, steel plate;
• disassembly Kelly bar, move away from the machine;
• two lifting joints: 1m above steady of mast oil cylinder,
movable arm;
• remove all the oil pipes and wires from the two lifting joints
before fasten the steel rope;
• put board or lumber to the lifting places
• conduct two cranes by one person
• lift the mast a little first
• lift the movable arm
• lift the mast slowly to make it erect
• lift the machine to a smooth place by two cranes.
48
Sany's goal and objective
Our target:
“Strive to become first global supplier in construction method
and equipment”
Our objective:
"Create value for customers" to help customer is to help help
ourself. Customer is success is our company success.